Loading...
HomeMy WebLinkAboutNCC202633_NOT Closeout Documents_20240820 Sedimentation/Construction Stormwater Inspection Report North Carolina Department of Environmental Quality Land Resources: 610 East Center Avenue. Suite 301, Mooresville, NC 28115 (704) 663-1699 County: Cabarrus Project: Homestead Subdivision River basin: Yadkin-PeeDee Person financially responsible:Niblock Development Company-William Project#: CABAR-2020-064 Niblock.Vice President Address: 759 Concord Parkway N,Suite 20,Concord,NC 28027 1. Project Location: 12th Fairway Drive NW,Concord Pictures: No 2. Weather and soil conditions: sunny,workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A.and rules? Yes If no.check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? ties Describe: 7. Flas sedimentation damage occurred since last inspection? No if Yes,where? (check all that apply 1 Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: August 02,2024 9. Corrective action needed: 10. Comments: Permanent ground cover sufficient to restrain erosion has been established.No additional self-monitoring or self-inspections are required.Project is in compliance and released under the SPCA.Termination of coverage under the NPDES General Stormwater Permit for Construction Activities(NCGOI)must be requested by the permittee via a Notice of Termination(NOT).The NOT is available at: https:Oedocs.deq.nc.gov'Forms/NCGO1-Termination. Please note that this correspondence must be uploaded as part of completing the NOT process. Reported by: Matthew Gigante Others present: Date of inspection: August 0I,2024 Time arriving on site: 11:05 AM Time leaving site: 11:10 AM cc: