HomeMy WebLinkAboutNCC232874_MODIFICATION Supporting Documents_20240820 w�;+ Dewberry Engineers Inc. 919.881.9939
Dewberry. 2610 Wycliff Road,Suite 410 919.881.9923 fax
Raleigh,NC 27607 www.dewberry.com
April 30, 2024
Ms. Tamera Eplin
Winston-Salem Regional Office
NCDEQ— Division of Energy, Mineral and Land Resources
450 West Hanes Mill Road
Suite 300
Winston-Salem, NC 27105
336-776-9800
Reference: Duke Energy Carolinas, LLC
R-5759 Statesville Rd Phase 1 Distribution Project (WILKE-2024-002)
Wilkes County
Dewberry Project No. 50160689
Dear Ms. Eplin:
Dewberry Engineers Inc. has modified the Erosion & Sediment Control Plan for this project to
accommodate for changes in the overhead distribution line layout and an addition of 0.3 acres of land
disturbance. This resulted in the limits of disturbance increasing from 10.0 acres to 10.3 acres. We are
requesting a permit modification to include this adjustment for construction purposes.
Included in this submittal are the following:
• $100 supplemental application fee (Check No.201461)
• One (1) copy of the revised Erosion Control Narrative.
• One (1)original and one (1) copy of the revised completed and notarized Financial
Responsibility/Ownership Form and deeds.
• One (1) set of Revised Drawings (full size).
• One (1) copy of the original letter of approval.
Should you have any questions or concerns, please feel free to contact me via phone 919.425.7610 or
e-mail (zeulo@dewberry.com).
Sincerely,
Dewberry Engineers Inc.
Zachary Eulo, P.E.
Project Manager
Enclosures
Cc: Patrick Sizemore, Duke Energy Carolinas, LLC
Page 1 of 1