Loading...
HomeMy WebLinkAboutNCC242539_Site Plan or Location Map_20240822 �P� �� � �• /s� �D ',"g_��� GROUND STABILIZATION MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES FOR LOT CONSTRUCTION 301 7. Rtvt °Qyc �i a0"`" a SITE AREA STABILIZATION �'i EXCEPTIONS Npp 0 9 �b DESCRIPTION TIME N w • DESC 0 FRAME c o General-AII measures will be inspected and corrections made after runoff producing rainfalls,or at least once per week minimum.The builder will insure that the construction activities on$ any particular lot do not advancer affect an of the installed erosion control measures.If lot construction dictates,measures will be PERIMETER DIKES, 7 DAYS NONE relocated on the lot to insu a that the potential for sedimentation runoff is eliminated as much as possible.Silt fences and gravel construction entrances will be maintained as suggested in the erosion control manual.Sodding,seeding and mulching will be maintained to insure proper ground stabilizing cover. 4, "Yaot SWALES, DITCHES hll �� /� 3 uu cares% &SLOPES Gravel Construction Entrance-The gravel pad should remain in a condition to prevent mud or sediment from leaving the construction site.This may require periodic topdressing with 2-inch stone.After each rainfall,inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all ao HIGH QUALITY 7 DAYS NONE objectionable materials spilled,washed,or tracked onto public roadways. le$7 .1 WATER ZONES (HOW) Silt Fence-Sediment fences should be inspected at least once a week and after each rainfall event.Any repairs should be made immediately. Damaged or decomposed fabric should be replaced promptly.Any sediment deposits that build up against the fence should be removed and disposed of properly to insure 4pO Jall SITE SLOPES STEEPER 7 DAYS IF SLOPES ARE that the removed sediment does not wash back against the fence.Adequate storage volume should be provided for behind the fence at tall times.Take care to not undermine the fence during cleanout operations. THAN 3:1 10'OR LESS IN General Erasion Control Notes LENGTH AND ARE Sodding-The sod should be properly maintained to insure that the grass take holds in the areas being secured.The sod should be watered as necessary to maintain adequate moisture in the root zone and prevent dormancy of the sod.The sod should not be mowed to close,since this could inhibit adequate growth S9foa, 1.Only the areas shown shall be disturbed. and stabilization of the root bed.The sod should be limed and fertilized as per soiltype recommendations and type of grass recommendations when and if possible. ,pR NOT STEEPER 2. All disturbed areas shall be grassed and p YP 9 4G THAN 2:1, 14 I tL•o mulched as s as possible and maintained g an g- grassing an g s properly ryas an initial pin soil prepara grassing p germinating prope y. y q> s4ryOE DAYS ARE until pemonent cover tablished. Grassing d Mulchin The area to receive d mulching should be d fertilized and limed as necessary tier Ste I Lion. Once the has been laced,the area should be maintained as needed to insure that all areas are tin d An bare areas should be � sire ao ALLOWED repaired,and reseeded as soon as possible.If the time of year does not permit the establishment of a permanent grass,then a temporary grassing should be used until the growing season permits the use of a permanent grass. RO V'-' 40 - SLOPES 3:1 OR 14 DAYS 7 DAYS FOR V FLATTER SLOPES GREATER Wattles-Wattles shall be inspected after signifcant rainfall events.Rills or gullies upslope of the wattle and any undercutting is to be repaired.Sediment deposits that impair the filtration capability of the wattle shall be removed when the sediment reaches one-third of the wattles functional freeboard height.Removed uucxLssata�ROAD oe° THAN 50'IN sediment shall be deposited within the project in such a way that the sediment is not subject to erosion by wind or water. LENGTH UCE 2'8 a B - ALL OTHER AREAS 14 DAYS NONE(EXCEPT Reinforced Silt Fence Outlet-Remove sediment deposits as necessary to provide adequate storage volume for the next rain to reduce pressure on the fence/outlet.Take care to avoid undermining the fence during cleanout.Remove and replace stone as necessary as it becomes clogged with sediment.Remove all J. I SR aes NceIRO P UM a'q - WITH SLOPES FOR PERIMETERS fencing materials and unstable sediment deposits and bring the area to grade and stabilize it after the contributing drainage area has been property stabilized. FLATTER THAN 4:1 AND HOW ZONES) ICINITY MA-Mk ( (N.T.S.) ��� t'--- -...../. �` J - - - - J 7 i'`-- `�\ 1,,.'� �• J ` CONSTRUCTION SCHEDULE —�jr_,����,. r / , {' L.r'' I.Obtain all necessary permits and plan approvals.Erosion and Sediment Control(E&SC)permit and a Certificate of Coverage i 2...".• ` - - - - - - - - - - - - - - - - - - // t a 1 (COC)must be obtained before any land disturbing activities occur.A copy of the E&SC permit,the COC and a hard copy of the i �� - \�.r`` rm.4 . . I r { ^` a r plan must be kept on site,Preferably in n permits box,and accessible during inspection. —— — - _ I-, F a a, 2.Install gravel construction entrances first,then silt fences,reinforced silt fence _ _ scream wanl<a. —— ' v. � .® —ti / tamer N. sy '� • S.Finish clearing and grubbing any necessary areas on the lots as they are started. ———— — \ l .2. \ \ < —1 I-�.--.'w a.Been rut grading and excavation annr:e<a ... ^\ tI / i 5.Begin or continue with house constmetion aetrnnes. //' — \ \ f4 . - - - - \\"•\�, \\ A' Pal ,, " p� 6.Finish all rout grading and house coneWction.All areas not distwbed for]days needs to have temporary or permanent ...{ J ^� `\ groundoover installed, / '—— I ` _, TIlu4Ds / . . . . . . . . . . . . . l " 1 \ 4 l`: ,` '‘, r—1 7.Install Hldriegrad afftandpaens. / ) I I--`; ` `, J +r\ l 9.Final 8 mulching and stabilizing f I I M IIinvolve the installation of sod on the lot The silt fence will / / I /, ` 1 . . ` }• ar Y.—J place until We lot is sodded grass gstabilized d takeshold / I - - - - - -� /) ! - - - - - - - - -\. -//fit 1 ` �,,pJ? 10.Th actor shall conduct self-inspections of the ems d sedimentation control measures and complete the follovnng // / ——— I _ - - -�y``-tee _ - - - - - -4� - - /_ - - - - - - - _ \_ LA.r- ' �, tl' combined self-inspectionf found on the DENIER website / / ./... / _ ` C. ` 1 Hav' hops://www.d•,.nc.g0v/abom/divisions/en<rgy-mineral-and-land-resources/stomrwater/srmmwat<r-program/npdes-conswetion-program. / / / I c'i� \' �a }-' /I� / ,," Twelve months of complete inspection forms shall be kept an site and available for inspection at all times.It is recommended / •I - . _ _ _ _ _ _ _ _ JJe copy be kept' pen..box.Ref G.S.IIlA 54.1 tiv gh G.5.113A 57S ISA NCAC 04A 0101 through lSA ./. - ,�/ !-I I NCC04E0504 GeneralP NCO 010000 NPDES f C A // / I / / / \�32l .�. \ t 1- / I I.S If' P io f d sad' 1 6 performed I every seven calendar days and 7 \ / I / —i],�♦ .,. ��^,pr. / within24h m f very event of greater thanItch.Any needed try shall be mad immediately to maintain measures as designed.All ESC measures shall be maintained.specified in the construct on details on this plan.A min gauge shall be installed ('� r at the project site for monironing. —/ , / I / . . . .PON 0t -� __ .. „•, . \.'T (� `� I, —• -- i——_ iv i LIP<cti0n and final acceptance letters.When vs z,nse is complete,Me pet-mimes shall vwuui DENIER m clove out the E@SC / I / - ay '��---' "' an After DEMLR informs the permute of the project close out via Inspection report Me Name shallvisit 5, / / I / VYiLY. // -,s - , ra y define.r-/NCGOl to submtan electronic Noneeoftemrmation(e NOT)A$120 annual general Perm fee will be charged / / I `134 -{\ I.. g until Me whIOT has been filled out / �' WETLANDS �S`. i-"' wEu . . . . \ / / / • 138 / \ - - - - - F-A .r I \ / / / /�_\ / ` ' ' �' / vo0` --„--� `Y/ / ——J A'SELF-INSPECTION REPORT FOR LAND DISTURBING ACTIVITY AS REQUIRED BY \ / / / / _ `-: - - - - - - - - - n? - - - - - - - - - - "/' - - - - - .-o%A. E-- NCGS 113A-54.1"IS AVAILABLE FOR USE.IT CAN BE COMPLETED BY HAND OR / -- / / k„,. ' ' / \_ COMPLETED AS AN EXCEL SPREADSHEET. / / / ` _ AN ALTERNATIVE IS TO MAKE NOTATIONS ON THE COPY OF THE APPROVED w/ / oo� lA vwEnA D ,rl. Lr.: EROSION AND / / -!Nei- -/ �, f:z - SEDIMENTATION CONTROL PLAN THAT IS KEPT ON THE PROJECT SITE.RULE 15A // 15 LIT / \\ /- " ,-� t NCAC 04B.0131 STATES THAT....DOCUMENTATION SHALL BE ACCOMPLISHED BY �\_ i / tX'/ / _ �. ` % INITIALING ANDDATINGEACH MEASUREORPRACTICESHOWN ON ACOPYOF THE // _, �/ r8/ , \\ - '\t,' -� -� - - �' ' ' '� - - - APPROVEDEROSIONANDSEDIMENTATIONCONTROLPLANSW BYCOMPLETING,J jliftiiiiiiiiiiiiiiii........._---------\\ DATING AND SIGNING AN INSPECTION REPORT THAT LISTS EACH MEASURE, L / / 16 \_ v \- PRACTICE OR DEVICE SHOWN ON THE APPROVED EROSION AND SEDIMENTATION / �/r _R/ __ ———— �.�.w'�. r /�_ CONTROL PLAN." / / / / \ EM DERob AN�Gi �'i _ ''! r ``-"--,r. J •r /U / N LOT$TO REMAN PohA __— Ix,�-..-.�` IA" _ / C g — �r eEo °K, . . . . . ` '/ /n1 i� P / SODDING /" I 17 \ I F :J+.a.'" 'ter Y 12 / � I -wET - I r / r 'tiPATTERN.WATT TNE STRIPS / /7• (ild 1 .. ., NOT OPEP1AP.A SHARPENED P. MAPS SOO CURER MUST BE \�/ N i roG° / / a \\� 21 D LIMIT \ - . TIGHTLY AGAINST EA.OTHER NOWT LEAVE SPACES/KIP DO -_� . . . :.WETLANDS -'t :..7..:", .. 1 { na.NnTnMMNnPrnEt / �' i 19 �� �- 27 —— 28 ,. . . . . �� / , /t'� �� IIIY1Y11 MATCHED / , —� 26 Lot Plan Lot Plan 29 o"`o 'Ay Lot Plan "A" "A"&"E" Lot Plan EONLI / ,«' / tOh Lg \ 25 A / , REMAINDER 111:11 : :' ....,,„...,., .,..., OF \\ A�, 30 LOT 30 TO REMAIN ND SnReED / 46 �\ 11 / o"<' r \ \\\ tso �D / \ Lot Plan - ..IMP N v�v }t�>�,�—� j� � L / / \ \ / , __— I nA��&��Fn ° LIMITS 1 .'7 wpm ."ROLL SOO IMMEDI,E,TO cots ` / / / ELL/// f lr\ mEsolL �nseoN�THE SON Ia Home<1.. WEEKS SET eMo / J 10` / \\NN 23 f // ^11s� / Mahon Co .. • -"A REMAINDER OF /� • en APPEARANCE OF GOOD SOD ,- /4 / �� ---- ---_ / LOT 31 TO REMAIN ;j• 00 '� / \ \...\ 22 / �' / UTIIm IFN.gAgaEMEr / ! 36--1 DISTURBED ,iron o/ `� \ J ��IMITSCONSTRUCTION J j l 1 /z 7 V \V A 34 / z / �t / l 1P. nrrn„<.a�en nn� M /G r 6 \ / / 33� 31 J'8 `�/ l 1 a nit aenaeaaman. 0 / J \ / 32 Lot Plan 1 t / Eck/ I mo,q 36 7 / CONSTRUCTION • ^\\v// , ° \ • %,/\\ ( / /37 I LIMITS a136 /// �./ ,/ ro / Ir • �� aEOP 1 / / N // /, D/ f 4 r�D� / r j �� i \\lIllihhllihih. 1 v/ ' ' 39 I ,' '�• // -•:�'` / ' PAGE 1 of 2 I I TRACT A �, / r'' `3s—— r \I l/ / TUTURERACT B SPACE / ',:'/�%`�-`'` / J TOTAL DISTURBED ACREAGE: 5.75 ACRES V 3 \ i --s'PR31NgcE�-A€MErvT__ ' FUTURE / /' a� �r ',,•"r' / n I �___Jr DEVELOPMENT • / ,,i a.`� \ f LOT EROSION CONTROL PLAN AT 1 \� ° j 40 / �,r- ''' ,r l I >----- (\ V LOTS 26 - 31 ' \� / N A TRACT.0 /."' / \ IN ofi DEVELP�PMENT �• WILLIFORD COVE i �`5 41 z r /' / 2 fir/ �B /OE r \` —— / r / y L_ �� ''' FOR _ 42 r,.--- DREAM FINDERS HOMES, LLC �� ___�\ / 1 I I !� tf - EASTOVER TOWNSHIP CUMBERLAND COUNTY \ s ',SO' f.-''` 1 SCALE:1"=120' JULY 2024 �MD , ��_ j oI �1 — ) GRAPHIC SCALE l o�` 1zo 0 6o no 240 480 r•� — `_ /J 5 NO PCCESa FA5EMEN -- why R°ad S - O ( ` - d `� \ M l Q (IN FEET) 11 I • 1 loch = 120 ft.MOORMAN,KIZER&REITZEL,INC.115 BROADFOOT AVE.FAYETTEVILLE,N.C.28305 1 • r PHONE(910)484-5191 FAX(910)484-0388 LICENSE HF-0106 LAST SAVED:7/25/2024 B:05 AM LAST PLOTTED:7/25/2024 P:24 AM PLOTTED BY.Dennis Gilbert FILENAME:G\CURRENT JOBS\H&H CONSTRUCTORS A23-136]-04 WILLIFORD COVE—EC\PLANS\WILLIFORD COVE EC—LOTS 26-31 0.