HomeMy WebLinkAboutNCC242579_ESC Approval Submitted_20240822 Kent Barney
From: City of Winston-Salem <noreply@geocivix.com>
Sent: Tuesday, August 13, 2024 11:09 AM
To: Kent Barney
Subject: Review Completed - North Point Academy
Application Type: 04.02) Grading/Erosion Control Permit
Workflow: 04.02) Grading& Erosion Control
Project: North Point Academy
A/P#: EN2400153
Acreage to be Disturbed: 2.70
https://winston-salem.geocivix.com/secure/project/?projectid=1368703
Hello Sabrina Frazier Hinton and Victoria M. Frazier,
Thank you for submitting your project to City of Winston-Salem. Review of the Erosion
Control Plan for this project has been completed.The design is adequate to meet the
ordinance standards and the plan has been approved.
Be aware that this plan shall expire three (3) years following the date of approval, if
no land disturbing activity has been undertaken, as is required by Title 15A NCAC 4B
.0129. Also, acceptance and approval of this plan is conditioned upon compliance
with Federal and State water quality laws, regulations, and rules.
If you have not already done so, please provide an original signed and notarized
Financial Responsibility/Ownership (FRO)form as applicable.This document is required
prior to the issuance of the Grading/Erosion Control Permit. If this has already been
provided,then please disregard this statement. Reminder that a completed FRO form is
not required in the instance where a project qualifies to use the HB 489 Sketch Erosion
Control Plan document.
If this project will disturb more than 1 acre or is part of a larger common plan of
development,the Grading/Erosion Control Permit cannot be issued until
documentation is provided that coverage under the NCG01 Construction Stormwater
Permit (NPDES) has been obtained. Please obtain coverage under the permit at the
following website (https://edocs.deq.nc.gov/Forms/NCG01-NOI). Once coverage is
obtained, please upload a copy of the Certificate of Coverage (COC)to the project
documents in the electronic plan review system. The Grading/Erosion Control Permit
will not be issued until proof of coverage under NCG01 is provided. Please direct
i
questions about the eNOI form to NCDEQ - DEMLR Stormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future,the
new responsible party must obtain a new COC. ***This approval email serves as the
"Approval Letter"that must be uploaded when filing the e-NOI application to obtain
the NCGO1 Certificate of Coverage. ***
As outlined in the Unified Development Ordinances (UDO) of Winston-Salem/Forsyth
County,Village of Clemmons,Town of Lewisville, and Town of Walkertown, Erosion
Control Division staff may periodically inspect sites of land disturbing activity to
determine compliance with the Erosion Control ordinances and the approved Erosion
Control Plan. No person shall willfully resist, delay, or obstruct an authorized representative,
employee, or agent of the Erosion Control Division while that person is inspecting or attempting to
inspect a land disturbing activity under the ordinance.
Should you have any questions as you move forward please contact Kent Wall at 336-
462-7481 or kentw@cityofws.org.
Winston-Salem North Carolina and Forsyth County
City Link 311
311 or(336)727-8000
citylink@cityofws.org
100 E.First Street
Winston `27101
City Directory
This email has been scanned for spam and viruses by Proofpoint Essentials. Click here to report this
email as spam.
2