Loading...
HomeMy WebLinkAboutNC0087556_Authorization to Construct_200410060� WArk O� QG 1 0 Michael F. Easley, Governor State of North Carolina William G. Ross, Jr., Secretary Department of Environment and Natural Resources Alan W. Klimek, P.E., Director Division of Water Quality October 6, 2004 Mr. Wendell T. Howard HRS Land Development, LLC 204 Charlotte Highway, Suite G Asheville, North Carolina 28803 Subject: Authorization to Construct ATC No. 087556A01 Ledgestone Subdivision WWTP Buncombe County Dear Mr. Howard: The Division of Water Quality's NPDES Unit has reviewed your request for an Authorization to Construct permit for a new Ledgestone Subdivision WWTP. The Division finds the proposed design to be satisfactory and hereby grants authorization for construction or installation of the following: a new activated sludge treatment system consisting of: • 9,000 gallon flow equalization tank; • 9,000 gallon sludge holding tank; • four 9,000 gallon aeration tanks; • two 4,300 gallon/ 74 sq. ft. hopper -style clarifiers; • two 375 gallon chlorine contact chambers; and • 160 gallon dechlorination chamber; approx.175 lin. ft. of 6" diameter gravity outfall line with endwall; and • all related structures, equipment, piping, controls, and other appurtenances, as presented in the approved plans and specifications. This Authorization to Construct is issued in accordance with Part III, Paragraph A of NPDES Permit No. NC0087556, issued February 28, 2002, and shall be subject to revocation unless the wastewater treatment facilities are constructed in accordance with the conditions and limitations specified in that permit. Upon completion of construction and submittal of an acceptable Engineer's Certification (see below), the approved capacity of the facility shall be set at 0.027 MGD. The Division acknowledges that the design capacity of the facility is 0.036 MGD. However, the allowable discharge remains at 0.027 MGD, consistent with the NPDES permit, and issuance of this ATC does not imply or obligate the Division to approve any future increase in the discharge. Special Provisions In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement wastewater treatment or disposal facilities. Notification Requirements The Permittee shall notify the Asheville Regional Office, telephone number (828) 296-4500, at least North Carolina Division of Water Quality (919) 733-7015 1617 Mail Service Center FAX (919) 733-0719 Raleigh, North Carolina 27699-1617 On the Internet at http://h2o.enr.state.nc.us/ Authorization to Construct October 6, 2004 forty-eight (48) hours in advance of operation of the installed facilities, so that an in -place inspection can be made. Such notification to the regional supervisor shall be made during the normal office hours of 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State Holidays. Engineering Certification Upon completion of construction and prior to operation of the modified facility, the Permittee shall provide the Division with a certification from a professional engineer registered in North Carolina certifying that the permitted facility has been installed in accordance with the NPDES Permit, this Authorization to Construct, and the approved plans and specifications. The certification should be mailed to the NPDES Unit,1617 Mail Service Center, Raleigh, North Carolina 27699-1617. ORC Requirements The Permittee must continue to employ a certified wastewater treatment plant operator in responsible charge (ORC) of the wastewater treatment facilities. The operator must hold a certificate of the type and grade at least equivalent to or greater than the classification assigned to the wastewater treatment facilities by the Certification Commission. The Permittee must also employ a certified back-up operator of the appropriate type and grade to comply with the conditions of Title 15A, Chapter 8G, .0200. The ORC of the facility must visit each Class I facility at least weekly and each Class II, III, and IV facility at least daily, excluding weekends and holidays; and must properly manage and document daily operation and maintenance of the facility and comply with all other conditions of Title 15A, Chapter 8G, .0200. Additional Conditions Failure to abide by the requirements contained in this Authorization to Construct may subject the Permittee to an enforcement action by the Division of Water Quality in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. The issuance of this Authorization to Construct does not relieve the Permittee from its responsibility to comply with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (local, state, and federal) which have jurisdiction. The Permittee shall maintain a copy of the approved plans and specifications on file for the life of the facility. If you have any questions about this Authorization to Construct, please contact Mike Templeton, at (919) 733-5083, extension 541. Sincerely, Alan W. Klimek, P.E. Director Enclosures: Approved Plans & Specifications, Engineer's Certification Form Copies: Mr. David Stroud (w/ engr. cert.) - David D. Smith and Co., 46 Haywood Street, Suite 201 Asheville, NC 28801 Asheville Regional Office, Water Quality Technical Assistance and Certification Unit Central Files (NPDES Unit Files DAVID D. SMITH and COMPANY Civil Engineering Consultants 46 Haywood St., Suite 201A Asheville, NC 28801 LETTER OF TRANSMITTAL Date: September 10, 2004 Project: Ledgestone Wastewater Treatment Plant Project No.: 133201 ......__.w-ram.,-•..... . ram+(..-rrytMylt�M..yI —1L^.T:l:7YT.::�(•i,'1.1e((-:4: ix?e+1`i{t!,?olRrW.oW'I�L✓IWA tons North Carolina Department of Environment and Natural Resources (NCDENR) Division of Water Quality NPDES Permitting Unit 512 N Salisbury Street, 9t" floor Raleigh, North Carolina 27609 Attn: Mike Templeton 0 1 5 2004 t r � DENR - WATER QUALITY POINT SOURCE HANCH E We transmit: ® herewith ❑ under separate cover ❑ in accordance with your request For your: ® approval ❑ information ❑ record The following: ® Drawings ❑ Samples ❑ Change Order ❑ Calculations ❑ distribution to parties ❑ review & comment ❑ use ❑ Shop Drawings Prints ® Specifications ® Literature Copies Date Description 2 9/10/04 Sheet 1 and 2 of 2 — 36, 000 G.P.D. Wastewater Treatment Plant 2 9/03/04 Detail of Flow(Surge) Splitter 2 Flowmeter Specifications Remarks: These drawings should address your e-mailed review comments dated 8-11-04 and we look forward to final approval. Refer to the chart on the drawings for the routing sequence during initial low flow startup. I have sent a copy (the third copy) of this submittal directly to the Local DENR office as you had suggested. As always, please call if you have any questions. By: David J. Straub C: Larry Frost — NCDENR, Asheville Regional Office w/attached Wendell Howard — T& K Utilities w/ attached File w/attached Phone: (828) 254-4448 Fax: (828) 255-0140 DAVID D. SMITH and COMPANY Civil Engineering Consultants 46 Haywood St., Suite 201A Asheville, NC 28801 LETTER OF TRANSMITTAL Date: August 6, 2004 Project: Ledgestone Wastewater Treatment Plant Project No.: 133201 North Carolina Department of Environment and Natural Resources Division of Water Quality NPDES Permitting Unit 1617 Mail Services Center Raleigh, North Carolina 27688-1617 Attn: Mike Templeton We transmit: ® herewith ❑ under separate cover ❑ in accordance with your request For your: ® approval ❑ information ❑ record The following: ® Drawings ❑ Samples ❑ Change Order ❑ Calculations ❑ distribution to parties ❑ review & comment ❑ use ❑ Shop Drawings Prints ❑ Specifications ❑ Literature Copies Date Description 3 7/24/04 Sheet 1 and 2 of 2 — 36, 000 G.P.D. Wastewater Treatment Plant Remarks: These drawings should address the initial review comments re: splitting the system up into a two — train system. Please call if you have any questions. By: David J. Straub C: Wendell Howard — T& K Utilities w/ attached File Phone: (828) 264-4448 Fax: (828) 256-0140 State of North Carolina F�1 <J e Department of Environment ANY :!K;vj and Natural Resources / • • Division of Water Quality �tf Michael F. Easley, Governor William G. Ross, Jr.,Secretary NCDENR Alan W. Klimek, P.E.E., Director March 1, 2004 Mr. Wendell T. Howard HRS Land Development, LLC -204 CHARLOTTE HIGHWAY 20�4 — O SUITE G r%AY 2 8 g `�ASHEVILLE NC 28803 V) Subject: ATC Request Acknowledgment NPDES Permit NCO087556 'n ATC Number 087556AO1 LQ Ledgestone Subdivision WWTP Buncombe County Dear Mr. Howard: The Division received the authorization to construct request and your check (# 8482) for $150.00 on February 24, 2004' This application has been assigned the number highlighted above. Changes in the permitting fees for NPDES facilities took effect on January 1, 1999. Among those changes was the elimination of fees for all authorization to construct permits. I am returning the check you submitted with the authorization to construct request. Please be aware that the Division's regional office, copied below, must provide recommendations from the Regional Supervisor prior to final action by the Division. The ATC review process generally takes 90 days from the date your complete submittal is received, however, due to current staff shortages that review period may take longer. Should any additional information be required, the review engineer will contact you. If you have any questions, please contact Mr. Mike Templeton at (919) 733-5083 ext. 541. PLEASE REFER TO THE ABOVE APPLICATION NUMBER WHEN MAKING ANY INQUIRIES ABOUT THIS APPLICATION. Sincerely,. David A. Goodrich Supervisor, NPDES Unit cc: Asheville Regional Office NPDES Unit Permit File David D. Smith, PE David D. Smith & Company 46 Haywood Street ` r Suite 201-A Asheville, NC 28801 Y } P.O. Box 29535, Raleigh, North Carolina 27626-0535 Telephone 919-733-5083 FAX 919-733-0719 An Equal Opportunity Affirmative Action Employer50% recycled/ 10 h post -consumer paper HRS Land Development, LLC 204 Charlotte Highway, Suite G Asheville, N. C. 28803 February 24, 2004 Valery Stephens N. C. Department of Environment and Natural Resources Division of Water Quality NPDES Permitting Unit 1617 Mail Services Center Raleigh, N. C. 27688-1617 RE: Ledgestone Subdivision Waste Water Treatment Plant NPDES Permit No. NC 0087556 Project No. 133201 Dear Ms Stephens, This letter is in response to your questions concerning the construction of the proposed treatment plant. 1. HRS Land Development, LLC - Contact Person Wendell T. Howard - Partner Office: 828-299-8205 Cellphone: 828-230-3400 2. The name of the proposed subdivision is now called: Ledgestone Subdivision 3. HRS Land Development, LLC authorizes David D. Smith and Company to act in our behalf to assist the completion of this project. I appreciate your assistance. If you have any questions, please call. Sincerely, HRS Land Development, LLC "J /w6w Wendell T. Howard Partner cc: David D Smith & Company 46 Haywood Street, Suite 201-A Asheville, N. C. 28801 MAR 3 2004 ATC PROCESSING Facility: �-e,6Qe �)k-Q- Li/_l PUBLIC INFO. ASSIST. NPDES No.: CHECKLIST ATC No.: SCOPE of Project: NQLO TI0-A-+ - Pull existing permit, (is this action allowed?): Will this activity require a change notice to compliance? Point Assignment: Ao SUBMITTAL: ✓ Letter of Request from the Permittee J(3) Plans, Specifications and Design Calculations * signed & sealed by NC PE ? * three sets of each? ACTION: rejection (reason): hold for: ✓ accept (date): LOG IN & DISPERSAL (Once package is complete): YES NO /Log on BIMS / determine the ATC number/ create and print out tracking slip Loa on the Units' ATC data base Create and send acknowledge letter (date sent): to permittee/consultant/NPDES file j Request Staff Report from Regional Office sent on: (assemble the following and mail by courier to the appropriate RO): * copy of the acknowledgment letter (highlight RO), * copy of the request letter, copy of submittal package (plans, specs and calculations), ASSIGNED: /reviewer. ��iiY�l � �IU � date: ATC process 8127198 DAVID D. SMITH and COMPANY Civil Engineering Consultants 46 Haywood Street, Suite 201-A Asheville, NC 28801 January 28, 2004 Mr. David Goodrich, Supervisor North Carolina Department of Environment and Division of Water Quality NPDES Permitting Unit 1617 Mail Services Center Raleigh, North Carolina 27688-1617 Natural Resources —, Re: Authorization to Construct Ledgestone Subdivision Wastewater Treatment NPDES Permit No. NC 0087556 Project No. 133201 Dear Mr. Goodrich: l FEB -3 �t/Clk Please find enclosed three (3) copies of plans, detailed specifications, this letter for the subject project and the $150.00 permit fee. The discharge permit application was filed under the title of CII Subdivision Wastewater Treatment Plant. However, since that application, the subdivision has been officially named Ledgestone Subdivision. On behalf of the owner, we are requesting authorization to construct. The extended aeration treatment system is designed as follows: Average Daily Hydraulic Flow: 27,000 GPD Electrical: Three Phase 230 Volts Flow Equalization Tank: 8,000 gallons Sludge Tank: 9,000 gallons Aeration: 27,000 gallons Clarifier: 4297 gallons 74 sf surface area Chlorine Contact: 728 gallons De -chlorination: 160 gallons Telephone: (828)254-4448 Fax: (828)255-0140 . , 1 r DAVID D. SMITH and COMPANY Civil Engineering Consultants 46 Haywood Street, Suite 201-A Asheville, NC 28801 Mr. David Goodrich January 28, 2004 Page two Biosolids for the facility shall be hauled to the Metropolitan Sewerage District of Buncombe County for disposal. Please call if you have any questions. Very truly yours, DDS/jsa Telephone: (828)254-4448 Fax: (828)255-0140