Loading...
HomeMy WebLinkAbout20051058 Ver 2_Approval Letter_20071219C~O~ ~ A r~~Q Michael F. Easley, Governor :,,, ~~$ (,~ William G. Ross Jr., Secretary Vj ~ North Carolina Department of Environment and Natural Resources .'S' 0 ~ - ,,K Coleen H. Sullins, Director - ~ Division of Water Quality December 19, 2007 Commanding General, Marine Corps Base Camp Lejeune AC/S EMD M. Korenek PSC Box 20004 Camp Lejeune, NC 28452-0004 Re: Camp Lejeune Greater Sandy Run Area Training Complex Onslow County DWQ #051058; USACE Action ID. No. 200400940 APPROVAL of 401 Water Quality Certification Dear Mr. Korenek: Attached hereto is a copy of Certification No. 3545 issued to the Commanding General of Marine Corps Base Camp Lejeune, dated November 14, 2005. In addition, you should get any other federal, state or local permits before you go ahead with your project including (but not limited to) Solid Waste, Sediment and Erosion Control, Stormwater, Dam Safety, Non-discharge and Water Supply Watershed regulations. This Certification replaces the one issued to you on November 14, 2005. Note that this modification is issued today without the requisite formal modification request or application fee in order to accommodate your training needs. You are required to provide a formal modification request, including the application fee, by January 4, 2008, in order for this Certification to remain valid. If we can be of further assistance, do not hesitate to contact us. CHS/cbk Attachments: Certificate of Completion Si cerely, ~~ Coleen H. Sullins cc: U.S. Army Corps of Engineers, Wilmington Regulatory Field Office Wilmington District, USACOE Chad Coburn, DWQ, Wilmington Regional Office Janet Russell, DLR Wilmington Regional Office Stephen Rynas, Division of Coastal Management, Morehead City File Copy Central Files Filename: 051058CampLej euneGreaterS andyRu n (Onslow)401 _ICMOD NoithCarolina 401 Wetlands Certification Unit ~ vatuCa~~1~ 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 FAX 919-733-68931 Internet: http:/lh2o.enr.state.nc.uslncwetlands An Equal OpportunitylAffirmative Action Employer- 50% Recycled110% Post Consumer Paper Commanding General, Marine Corps Base Camp Lejeune Page 2 of 4 December 19, 2007 NORTH CAROLINA 401 WATER QUALITY CERTIFICATION THIS CERTIFICATION is issued in conformity with the requirements of Section 401 Public Laws 92- 500 and 95-217 of the United States and subject to the North Carolina Division of Water Quality (DWQ) Regulations in 15 NCAC 2H, Section .0500 to the Commanding General of Marine Corps Base Camp Lejeune to fi110.485 acres of jurisdictional wetlands in the White Oak River Basin, associated with the construction of targets and service roads in Onslow County, North Carolina, pursuant to an application filed on the 11th day of July of 2005, and in additional correspondence received September 29, 2005. This modified 401 Water Quality Certification is hereby issued based upon an informal modification request submitted via a-mail on December 19, 2007. In order for this Certification to remain valid, a formal modification request must be received by the DWQ Central Office in Raleigh by January 4, 2008. The application and supporting documentation provides adequate assurance that the proposed work will not result in a violation of applicable Water Quality Standards and discharge guidelines. Therefore, the State of North Carolina certifies that this activity will not violate the applicable portions of Sections 301, 302, 303, 306, 307 of PL 92-500 and PL 95-217 if conducted in accordance with the application, the supporting documentation, and conditions hereinafter set forth. This approval is only valid for the purpose and design submitted in the application materials and as described in the Public Notice. If the project is changed, prior to notification a new application for a new Certification is required. If the property is sold, the new owner must be given a copy of the Certification and approval letter and is thereby responsible for complying with all conditions of this Certification. Any new owner must notify the Division and request the Certification be issued in their name. Should wetland or stream fill be requested in the future, additional compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). If any plan revisions from the approved site plan result in a change in stream or wetland impact or an increase in impervious surfaces, the DWQ shall be notified in writing and a new application for 401 Certification maybe required. For this approval to be valid, compliance with the conditions listed below is required. Conditions of Certification: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification (or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved (Units) Plan Location or Reference Stream N/A (feet) 404 Wetlands 0.485 (acres) Project Boundary "A" & "B" Waters N/A (acres) Buffers N/A (s uare ft.) s Base Camp Lejeune General, Marine Corp page 3 of 4 Commanding December 19, 2007 Hance with all specifications governing Sediment and Erosion Control: aria ement Practices in ion and sediment control practices must be in full comp Eros 'on and operation and maintenance of such Best M g i ed, 2. installati the proper design, ro ect must be es gn order to protect surface waters standards: T tained in accordance with the most recent version o t e he erosion and sediment control measures for the p J d Design Manual. a' erated, and main installed, op ecified North Carolina Sediment anda rosion Control Planning th q tion and maintenance of the sed meT1T and tso p n The design, installation, ope e ual, or exceed, b. rsion of the North Carolina Sediment and Erosion Con ro control measures must be such that they q nstruction sites, borrow sites, and in the most recent ve The devices shall be maintained on a co Manual. including contractor-owned or leased borrow pits waste pile (spoil) projects, the erosion and sediment control measures must be esign associated with the project. ith the most recent version of the it sites, c. For borrow p installed, operated, an e Mining Manualcordance kith the reclamation in c. North Carolina Surfac lementation must comply d, The reclamation measures and imp the ' h the requirements of the Sedimentation Pollution Contro be and accordance wit waters, or riparian areas Y lication. All construction activities, oil solids, or fill of any kind shall occur in wetlands, nt and erosion control Best `A 3. No waste, sp acts depicted in the 404/401Permit App standards, footprint of the imp o eration, and maintenance of sedime uali the design, installation, p ed so that no violations of state water q tY including erform - Management Practices, shall be p wetlands or waters to the maximum extent statutes, or rules occur; laced m e rosion control devices in wetlands and waters is rosion control measures shall not be p ix months of the date that the 4. Sediment and ade restored within - practicable. If placement of sediment and e ble they shall be removed anda the projec unavoida Division of Land Resources has release Continuin Com Hance: Le eune, shall conduct construction s Base Camp J Tequirements General and Marine Corp uality standards (including any ro riate anding and any other app P 5, The Comm manner consistent with State water q water Act) activities in a d of the Clean fiance with section 3030 rsion determines that such sthat State orafederal resulting from comp/ If the D ated or achieved use) or the Division may requirements of State law and federal law. to assure compliance, the failure to sustain a design Hance with " not being met (including. ro riate to assure comp in the violated, or that further condioionclude conditions app p 507 d). Before modify g law is being this Certification NCAC 2H.0 ( s Base Camp reevaluate and modify uirements in accor da Comma ding General and/or Marine Corp vi vide public notice in accordaCe with 15A NCAC such standards and Teq ion shall notify th AC 28.0504. Any " Certification, the Di Corps of Engineers, pro s Base Lejeune and the US Army ublic hearing in accordance with 15A ' e o ortunity for p Commanding General and/or Mof Eng Hers for 2H.0503 and proved pp rovided to the shall be provided to the U the Cl an wa~Act~ad shall also become new or revised conditi~ ngshall be p 404 of Camp I,eJeune in wn ursuant to Section reference in any Permit issued p conditions of the 404 Permit for the project; ? _..f .._. .: a y Commanding General, Marine Corps Base Camp Lejeune Page 4 of 4 December 19, 2007 Miti a~ tion: 6. Compensatory Mitigation Using a Mitigation Bank Mitigation must be provided for the proposed impacts as specified in the table below. We understand that you intend to purchase credits from the Greater Sandy Run Wetland Mitigation Bank in Onslow County as described in your application to meet this mitigation requirement. Our records show that the Greater Sandy Run Wetland Mitigation Bank in Onslow County is available for credit release for your project. This contribution has been determined by the DWQ to be a suitable method to meet the mitigation requirement. Until the Greater Sandy Run Wetland Mitigation Bank receives and clears your check, and proof of payment has been provided to this Office, no impacts specified in this Authorization Certificate shall occur. For accounting purposes, this Authorization Certificate authorizes payment into the Greater Sandy Run Wetland Mitigation Bank to meet the following compensatory mitigation requirement: Compensatory Mitigation River and Sub-basin Number Re uired Stream N/A (feet) N/A Wetlands 2.92 (acres) approved Cape Fear/03030007 11/14/05; additional 0.101 acres required under this modified Certification dated 12/ 19/07 Waters N/A (acres) N/A Also, this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted. in your application shall expire upon expiration of the 404 or LAMA Permit. If this Certification is unacceptable to you, you have the right to an adjudicatory hearing upon written request within sixty (60) days following receipt of this Certification. This request must be in the form of a written petition conforming to Chapter 150B of the North Carolina General Statutes and filed with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, N.C. 27699-6714. If modifications are made to an original Certification, you have the right to an adjudicatory hearing on the modifications upon written request within sixty (60) days following receipt of the Certification. Unless such demands are made, this Certification shall be final and binding. This the 19th day of December, 2007 DIVISION OF WATER QUALITY Coleen H. Sullins CHS/cbk Certification of Completion DWQ Project No.: Applicant: Project Name: County: Date of Issuance of Certification or Authorization: Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification and Buffer Rules, and any subsequent modifications, the applicant is required to return this certificate to the 401 Oversight/Bxpress Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form may be returned to DWQ by the applicant, the applicant's authorized agent, or the project engineer. It is not necessary to send certificates from all of these. Applicant's Certification I, ,hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Agent's Certification I, used in the observation of the compliance and intent of the 401 and other supporting materials. Signature: Date: If this project was designed by a Certified Professional I, as a duly registered Professional (i.e., Engineer, Landscape Architect, Surveyor, etc.) in the State of North Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project, for the Permiee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Date: hereby state that, to the best of my abilities, due care and diligence was construction such that the construction was observed to be built within substantial Water Quality Certification and Buffer Rules, the approved plans and specifications, Signature: Registration No. Date