Loading...
HomeMy WebLinkAboutSW8130412_Historical File_20130430 t®CDE North Carolina Department of Environment and Natural Resources Division of Water Quality Pat McCrory Charles Wakild, P. E. John Skvarla Governor Director Secretary April 30, 2013 Brad Brundage, Vice President DR Horton, Inc. 4073 Belle Terre Blvd. Myrtle Beach, SC 29579 Subject: Stormwater Permit No. SW8 130412 Hawkeswater at the River High Density Subdivision Project Brunswick County Dear Mr. Brundage: The Wilmington Regional Office received a complete Stormwater Management Permit Application for Hawkeswater at the River on April 25, 2013. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW8 130412, dated April 30, 2013, for the construction of the subject project. This permit shall be effective from the date of issuance until April 30, 2021, and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the conditions listed in this permit regarding the Operation and Maintenance of the BMP(s), recordation of deed restrictions, certification of the BMP's, procedures for changes of ownership, transferring the permit, and renewing the permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system, to record deed restrictions, to certify the BMP's, to transfer the permit, or to renew the permit, will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing by filing a written petition with the Office of Administrative Hearings (OAH). The written petition must conform to Chapter 150B of the North Carolina General Statutes, and must be filed with the OAH within thirty(30) days of receipt of this permit. You should contact the OAH with all questions regarding the filing fee(if a filing fee is required) and/or the details of the filing process at 6714 Mail Service Center, Raleigh, NC 27699-6714, or via telephone at 919-431-3000, or visit their website at www.NCOAH.com. Unless such demands are made this permit shall be final and binding. If you have any questions, or need additional information concerning this matter, please contact Chris Baker, or me at(910) 796-7215. Sincerely, } For CharlegWakild, P. E., Director Division of Water Quality GDS/csb: S:IWQS\Stormwater\Permits&Projects120131130412 HD12013 04 permit 130412 cc: Lawrence Gilman, P. E., Cape Fear Engineering, Inc. Brunswick County Inspections Brunswick County Engineering Wilmington Regional Office 1617 Mail Service Center,Raleigh,North Carolina 27699-1617 Location:512 N.Salisbury St.Raleigh,North Carolina 27604 Phone:919-807-6300\FAX:919-807-6492 Internet www.ncwateroualitv.orq One An Equal Opportunity 1 Affirmative Action Employer NorthCaroiina Naturally State Stormwater Management Systems Permit No. SW8 130412 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY SUBDIVISION DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO DR Horton, Inc. Hawkeswater at the River NC 133, Be/ville, Brunswick County FOR THE construction, operation and maintenance of ten (10) wet detention pond(s) in compliance with the provisions of 15A NCAC 2H .1000 (hereafter referred to as the "stormwater rules') and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit. This permit shall be effective from the date of issuance until April 30, 2021 and shall be subject to the following specified conditions and limitations: I. DESIGN STANDARDS 1. This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2. This stormwater system has been approved for the management of stormwater runoff as described in Section 1.5 on pages 3 and 4 of this permit. Phase I of the subdivision is permitted for 351 lots; each allowed a maximum of 4,500 square feet of built-upon area. 3. The runoff from all built-upon area within the permitted drainage area(s) of this project must be directed into the permitted stormwater control system. 4. The tract will be limited to a maximum of 2,472,734 square feet of built-upon area. The wet ponds designated and identified as shown in the tables in section 1.5 on pages 3 and 4 and have been designed to treat the runoff from the impervious surfaces as illustrated in said table. Page 2 of 10 State Stormwater Management Systems Permit No. SW8 130412 5. The following design elements have been permitted for this wet detention pond stormwater facility, and must be provided in the system at all times. I Design Criteria Pond#1 Pond#2 Pond#3 Pond#1 Pond#2 Phase 1 Phase 1 Phase 1 Phase 3 Phase 3 a. Drainage Area,acres: 23.62 14.65 28.17 5.32 25.12 Onsite,ft2 1,028,887 638,154 1,227,085 231,739 1,001,128 Offsite,ft2 None None None None 93,070 b. Total Impervious 368,082 226,512 508,781 106,286 656,516 Surfaces,ft2 (1)Buildings 269,636 166,399 400,316 53,143 103,500 (2)Roads/Parking 98,446 60,113 108,465 53,143 39,621 (3)Sidewalk None None None None 3,547 (4)Future None None None None 509,848 c. Design Storm,inches 1 1 1 1 1 d. Pond Depth,feet 6 4 7 7 7 e. TSS removal 90 90 90 90 90 efficiency,% f. Permanent Pool Elev., 14 17 14 12 13 FMSL g. Perm.Pool Surface 23,813 21,561 21,893 8,379 26,592 Area,ft2 h. Permitted Storage 35,473 20,371 45,164 9,662 60,104 Volume,ft3 i. Temporary Storage Elev.,FMSL 15.4 17.9 15.9 13.1 15 j. Controlling Orifice,"0 3 2 3 1.5 3 pipe k. Permitted Forebay 11,283 5,026 10,573 2,178 16,574 Volume, I. Receiving Stream/River Basin Brunswick River/Cape Fear m.Stream Index Number 1S_77 n. Classification of Water Body SC o. Max.fountain i horsepower 1/3 1/6 1/3 1/8 1/3 Page 3 of 10 State Stormwater Management Systems Permit No. SW8 130412 Design Criteria Pond#3 Pond#4 Pond#5 Pond#6 Pond#7 Phase 3 Phase 3 Phase 3 Phase 3 Phase 3 a. Drainage Area,acres: 0.97 5.68 9.08 9.33 4.43 Onsite,ft2 42,253 247,421 395,525 406,415 172,062 Offsite,ft2 None None None None 20,909 b. Total Impervious 23,958 131,987 207,346 124,146 87,120 Surfaces,ft2 (1)Buildings 10,454 60,984 97,139 65,340 61,855 (2)Roads/Parking 13,504 71,003 110,207 58,806 25,265 (3)Other None None None None None (4)Offsite None None None None None c. Design Storm,inches 1 1 1 1 1 d. Pond Depth,feet 4 4 7 5 5 e. TSS removal 90 90 90 90 90 efficiency,% f. Permanent Pool Elev., 10 8 13 6 6 FMSL g. Perm.Pool Surface 4,026 23,433 10,285 10,116 7,486 Area,ft2 h. Permitted Storage 4,379 24,427 22,944 22,698 8,437 Volume,ft3 I. Temporary Storage 10.5 8.5 14.6 7 6.9 Elev.,FMSL J. Controlling Orifice,"0 1 1.5 1.5 1.5 1.5 pipe I k. Permitted Forebay 8 VJ 1 I 5,900 I 5,116 I 5,89 1 I 2,625 Volume,fN I. Receiving Stream/River Basin Brunswick River/Cape Fear m.Stream Index Number 18-77 n. Classification of Water Body SC o. Max.fountain 1/8 1/4 1/8 1/8 1/8 horsepower II. SCHEDULE OF COMPLIANCE 1. No homeowner/lot owner/developer shall fill in, alter, or pipe any drainage feature (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 2. The permittee is responsible for verifying that the proposed built-upon area for the entire lot does not exceed the maximum allowed by this permit. Once the lot transfer is complete, the built-upon area may not be revised without approval from the Division of Water Quality, and responsibility for meeting the built-upon area limit is transferred to the individual property owner. 3. If an Architectural Review Board or Committee is required to review plans for compliance with the BUA limit, the plans reviewed must include all proposed built-,upon area. Any approvals given by the Board do not relieve the homeowner of the responsibility to maintain compliance with the permitted BUA limit. 4. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. Page 4 of 10 State Stormwater Management Systems Permit No. SW8 130412 5. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surface. 6. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, for any modification to the approved plans, including, but not limited to, those listed below: a. Any revision to the approved plans, regardless of size. b. Project name change. c. Transfer of ownership. d. Redesign or addition to the approved amount of built-upon area. e. Further development, subdivision, acquisition, or sale of any, all or part of the project area. The project area is defined as all property owned by the permittee, for which Sedimentation and Erosion Control Plan approval or a CAMA Major permit was sought. f. Filling in, altering, or piping of any vegetative conveyance shown on the approved plan. 7. The Director may determine that other revisions to the project should require a modification to the permit. 8. All stormwater collection and treatment systems must be located in either dedicated common areas or recorded easements. The final plats for the project will be recorded showing all such required easements, in accordance with the ..„%ek.,,.Noel r I 9. During construction, erosion shall be kept to a minimum and any eroded areas of the system will be repaired immediately. 10. Upon completion of construction, prior to issuance of a Certificate of Occupancy, and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Any deviations from the approved plans and specifications must be noted on the Certification. 11. If the stormwater system was used as an Erosion Control device, it must be restored to design condition prior to operation as a stormwater treatment device, and prior to occupancy of the facility. 12. Permanent seeding requirements for the stormwater control must follow the guidelines established in the North Carolina Erosion and Sediment Control Planning and Design Manual. 13. The permittee shall at all times provide the operation and maintenance necessary to assure that all components of the permitted stormwater system function at optimum efficiency. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals including, but not limited to: a. Semiannual scheduled inspections (every 6 months). b. Sediment removal. c. Mowing and re-vegetation of side slopes. d. Immediate repair of eroded areas. e. Maintenance of side slopes in accordance with approved plans and specifications. f. Debris removal and unclogging of structures, orifice, catch basins and piping. g. Access to all components of the system must be available at all times. Page 5 of 10 State Stormwater Management Systems Permit No. SW8 130412 14. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate the date, activity, name of person performing the work and what actions were taken. 15. This permit shall become void unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 16. Prior to the sale of any lot, the following deed restrictions must be recorded: a. The following covenants are intended to ensure ongoing compliance with State Stormwater Management Permit Number SW8 130412, as issued by the Division of Water Quality under NCAC 2H.1000. b. The State of North Carolina is made a beneficiary of these covenants to the extent necessary to maintain compliance with the Stormwater Management Permit. c. These covenants are to run with the land and be binding on all persons and parties claiming under them. d. The covenants pertaining to stormwater may not be altered or rescinded without the express written consent of the State of North Carolina, Division of Water Quality. e. Alteration of the drainage as shown on the approved plans may not take place without the concurrence of the Division of Water Quality. f. The maximum built-upon area per lot is 4,500 square feet for Phase I. Phases 2 and 3 shall be specified with a future stormwater permit modidication. This allotted amount includes any built-upon area constructed within the iot property boundaries, and that portion of the right-of-way between the front lot line and the edge of the pavement. Built upon area includes, but is not limited to, structures, asphalt, concrete, gravel, brick, stone, slate, coquina and parking areas, but does not include raised, open wood decking, or the water surface of swimming pools. g. All runoff on the lot must drain into the permitted system. This may be accomplished through providing roof drain gutters, which drain to the street, grading the lot to drain toward the street, or grading perimeter swales and directing them into the pond or street. Lots that will naturally drain into the system are not required to provide these measures. h. Built-upon area in excess of the permitted amount will require a permit modification. 17. A copy of the recorded deed restrictions must be submitted to the Division within 30 days of the date of recording the plat, and prior to selling lots. The recorded copy must contain all of the statements above, the signature of the Permittee, the deed book number and page, and the stamp/signature of the Register of Deeds. 18. Prior to transfer of the permit, the stormwater facilities will be inspected by DWQ personnel. The facility must be in compliance with all permit conditions. Any items not in compliance must be repaired or replaced to design condition prior to the transfer. Records of maintenance activities performed to date will be required. Page 6 of 10 State Stormwater Management Systems Permit No. SW8 130412 19. Decorative spray fountains will be allowed in the stormwater treatment system, subject to the following criteria: a. The fountain must draw its water from less than 2' below the permanent pool surface. b. Separated units, where the nozzle, pump and intake are connected by tubing, may be used only if they draw water from the surface in the deepest part of the pond. c. The falling water from the fountain must be centered in the pond, away from the shoreline. d. The maximum horsepower for the fountain's pump is based on the permanent pool volume. The maximum pump power for a fountain in these ponds can be found in Section 1.5 in the stormwater pond tables. III. GENERAL CONDITIONS 1. This permit is not transferable to any person or entity except after notice to and approval by the Director. In the event there is either a desire for the facilities to change ownership, or there is a name change of the Permittee, a completed "Name/Ownership Change Form" must be submitted to the Division of Water Quality, signed by the parties involved, along with the appropriate documentation as listed on page 2 of the form. The project must be in good standing with DWQ. The approval of this request will be considered on its merits and may or may not be approved. 2. The permittee is responsible for compliance with all of the terms and conditions of this permit until such time as the Director approves the transfer request. Neither the sale of the project nor the transfer of common area to a third party constitutes legal transfer of the stormwater permit. 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. 4. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215.6A to 143-215.6C. 5. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances, which may be imposed by other government agencies (local, state, and federal), which have jurisdiction. 6. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 7. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and re-issuance or termination does not stay any permit condition. 8. The Permittee grants permission to staff of the DWQ to access the property for the purposes of inspecting the stormwater facilities during normal business hours. 9. The permittee shall notify the Division in writing of any name, ownership or mailing address changes at least 30 days prior to making such changes. Page 7 of 10 State Stormwater Management Systems Permit No. SW8 130412 10. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of ten years from the date of the completion of construction. 11. The permittee shall submit a permit renewal application request at least 180 days prior to the expiration date of this permit. The renewal request must include the appropriate documentation and the processing fee. Permit issued this the 30th day of April, 2013. NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION harle akild, '. ., Director Division of Water Quality By Authority of the Environmental Management Commission Page 8 of 10 State Stormwater Management Systems Permit No. SW8 130412 Hawkeswater at the River Page 1 of 2 Stormwater Permit No. SW8 130412 Brunswick County Designer's Certification !, , as a duly registered in the State of North Carolina, having been authorized to observe (periodically/weekly/full time) the construction of the project, (Project) for (Project Owner) hereby state that, to the best of my abilities, due care and diligence was used in the observation of the project construction such that the construction was observed to be built within substantial compliance and intent of the approved plans and specifications. The checklist of items on page 2 of this form is a part of this Certification. Noted deviations from approved plans and specifications: SEAL Signature Registration Number Date Page 9 of 10 State Stormwater Management Systems Permit No. SW8 130412 Certification Requirements: Page 2 of 2 1. The drainage area to the system contains approximately the permitted acreage. 2. The drainage area to the system contains no more than the permitted amount of built-upon area. 3. All the built-upon area associated with the project is graded such that the runoff drains to the system. 4. All roof drains are located such that the runoff is directed into the system. 5. The outlet/bypass structure elevations are per the approved plan. 6. The outlet structure is located per the approved plans. 7. Trash rack is provided on the outlet/bypass structure. 8. All slopes are grassed with permanent vegetation. 9. Vegetated slopes are no steeper than 3:1. 10. The inlets are located per the approved plans and do not cause short- circuiting of the system. 11. The permitted amounts of surface area and/or volume have been provided. 12. Required drawdown devices are correctly sized per the approved plans. 13. All required design depths are provided. 14. All required parts of the system are provided, such as a vegetated shelf, a forebay, and the vegetated filter. 15. The required dimensions of the system are provided, per the approved plan. cc: NCDENR-DWQ Regional Office Brunswick County Building Inspections Page 10 of 10 DWQ USE ONLY Date Received Fee Paid Permit Number Applicable Rules: D Coastal SW-1995 ❑Coastal SW-2008 0 Ph II-Post Construction (select all that apply) ❑Non-Coastal SW-HQW/ORW Waters 0 Universal Stormwater Management Plan 0 Other WQ Mgmt Plan: State of North Carolina Department of Environment and Natural Resources Division of Water Quality STORMWATER MANAGEMENT PERMIT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Project Name(subdivision,facility,or establishment name-should be consistent with project name on plans, specifications,letters,operation and maintenance agreements,etc.): Hawkeswater at the River 2. Location of Project(street address): Approx.1.5 miles south on NC-133 from the intersection of US-17 City:Belville County:Brunswick Zip:28451 3. Directions to project(from nearest major intersection): Approx.1.5 miles south on NC-133 from the intersection of US-17 4. Latitude:33°57'10"N Longitude:78°12'25"W of the main entrance to the project. IL PERMIT INFORMATION: 1.a.Specify whether project is(check one): New [Modification ❑Renewal w/ Modificationt tRenewals with modifications also requires SWU-102-Renewal Application Form b.If this application is being submitted as the result of a modification to an existing permit,list the existing permit number ,its issue date(if known) ,and the status of construction: ❑Not Started ['Partially Completed* ❑Completed* *provide a designer's certification 2. Specify the type of project(check one): ['Low Density ®High Density ❑Drains to an Offsite Stormwater System ❑Other 3. If this application is being submitted as the result of a previously returned application or a letter from DWQ requesting a state stormwater management permit application,list the stormwater project number,if assigned, and the previous name of the project,if different than currently proposed, 4.a.Additional Project Requirements(check applicable blanks;information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748): [LAMA Major ❑Sedimentation/Erosion Control:_ ac of Disturbed Area ❑NPDES Industrial Stormwater 0404/401 Permit:Proposed Impacts b.If any of these permits have already been acquired please provide the Project Name,Project/Permit Number, issue date and the type of each permit: 5. Is the project located within 5 miles of a public airport? ZNo ['Yes If yes,see S.L.2012-200,Part VI:http://portal.ncdenr.org/web/wq/ws/su/statesw/rules laws ECEIVEit: APR 2 5 2013 Form SWU-101 Version 06Aug2012 Page 1 of 6 BY: III. CONTACT INFORMATION 1.a.Print Applicant/ Signing Official's name and title(specifically the developer,property owner,lessee, designated government official,individual,etc.who owns the project): Applicant/Organization:DR Horton,Inc. Signing Official&Title:Brad Brundage,Vice President and City Manager b.Contact information for person listed in item la above: Street Address:4073 Belle Terre Blvd City:Myrtle Beach State:SC Zip:29579 Mailing Address(if applicable): City: State: Zip: Phone: f843 ) 646-2305 Fax: ( ) Email:bcbrundage@drhortoncom c.Please check the appropriate box.The applicant listed above is: ®The property owner(Skip to Contact Information,item 3a) ❑Lessee*(Attach a copy of the lease agreement and complete Contact Information,item 2a and 2b below) ❑Purchaser*(Attach a copy of the pending sales agreement and complete Contact Information,item 2a and 2b below) ❑Developer*(Complete Contact Information,item 2a and 2b below.) 2.a.Print Property Owner's name and title below,if you are the lessee,purchaser or developer. (This is the person who owns the property that the project is located on): Property Owner/Organization: Signing Official&Title: b.Contact information for person listed in item 2a above: Street Address: City: State: Zip: Mailing Address(if applicable): City: State: Zip: Phone: ( ) Fax: ( ) Email: 3.a. (Optional)Print the name and title of another contact such as the project's construction supervisor or other person who can answer questions about the project: Other Contact Person/Organization: Signing Official&Title: b.Contact information for person listed in item 3a above: Mailing Address: Ectems-- iv City: State: Zip:_ APR 2 5 2013 Form SWU-101 Version 06Aug2012 Page 2 of 7 nay, Phone: ( ) Fax: ( ) Email: 4. Local jurisdiction for building permits:Brunswick County Point of Contact: Phone#: (910 ) 253-2050 IV. PROJECT INFORMATION 1. In the space provided below,briefly summarize how the stormwater runoff will be treated. Stormwater will be treated with wet detention basins 2.a.If claiming vested rights,identify the supporting documents provided and the date they were approved: ❑Approval of a Site Specific Development Plan or PUD Approval Date: El Valid Building Permit Issued Date: ®Other: Approved Permit(SW8060354) Date:9/9/08 b.If claiming vested rights,identify the regulation(s)the project has been designed in accordance with: ®Coastal SW-1995 ❑Ph II-Post Construction 3. Stormwater runoff from this project drains to the Cape Fear River basin. 4. Total Property Area:166.24 acres 5. Total Coastal Wetlands Area:n/a acres 6. Total Surface Water Area: acres 7. Total Property Area(4)-Total Coastal Wetlands Area(5)-Total Surface Water Area(6)=Total Project Area+:166.24 acres + Total project area shall be calculated to exclude the following: the normal pool of impounded structures, the area between the banks of streams and rivers, the area below the Normal High Water(NH►V)line or Mean High Water (MHW)line,and coastal wetlands landward from the NHW(or MHIM line. The resultant project area is used to calculate overall percent built upon area(B ). Non-coastal wetlands landward of the NHW(or MHVV)line may be included in the total project area. 8. Project percent of impervious area:(Total Impervious Area/Total Project Area)X 100 =43 % 9. How many drainage areas does the project have?10(For high density,count 1 for each proposed engineered stormwater BMP. For low density and other projects,use 1 for the whole property area) 10. Complete the following information for each drainage area identified in Project Information item 9. If there are more than four drainage areas in the project,attach an additional sheet with the information for each area provided in the same format as below. • r� ' CEIVE APR 2 5 2013 Form SWU-101 Version 06Aug2012 Page 3 of 7 BY: Basin Information Drainage Area_ Drainage Area Drainage Area Drainage Area_ Receiving Stream Name See Attached Stream Class * Stream Index Number* Total Drainage Area(sf) On-site Drainage Area(sf) Off-site Drainage Area(sf) Proposed Impervious Area(sf) % Impervious Area"(total) Impervious'Surface Area Drainage Area_ Drainage Area_ Drainage Area Drainage Area_ On-site Buildings/Lots(sf) On-site Streets (sf) On-site Parking (sf) On-site Sidewalks (sf) Other on-site (sf) Future(sf) Off-site (sf) Existing BUA***(sf) Total (sf): * Stream Class and Index Number can be determined at: http://portal.ncdenr.org/web/wq/ps/csu/classifications ** Impervious area is defined as the built upon area including,but not limited to,buildings,roads,parking areas, sidewalks,gravel areas,etc. ***Report only that amount of existing BUA that will remain after development.Do not report any existing BLIA that is to be removed and which will be replaced by new BLIA. 11. How was the off-site impervious area listed above determined?Provide documentation.N/A Proiects in Union County: Contact DWQ Central Office staff to check if the project is located within a Threatened& Endangered Species watershed that may be subject to more stringent stormwater requirements as per 15,4 NCAC 02B.0600. V. SUPPLEMENT AND O&M FORMS The applicable state stormwater management permit supplement and operation and maintenance(O&M)forms must be submitted for each BMP specified for this project. The latest versions of the forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/bmp-manual. VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality(DWQ). A complete package includes all of the items listed below. A detailed application instruction sheet and BMP checklists are available from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. The complete application package should be submitted to the appropriate DWQ Office. (The appropriate office may be found by locating project on the interactive online map at http://portal.ncdenr.org/web/wq/ws/su/maps.) Please indicate that the following required information have been provided by initialing in the space provided for each item.All original documents MUST be signed and initialed in blue ink. Download the latest versions for each submitted application package from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms docs. 1. Original and one copy of the Stormwater Management Permit Application Form. 2. Original and one copy of the signed and notarized Deed Restrictions&Protective Covenants Form. (if required as per Part VII below) 3. Original of the applicable Supplement Form(s) (sealed,signed and dated)and O&M agreement(s)for each BMP. 4. Permit application processing fee of$505 payable to NCDENR. (For an Express review,refer to tv c1 ic http://www.envhelp.org/pages/onestopexpress.html for information on the Express program and the associated fees. Contact the appropriate regional office Express Permit Coordinator for additional information and to schedule the required application meeting.) APR 2 5 2013 Form SWU-101 Version 06Aug2012 Page 4 of 7 BY: Basin Information #I : Phase 1 Pond 1 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area I ,028,887 Existing Impervious*Area - Proposed Impervious*Area 368,082 %Impervious*Area(total) 36% i Impervious* Surface Area #I : Phase I Pond 1 On-site Buildings 269,636 On-site Streets 98,446 On-site Parking - On-site Sidewalks - Other on-site - Future(Reserve) - Total: 368,082 Basin Information #2: Phase I Pond 2 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 638, 154 Existing Impervious*Area - Proposed Impervious*Area 226,512 %Impervious*Area(total) 35% Impervious*Surface Area I #2: Phase I Pond 2 1 On-site Buildings 166,399 On-site Streets 60,113 On-site Parking On-site Sidewalks - Other on-site - Future(Reserve) - Total: 266,512 Basin Information #3: Phase I Pond 3 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 1 ,227,085 Existing Impervious*Area - Proposed Impervious*Area 508,78 I %Impervious*Area(total) 4 I% Impervious* Surface Area #3: Phase I Pond 3 On-site Buildings 400,316 On-site Streets 108,465 On-site Parking - On-site Sidewalks - 1 Other on-site Future(Reserve) Total: I 508,781 )ECEVEi.:; APR 252013 U BY: Basin Information #4: Phase 3 Pond 1 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 231 .739 Existing Impervious*Area - Proposed Impervious*Area 106,286 %Impervious*Area(total) 46% Impervious* Surface Area #4: Phase 3 Pond I On-site Buildings 53,143 On-site Streets 53,143 On-site Parking - On-site Sidewalks - Other on-site - Future(Reserve) - Total: 106,286 Basin Information #5: Phase 3 Pond 2 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Total Drainage Basin Area 1 ,094, 198 Onsite Drainage Area 1 ,001 , 128 Offsite Drainage Area 93,070 Existing Impervious*Area - Proposed Impervious*Area 656,5 16 %Impervious*Area(total) 60% Impervious* Surface Area #5: Phase 3 Pond 2 On-site Buildings 103,500 On-site Streets 39,62 I On-site Parking - On-site Sidewalks 3,547 Other on-site - Future(PHASE 2 AREA) 509,848 Total: 656,516 Basin Information #6: Phase 3 Pond 3 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 42,253 Existing Impervious*Area - Proposed Impervious*Area 23,958 %Impervious*Area(total) 57% Impervious* Surface Area #6: Phase 3 Pond 3 On-site Buildings 10,454 On-site Streets 13,504 On-site Parking - On-site Sidewalks I Other on-site - Future(Reserve) - Total: 23,958 ;' C E1VE 11 APR 2 5 2013 BY: Basin Information #7: Phase 3 Pond 4 Receiving Stream Name Brunswick River Receiving Stream Class 5C 18-77 Drainage Basin Area 247,421 Existing Impervious*Area - Proposed Impervious*Area 131 ,987 %Impervious*Area(total) 54% Impervious*Surface Area _ #7: Phase 3 Pond 4 On-site Buildings _� 69,984 On-site Streets 71,003 On-site Parking - On-site Sidewalks - Other on-site - Future(Reserve) - Total: 131 ,987 Basin Information #8: Phase 3 Pond 5 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 395,525 Existing Impervious*Area - Proposed Impervious*Area 207,346 %Impervious*Area(total) 53% Impervious*Surface Area 1 #8: Phase 3 Pond 5 On-site Buildings 97,139 On-site Streets 110,207 On-site Parking - On-site Sidewalks - Other on-site - Future(Reserve) Total: 207,346 Basin Information #9: Phase 3 Pond 6 Receiving Stream Name Brunswick River Receiving Stream Class SC 18-77 Drainage Basin Area 406,415 Existing Impervious*Area - Proposed Impervious*Area 1 24, 146 %Impervious*Area(total) 3 I% Impervious*Surface Area #9: Phase 3 Pond 6 On-site Buildings 65,340 On-site Streets 58,806 On-site Parking - On-site Sidewalks Other on-site - I Future(Reserve) - 1 24 Total: 124, 146 ECE1VE? APR 2 5 2013 17) BY: Basin Information #10: Phase 3 Pond 7 Receiving Stream Name Brunswick River Receiving Stream Class 5C 18-77 Total Drainage Basin Area 192,971 Onsite Drainage Area 172,062 Offsite Drainage Area 20,909 Existing Impervious*Area - Proposed Impervious*Area 87,120 %Impervious*Area(total) 45.2% Impervious* Surface Area #10: Phase 3 Pond 7 On-site Buildings 58,054 On-site Streets 29,066 On-site Parking - On-site Sidewalks - Other on-site Future(Reserve) - Total: 87,120 lECEIV E i) APR 2 5 2013 BY: 5. A detailed narrative(one to two pages) describing the stormwater treatment/managementfor 11ht the project. This is required in addition to the brief summary provided in the Project Information,item 1. 6. A USGS map identifying the site location. If the receiving stream is reported as class SA or the I".11-k receiving stream drains to class SA waters within 1/2 mile of the site boundary,include the 1/2 mile radius on the map. pea"1 ? 7. Sealed,signed and dated calculations(one copy). NVTIA 8. Two sets of plans folded to 8.5"x 14" (sealed,signed,&dated),including: {,. a. Development/Project name. b. Engineer and firm. c. Location map with named streets and NCSR numbers. d. Legend. e. North arrow. f. Scale. g. Revision number and dates. h. Identify all surface waters on the plans by delineating the normal pool elevation of impounded structures,the banks of streams and rivers,the MHW or NHW line of tidal waters,and any coastal wetlands landward of the MHW or NHW lines. • Delineate the vegetated buffer landward from the normal pool elevation of impounded structures,the banks of streams or rivers,and the MHW(or NHW)of tidal waters. i. Dimensioned property/project boundary with bearings&distances. j. Site Layout with all BUA identified and dimensioned. k. Existing contours,proposed contours,spot elevations,finished floor elevations. L Details of roads,drainage features,collection systems,and stormwater control measures. m.Wetlands delineated,or a note on the plans that none exist. (Must be delineated by a qualified person. Provide documentation of qualifications and identify the person who made the determination on the plans. n. Existing drainage(including off-site),drainage easements,pipe sizes,runoff calculations. o. Drainage areas delineated(included in the main set of plans,not as a separate document). p. Vegetated buffers(where required). 9. Copy of any applicable soils report with the associated SHWT elevations(Please identify elevations in addition to depths)as well as a map of the boring locations with the existing elevations and boring logs.Include an 8.5"x11"copy of the NRCS County Soils map with the project area clearly delineated. For projects with infiltration BMPs,the report should also include the soil type,expected infiltration rate,and the method of determining the infiltration rate. (Infiltration Devices submitted to WiRO:Schedule a site visit for DWQ to verify the SHWT prior to submittal, (910) 796-7378.) 10. A copy of the most current property deed.Deed book: 3ss4- Page No: S t d M'f'1.1 11. For corporations and limited liability corporations(LLC):Provide documentation from the NC Wert} Secretary of State or other official documentation,which supports the titles and positions held by the persons listed in Contact Information,item 1a,2a,and/or 3a per 15A NCAC 2H.1003(e). The corporation or LLC must be listed as an active corporation in good standing with the NC Secretary of State,otherwise the application will be returned. http://www.secretary.state.nc.us/Corporations/CSearch.aspx VII. DEED RESTRICTIONS AND PROTECTIVE COVENANTS For all subdivisions,outparcels,and future development,the appropriate property restrictions and protective covenants are required to be recorded prior to the sale of any lot. If lot sizes vary significantly or the proposed BUA allocations vary,a table listing each lot number,lot size,and the allowable built-upon area must be provided as an attachment to the completed and notarized deed restriction form. The appropriate deed restrictions and protective covenants forms can be downloaded from http://portal.ncdenr.org/web/wq/ws/su/statesw/forms does.Download the latest versions for each submittal. In the instances where the applicant is different than the property owner,it is the responsibility of the property owner to sign the deed restrictions and protective covenants form while the applicant is responsible for ensuring that the deed restrictions are recorded. By the notarized signature(s)below,the permit holder(s)certify that the recorded property restrictions and protective covenants for this project,if required,shall include all the items required in the permit and listed on the forms available on the website,that the covenants will be binding on all parties and persons claiming under them,that they will run with the land,that the required covenants cannot be changed or deleted without concurrence from the NC DWQ,and that they will be recorded prior to the sale of aIy APR 2 5 2013 Form SWU-101 Version 06Aug20 12 Page 5 of 7 I BY: VIII. CONSULTANT INFORMATION AND AUTHORIZATION Applicant: Complete this section if you wish to designate authority to another individual and/or firm(such as a consulting engineer and/or firm)so that they may provide information on your behalf for this project(such as addressing requests for additional information). Consulting Engineer:Matthew Haley,P.E. Consulting Firm:Cape Fear Engineering,Inc Mailing Address:151 Poole Road,Suite 100 City:Belville State:NC Zip:28451 Phone: (910 ) 383-1044 Fax: (910 ) 383-1045 Email:matt.haley@capefearengineering.com IX. PROPERTY OWNER AUTHORIZATION(if Contact Information,item 2 has been filled out,complete this section) I, (print or type name of person listed in Contact Information, item 2a) ,certify that I own the property identified in this permit application,and thus give permission to (print or type name of person Iisted in Contact Information,item 1a) with(print or type name of organization listed in Contact Information,item la) to develop the project as currently proposed. A copy of the lease agreement or pending property sales contract has been provided with the submittal,which indicates the party responsible for the operation and maintenance of the stormwater system. As the legal property owner I acknowledge,understand,and agree by my signature below,that if my designated agent(entity listed in Contact Information,item 1)dissolves their company and/or cancels or defaults on their lease agreement,or pending sale,responsibility for compliance with the DWQ Stormwater permit reverts back to me,the property owner.As the property owner,it is my responsibility to notify DWQ immediately and submit a completed Name/Ownership Change Form within 30 days;otherwise I will be operating a stormwater treatment facility without a valid permit. I understand that the operation of a stormwater treatment facility without a valid permit is a violation of NC General Statue 143-215.1 and may result in appropriate enforcement action including the assessment of civil penalties of up to$25,000 per day,pursuant to NCGS 143-215.6. Signature: Date: I, ,a Notary Public for the State of ,County of ,do hereby certify that personally appeared before me this_day of ,and acknowledge the due execution of the application for a stormwater permit. Witness my hand and official seal, SEAL My commission expires 1ECEIVE) APR 2 5 2013 li Form SWU-101 Version 06Aug2012 Page 6 of 7 BY: X. APPLICANT'S CERTIFICATION I, (print or type name of person listed in Contact Information,item la)Brad Brundage certify that the information included on this permit application form is,to the best of my knowledge,correct and that the project will be constructed in conformance with the approved plans,that the required deed restrictions and protective covenants will be recorded,and that the proposed project complies with the requirements of the applicable stormwater rules under 15A NCA 2H.1000 and any other applicable state stormwater� requirements. Signature: a/1 ,t / ' Date: / -a (' /3 I, T 5CQTI *Aohlatit. ,a Notary Public for the State of 11I2.' l CCM Dl11'1Ii,County of (I.V$i,.&I►tit ,do hereby certify that 43YQ.A eruy4QLtt. personally appeared before me this Z4 day of Apr,I ,213 ,and a o ledge ue executi. of the application for a stormwater permit. Witness my hand and official seal, // ,0 1KI VA.,. SEAL , ........ • y,_ E 4su B LA° ?•` My commission expires 3.41-41 ..... ' Novi41 i '('�\��\� f f�111l111I1111111\�\\\ APR 2 5 2013 Form SWU-101 Version 06Aug2012 Page 7 of 7 BY: Permit Number: /moor ' (to be provided by DWQ) Drainage Area Number:*-1: P 3 Pn 00 4- Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does ® does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. - Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. E Form SW401-Wet Detention Basin O&M-Rev.4 Page 1 of 4 2 APR 5 2013 RV. Permit Number: (to be provided by DWQ) Drainage Area Number: '1: 'p 3 p'p 4, BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The vegetated sheit Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other Remove the plants by wiping them invasive plants cover 50% of I with pesticide(do not spray). I the basin surface. I J Y APR 2 5 2O3 Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number:*'l; ?also 4. BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment. remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.0 feet in the main pond, the sediment shall be removed. When the permanent pool depth reads 2.25 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) Permanent Pool Elevation 8_0 Sediment Removal .5.75* —157e P 1 144.471 Valium Sediment Removal Elevation 5.0* 157• Valium Bottom Elevatio 5.0* 2670 t meat Bottom Elevation 4.0* 257.. Sit IStercese FOREBA Y MAIN POND •JJ•d.,ra wl N . APR 2 5 2033 * M aaiGtAu- t petz&A.t-r eD u AL Sf.1b 04,0ss qr Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Hawkeswater at the River BMP drainage area number:#7: Phase 3 Pond 4 Print name:Brad Brundage Title:Vice President and City Manager Address:4073 Belle Terre Blvd,Myrtle Beach, SC 29579 Phone:(843)315-9399 Signature: Date: t/-21"- 13 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, )I. Sco1* %vD' eIsjJt_. , a Notary Public for the State of NiD�` 1 Ct ro , County of brim Suva. , do hereby certify that bra 1 rwidgfiG personally appeared before me this 24 day of 4py'J , 2D13 , and acknowledge the due execution of the forgoing w t detention basin maintenance requirements. Witness my hand and official seal, 4144* .�apTAgY . 'Wows SEAL My commission expires 3—21-11 APR 2 5 2013 Form SW401-Wet Detention Basin O&M-Rev.4 Page 4 of 4 Permit Number: ` 7 /2 (to be provided by DWQ) Drainage Area Numberr#9 ; P(k 3 Tbuo Wet Detention Basin Operation and Maintenance Agreement I will keep a maintenance record on this BMP. This maintenance record will be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected,repaired or replaced immediately. These deficiencies can affect the integrity of structures,safety of the public,and the removal efficiency of the BMP. The wet detention basin system is defined as the wet detention basin, pretreatment including forebays and the vegetated filter if one is provided. This system (check one): ❑ does 171 does not incorporate a vegetated filter at the outlet. This system (check one): ❑ does ® does not incorporate pretreatment other than a forebay. Important maintenance procedures: - Immediately after the wet detention basin is established,the plants on the vegetated shelf and perimeter of the basin should be watered twice weekly if needed,until the plants become established (commonly six weeks). - No portion of the wet detention pond should be fertilized after the first initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover should be maintained in the drainage area to reduce the sediment load to the wet detention basin. - If the basin must be drained for an emergency or to perform maintenance,the flushing of sediment through the emergency drain should be minimized to the maximum extent practical. - Once a year,a dam safety expert should inspect the embankment. After the wet detention pond is established,it should be inspected once a month and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County). Records of operation and maintenance should be kept in a known set location and must be available upon request. Inspection activities shall be performed as follows. Any problems that are found shall be repaired immediately. BMP element: Potential problem: How I will remediate the problem: The entire BMP Trash/debris is present. Remove the trash/debris. The perimeter of the wet Areas of bare soil and/or Regrade the soil if necessary to detention basin erosive gullies have formed. remove the gully,and then plant a ground cover and water until it is established. Provide lime and a one-time fertilizer application. Vegetation is too short or too Maintain vegetation at a height of long. approximately six inches. Form SW401-Wet Detention Basin O&M-Rev.4 111 APR 2 5 2033 ' Page 1 of 4 � Permit Number: (to be provided by DWQ) Drainage Area Number:'; ft}3 fl,ND (o BMP element: Potential problem: How I will remediate the problem: The inlet device: pipe or The pipe is clogged. Unclog the pipe. Dispose of the swale sediment off-site. The pipe is cracked or Replace the pipe. otherwise damaged. Erosion is occurring in the Regrade the swale if necessary to swale. smooth it over and provide erosion control devices such as reinforced turf matting or riprap to avoid future problems with erosion. The forebay Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design depth for possible. Remove the sediment and sediment storage. dispose of it in a location where it will not cause impacts to streams or the BMP. Erosion has occurred. Provide additional erosion protection such as reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. i he vegetated shelf Best professional practices Prune according to best professional show that pruning is needed practices to maintain optimal plant health. Plants are dead,diseased or Determine the source of the dying. problem: soils,hydrology,disease, etc. Remedy the problem and replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test indicates it is necessary. Weeds are present. Remove the weeds,preferably by hand. If pesticide is used,wipe it on the plants rather than spraying. The main treatment area Sediment has accumulated to Search for the source of the a depth greater than the sediment and remedy the problem if original design sediment possible. Remove the sediment and storage depth. dispose of it in a location where it will not cause impacts to streams or the BMP. Algal growth covers over Consult a professional to remove 50% of the area. and control the algal growth. Cattails,phragmites or other I Remove the plants by wiping them invasive plant,cover 50% of I with pesticide(do not spray). the basin surface. I i nECEIVE,i) Form SW401-Wet Detention Basin O&M-Rev.4 Page 2 of 4 4 BY: Permit Number: (to be provided by DWQ) Drainage Area Number:1 S Pb+LSD (p BMP element: Potential problem: How I will remediate the problem: The embankment Shrubs have started to grow Remove shrubs immediately. on the embankment. Evidence of muskrat or Use traps to remove muskrats and beaver activity is present. consult a professional to remove beavers. A tree has started to grow on Consult a dam safety specialist to the embankment remove the tree. An annual inspection by an Make all needed repairs. appropriate professional shows that the embankment needs repair. (if applicable) The outlet device Clogging has occurred. Clean out the outlet device. Dispose of the sediment off-site. The outlet device is damaged Repair or replace the outlet device. The receiving water Erosion or other signs of Contact the local NC Division of damage have occurred at the Water Quality Regional Office,or outlet. the 401 Oversight Unit at 919-733- 1786. The measuring device used to determine the sediment elevation shall be sucl, that it will give an accurate depth reading and not readily penetrate into accumulated sediments. When the permanent pool depth reads 3.75 feet in the main pond,the sediment shall be removed. When the permanent pool depth reads 3.0 feet in the forebay,the sediment shall be removed. BASIN DIAGRAM (fill in the blanks) 0 Permanent Pool Elevation 6.0 Sediment Removal .3.0* 1Gab.1 P 1 Volume Sediment Removal Elevation 2.25* 'l57. Volume Bottom Elevatio 2.0* z.57,1 25�. Scdhn nt Bottom Elevation 1.0* Storage Freelintest Stamm. FOREBAY MAIN POND _ 11 APR 252:,:3 ij RV- * itscs ocitakN . Form SW401-Wet Detention Basin O&M-Rev.4 Page 3 of 4 Permit Number: (to be provided by DWQ) I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed above. I agree to notify DWQ of any problems with the system or prior to any changes to the system or responsible party. Project name:Hawkeswater at the River BMP drainage area number:#9: Phase 3 Pond 6 Print name:Brad Brundage Title:Vice President and City Manager Address:4073 Belle Terre Blvd, Myrtle Beach, SC 29579 Phone:(843)315-9399 Signature: (. Date: _a y r 3 Note: The legally responsible party should not be a homeowners association unless more than 50%of the lots have been sold and a resident of the subdivision has been named the president. I, l Ste- ) 14'ii b , a Notary Public for the State of NfOA,714 pil/ , , Coun of &Y/,cf3WIGt , do hereby certify that 6f2J F/14F) C. personally appeared before me this 2 day of 4114 I , Zn13 , and acknowledge the due execution of the forgoing a detentio basin mainte ance requirements. Witness my hand and official seal, r 0Nllu1111"/ aick plARy _ • b /‘;>Pus‘ 'yANCOR' SEAL My commission expires 3-24-I I— Form SW401-Wet Detention Basin O&M-Rev.4 APR 2 5 2A Page 4 of 4 BY: Permit No. `j:'1),4JI�--- (to be provided by DWQ) oapF WATF4,QG �� y r ,■_D_f\ N STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out printed and submitted. The Required Items Checklist(Part Ill)must be printed,filled out and submitted along with all of the required information. Project name HAWKESWATER AT THE RIVER Contact person MATTHEW HALEY,PE Phone number 910-383-1044 Date 4/24/2013 Drainage area number #7:PHASE 3 POND 4 re.OESIGINIFORIKTICII Site Characteristics Drainage area 247,421 ft2 * INSDIGYCE—S ` kikr VAUje 1.4As Impervious area,post-development 131,987 ft2 WM. Red 1, °V- aERav-"i lec, rious 53 in Design rainfall depth 1.0 in —site 1' CW4evKAL EtIOAtrTINS4 Storage Volume: Non-SA Waters Minimum volume required 11,052 ft3 Volume omvided 24,497 f:3 OK,volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5"runoff volume ft3 Pre-development 1-yr,24-hr runoff ft3 Post-development 1-yr,24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? N (Y or N) 1-yr,24-hr rainfall depth irr Rational C,pre-development (unitless) Rational C,post-development (unilless) Rainfall intensity:1-yr,24-hr storm in/hr Pre-development 1-yr,24-hr peak flow ft3/sec Post-development 1-yr,24-hr peak flow ft3/sec Pre/Post 1-yr,24-hr peak flow control ft3/sec Elevations Temporary pool elevation 8.50 frnsl Permanent pool elevation 8,00 fmsl SHWT elevation(approx.at the perm.pool elevation) *fmsl Top of 10ft vegetated shelf elevation 8.00 fmsl Bottom of 10ft vegetated shelf elevation 7.00 fmsl Sediment cleanout,top elevation(bottom of pond) 5.00 fmsl Sediment cleanout,bottom elevation 4.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp.pool? Y (Y or N) Elevation of the top of the additional volume 8.5 fmsl OK ErV APR 252013 I) Form SW401-Wet Detention Basin-Rev.9-4/1a/12 Parts I.&II.Design Summary,Page 1 of 2 BY: Permit No. (to be provided by DWQ) Surface Areas Area,temporary pool *ft2 Area REQUIRED,permanent pool 11,629 ft2 SA/DA ratio 4.70(unitless) Area PROVIDED,permanent pool,Apo„„_000l 24,433 ft2 OK Area,bottom of 10ft vegetated shelf,Aiouhe * ft2 Area,sediment cleanout,top elevation(bottom of pond),A ot_po„d * ft2 Volumes Volume,temporary pool 24,427 ft3 OK Volume,permanent pool,Vo,o,„,001 63,B49 ft3 Volume,forebay(sum of forebays if more than one forebay) 5,900 ft3 Forebay%of permanent pool volume 9.2% % Insufficient forebay voltll E. clield.pez.Arvreo SA/DA Table Data Design TSS removal 90% Coastal SA/DA Table Used? Y (Y or N) Mountain/Piedmont SA/DA Table Used? N (Y or N) SA/DA ratio _ 4.70(unitless) Average depth(used in SA/DA table): Calculation option 1 used?(See Figure 10-2b) (Y or N) Volume,permanent pool,Voon„,001 63,829 ft3 Area provided,permanent pool,Apo,„ y 24,433 ft2 Average depth calculated ft Need 3 ft min. Average depth used in SA/DA,do,,(Round to nearest 0.5ft) ft Calculation option 2 used?(See Figure 10-2b) * (Y or N) Area provided,permanent pool,A„,„,,, , , 24,433 ft2 Area,bottom of 10ft vegetated shelf,Ay,ohelf * ft2 Area,sediment cleanout,top elevation(bottom of pond),Armond * ft2 "Depth"(distance b/w bottom of 10ft shelf and top of sediment) 2.00 ft Average depth calculated ft Average depth used in SA/DA,day,(Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice(if circular) 1.50 in Area of orifice(if-non-circular) in2 Coefficient of discharge(Co) 0.60(unitless) Driving head(Ho) 0.22 ft Drawdown through weir? N (Y or N) Weir type (unitless) Coeffldent of discharge(Cv) (unitless) Length of weir(L) ft Driving head(H) ft Pre-development 1-yr,24-hr peak flow ft3Isec Post-development 1-yr,24-hr peak flow ft2/sec Storage volume discharge rate(through discharge orifice or weir) 0.03 ft3/sec -Storage volume discharge rate greater than pre-dev.1yr24hr. Storage volume drawdown time 4.62 days OK,draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio >3 :1 OK Length to width ratio >1.5 :1 OK Trash rack for overflow&orifice? Y (Y or N) OK Freeboard provided ft Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PORTABLE PUMP 4 Form SW401-Wet Detention Basin-Rev.9-4/1a/12 i APR 2 5 2013 Parts I.&II.Design Summary,Page 2 of 2 BY: Permit No. (to be provided by DWQ) PA 3 —IPot41 -4 4- ..Y •. es a''If- ism Yiit !`'.s - Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the appiicant has designated an agent,the agent may initial below. If a requirement has not been met,attach justification. Pagel Plan Initials Sheet No. prrai SGJ't 1. Plans(1"-50'or larger)of the entire site showing: SGJ-2- -Design at ultimate build-out, 56z_5 -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. M'n-4 P' 2.Partial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, -Forebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf,and Filter strip. My 4 ''"s 3. Section view of the wet detention basin(1"- 20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. M-n 4 td 1A 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. CAuS 5.A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. 11ArtY N,k 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. Mn{ 1,14cLuDia 7. The supporting calculations. NtTE4 tNaluoEt 8.A copy of the signed and notarized operation and maintenance(O&M)agreement fkivnl t p. 9.A copy of the deed restrictions(if required). Mvti fJ/4 10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information �D 1 C "tNETt�dF 1 otiIGUJ .Pgzt,tt-t--rtg4 t C E IV °N.. 1 APR 2 5 2013 Form SW401-Wet Detention Basin-Rev.9-4/18/12 Part Ill.Required Items Checklist,Page 1 of 1 BY: . _ Permit No. JL�61.0/.30%/2--- (to be provided by DWQ) AVAOl* ATF977 NCDENR - - -o STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out,printed and submitted. The Required Items Checklist(Part 111)must be printed,filled out and submitted along with all of the required information. it PPLUECTIFORIMICIIII Project name HAWKESWATER AT THE RIVER Contact person MATTHEW HALEY,PE Phone number 910-383-1044 Date 4/24/2013 Drainage area number #9:PHASE 3 POND 6 I.team Site Characteristics Drainage area 406,415 ft2 % CArrwS 1AVIcr VAL).* S Impervious area,post-development 124,146 ft2 ikler` 1 i, COX geibriVir, %impervious 30.55 Design rainfall depth 1.0 in -rive r �ou'yk.,_ ftuA>SRNC,A Storage Volume: Non-SA Waters Minimum volume required 11,143 ft3 Volume provided 22.698 ft3K,volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5"runoff volume ft3 Pre-development 1-yr,24-hr runoff Post-development 1-yr,24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required? N (Y or N) 1-yr,24-hr rainfall depth In Rational C,pre-development (unitiess) Rational C,post-development (unitless) Rainfall intensity:1-yr,24-hr storm in/hr Pre-development 1-yr,24-hr peak flow ft3/sec Post-development 1-yr,24-hr peak flow ft3/sec Pre/Post 1-yr,24-hr peak flow control ft3/sec Elevations Temporary pool elevation 7.00 fins! Permanent pool elevation 6.00 fmsl SHWT elevation(approx.at the perm.pool elevation) *fmsl Top of 10ft vegetated shelf elevation 6.00 fmsl Bottom of 10ft vegetated shelf elevation 5.00 fins! Sediment cleanout,top elevation(bottom of pond) 2.25 fmsl Sediment cleanout,bottom elevation 1.00 fmsl Sediment storage provided 1.25 ft Is there additional volume stored above the state-required temp.pool? Y (Y or N) Elevation of the top of the additional volume 7.0 fmsl OK CEIVET) APR 2 5 2013 Fonn SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I.&II.Design Summary,Page 1 of 2 BY: Permit No. (to be provided by DWQ) seraturaisanag Surface Areas Area,temporary pool *ft Area REQUIRED,permanent pool 9,185 ft2 SA/DA ratio 2.26(unitess) Area PROVIDED,permanent pool,A,,,,,,„,001 10,116 ft2 OK Area,bottom of 10ft vegetated shelf,Abm*he f ft2 Area,sediment deanout,top elevation(bottom of pond),Aytpo,d ft2 Volumes Volume,temporary pool 22,698 ft3 OK Volume,permanent pool,Vi,,,,, 26,742 ft3 Volume,forebay(sum of forebays if more than one forebay) 5,891 ft3 Forebay%of permanent pool volume 22.0%% Insufficient forebay volume. t1TEP SAIDA Table Data Design TSS removal 90% Coastal SA/DA Table Used? Y (Y or N) Mountain/Piedmont SA/DA Table Used? N (Y or N) SA/DA ratio 2.26(unifless) Average depth(used in SA/DA table): Calculation option 1 used?(See Figure 10-2b) * (Y or N) Volume,permanent pool,VP„„_,,,,, 26,742 ft3 Area provided,permanent pool,AP,„, , 10,116 ft2 Average depth calculated ft Need 3 ft min. Average depth used in SAIDA,da„(Round to nearest 0.5ft) ft Calculation option 2 used?(See Figure 10-2b) * (Y or N) Area provided,permanent pool,A,,,,,, 10,116 ft2 Area,bottom of 10ft vegetated shelf,Ahd t„r ft2 Area,sediment cleanout,top elevation(bottom of pond),AbaLpo„d * ft2 "Depth"(distance b/w bottom of 10ft shelf and top of sediment) 2.75 ft Average depth calculated ft Average depth used in SA/DA,da (Round to down to nearest 0.5ft) ft Drawdown Calculations Drawdown through orifice? Y (Y or N) Diameter of orifice(if circular) 1.50 in Area of orifice(if-non-circular) in2 Coefficient of discharge(Co) 0.60(unifless) Driving head(Ho) 0.47 ft Drawdown through weir? N (Y or N) Weir type (unifless) Coefficient of discharge(C,„) (unitess) Length of weir(L) ft Driving head(H) ft Pre-development 1-yr,24-hr peak flow ff3/sec Post-development 1-yr,24-hr peak flow ft3/sec Storage volume discharge rate(through discharge orifice or weir) 0.04 ft3/sec Storage volume discharge rate greater than pre-dev.1yr24hr. Storage volume drawdown time 3.18 days OK,draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10:1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio >3 :1 OK Length to width ratio >1.5 :1 OK Trash rack for overflow&orifice? Y (Y or N) OK Freeboard provided ft Vegetated filter provided? N (Y or N) OK Recorded drainage easement provided? Y (Y or N) OK Capures all runoff at ultimate build-out? Y (Y or N) OK Drain mechanism for maintenance or emergencies is: PORTABLE PUMP � 77 Form SW41.11-Wet Detention Basin Rev.9 4/18/12 APB 2 5 2013 Parts I.&II.Design Summary,Page 2 of 2 Permit No. (to be provided by DWQ) PkA 3 —Ea*t *(o Please indicate the page or plan sheet numbers where the supporting documentation can be found. An incomplete submittal package will result in a request for additional information. This will delay final review and approval of the project. Initial in the space provided to indicate the following design requirements have been met. if the applicant has designated an agent,the agent may initial below. It a requirement has not been met,attach justification. Page/Plan Initials Sheet No. N k S63—t 1. Plans(1"-50'or larger)of the entire site showing: SLS-•-- -Design at ultimate build-out, St—N-5 -Off-site drainage(if applicable), -Delineated drainage basins(include Rational C coefficient per basin), -Basin dimensions, -Pretreatment system, -High flow bypass system, -Maintenance access, -Proposed drainage easement and public right of way(ROW), -Overflow device,and -Boundaries of drainage easement. fr 1 A P-s 2. Partial plan(1"=30'or larger)and details for the wet detention basin showing: -Outlet structure with trash rack or similar, -Maintenance access, -Permanent pool dimensions, -I-orebay and main pond with hardened emergency spillway, -Basin cross-section, -Vegetation specification for planting shelf,and -Filter strip. (tA V tF-3 3. Section view of the wet detention basin(1" 20'or larger)showing: -Side slopes,3:1 or lower, -Pretreatment and treatment areas,and -Inlet and outlet structures. NKr{ N IA 4. If the basin is used for sediment and erosion control during construction,clean out of the basin is specified on the plans prior to use as a wet detention basin. t tA- c# .c 5 5. A table of elevations,areas,incremental volumes&accumulated volumes for overall pond and for forebay, to verify volume provided. M'f1k 0\ 6. A construction sequence that shows how the wet detention basin will be protected from sediment until the entire drainage area is stabilized. MVrk t!'[e-we€ 7. The supporting calculations. Mill tPC.LU e 8. A copy of the signed and notarized operation and maintenance(O&M)agreement. M V l ikiuDetj 9. A copy of the deed restrictions(if required). Nl'CI-1r 1414 10. A soils report that is based upon an actual field investigation,soil borings,and infiltration tests. County soil maps are not an acceptable source of soils information. mart" kot 1, OcT -rt-le-tluG•ciF) c tatrs+tt_PetzlattllIS6r 4 0 APR252013 Form SW401-Wet Detention Basin-Rev.9-4i18112 Part III.Required Items Checklist,Page 1 of 1 CAPE FEAR ENGINEERING April 25, 2013 Janet Russell NCDENR — DWQ Wilmington Regional Office RE: Express Stormwater Submittal for Hawkeswater at the River (previously permitted as SW8 060354) Dear Janet, Cape Fear Engineering (CFE) is submitting for an Express Stormwater Permit for the Hawkeswater at the River subdivision. This project was originally permitted as SW8 060354 with Riverside Land Holding II, LLC as the permit holder. The p : '..': ._ since been acquired by DR Horton, Inc. Because DR Horton has been unable to get the original permit holder to transfer the stormwater permit, they would like to submit for a new stormwater permit to supersede the existing permit. This strategy has been discussed with and recommended by Georgette Scott. With the exception of the ownership change, this submittal does not intend to make any modifications to the previously permitted design. New applications, supplements, and O&M agreements have been provided. Deed Restrictions and Protective Covenants were previously recorded for the Hawkeswater subdivision. A copy of the recorded document has been provided. Since there are no changes to the previously approved subdivision plan and BMPs, copies of the originally approved plans and calculations have been provided. I trust that this information is sufficient to issue the subject stormwater permit; however, please let me know if you have any questions or need any additional information. Sincerely, tit Matthew Haley,A Cc: CFE File 410-01 "36" flECEVEj' . APR 2 5 2013 BY: 151 Poole Rood, Suite 100 • Belville, NC 28451 • TEL: (910)383-1044 • FAX (910)383-1045 www.capefearengineering.com f�;`.2) 4 For DENR Use ONLY v Reviewer: '' North Carolina Department of Environment and Submit: /4 -Z• �� � Natural Resources ,y Z® NCDENR Request for Express Permit Review Tim Confirm: FILL-1N all the information below and CHECK the Permit(s)you are requesting for express review. Call and Email the completed form to the Permit Coordinator along with a completed DETAILED narrative,site plan(PDF file)and vicinity map(same items expected in the application package of the project location.Please include this form in the application package. • Asheville Region Alison Davidson 828-296-4698;alison.davidsonftcdenr.gov P Related Permits of Requeue st • Fayetteville or Raleigh Region-David Lee 919-791-4203;david.lee(dUicdenrgov • Mooresville&Winston Salem Region-Patrick Grogan 704-235-2107 or patrick.grogan(ancdenr.gov SW • Washington Region-Lyn Hardison 252-948-3842 or lvn.hardisontncdenr.gov SW— • Wilmington Region-Janet Russell 910-796-7302 or ianet.russelKdncdenr.gov SW SW • Wilmington Region-Cameron Weaver 910-796-7303 or cameron.weavertaZncdenr.gov SW NOTE:Project application received after 12 noon will be stamped in the following work day. Project Name:HAWKESWATER AT THE RIVER County:BRUNSWICK IA Applicant: BRAD BRUNDAGE Company: DR HORTON,INC ( `� Address:4073 BELLE TERRE BLVD City:MYRTLE BEACH,State:SC Zip:29579-_ Phone:843-646-2305,Fax: _ , Email:BCBRUNDAGERDRHORTON.COM Physical Location:APPROX 1.5 MILES SOUTH ON NC-133 FROM INTERSECTION WITH US-17 Project Drains into BRUNSWICK RIVER waters—Water classification SC 18-77(please visit here to look up stream classification) Project Located in CAPE FEAR River Basin. Is project draining to class ORW waters?N,within'/mile and draining to class SA waters N or within 1 mile and draining to class HQW waters?N Engineer/Consultant:MATTHEW HALEY Company:CAPE FEAR ENGINEERING,INC ')E C EWE E ; Address:151 POOLE ROAD SUITE 100 City: BELVILLE,State:NC Zip:28451-_ Phone:910-383-1044,Fax:910-383-1045,Email:MATT.HALEY@CAPEFEARENGINEERING.COM 11 APR 2 2 2013 SECTION ONE: REQUESTING A SCOPING MEETING ONLY ❑Scoping Meeting ONLY ❑DWQ, ❑DCM, 0 DLR, 0 OTHER: BY: SECTION TWO: CHECK ONLY THE PROGRAM(S)YOU ARE REQUESTING FOR EXPRESS PERMITTING ❑401 Unit ❑Stream Origin Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑ Intermittent/Perennial Determination:_#of stream calls—Please attach TOPO map marking the areas in questions ❑401 Water Quality Certification 0 Isolated Wetland( linear ft or acres) 0 Riparian Buffer Authorization ❑Minor Variance ❑Major General Variance NI State Stormwater ❑General ❑SFR, ❑SFR<1 ac. ❑Bkhd&Bt Rmp, ❑Clear&Grub, 0 Utility ❑Other ❑Low Density ❑Low Density-Curb&Gutter _#Curb Outlet Swales ❑Off-site[SW (Provide permit#)] ®High Density-Detention Pond 10#Treatment Systems ❑High Density-Infiltration _#Treatment Systems El High Density-Bio-Retention _#Treatment Systems 0 High Density—SW Wetlands _#Treatment Systems 0 High Density-Other _#Treatment Systems /❑MOD:D Major❑Minor❑ Plan Revision❑Redev.Exclusion SW (Provide permit#) ❑Coastal Management ❑Excavation&Fill ❑Bridges&Culverts 0 Structures Information ❑Upland Development ❑Marina Development ❑ Urban Waterfront ❑Land Quality ❑Erosion and Sedimentation Control Plan with_acres to be disturbed.(CK# (for DENR use)) SECTION THREE—PLEASE CHECK ALL THAT IS APPLICABLE TO YOUR PROJECT(for both scoping and express meeting request) Wetlands on Site❑Yes 0 No Buffer Impacts:❑No❑YES: _acre(s) Wetlands Delineation has been completed:❑Yes❑No Isolated wetland on Property❑Yes 0 No US ACOE Approval of Delineation completed: ❑Yes❑No 404 Application in Process w/US ACOE: ❑Yes ❑ No Permit Received from US ACOE❑Yes 0 No For DENR use only Fee Split for multiple permits: (Check# i Total Fee Amount$ SUBMITTAL DATES Fee SUBMITTAL DATES Fee CAMA $ Variance(❑Maj;❑Min) $ SW(❑HD,❑LD,❑Gen) $ 401: $ I LQS I $ Stream Deter,_ rt i E 2_I 000 fl APR 2 5 2013 NCDENR EXPRESS June 2011 RV. 1 !� 1 E P 3 m W g LN . f'N r 01 , .„, ill i g 1 I^ WI. <= lir — , . i I 1 (0414 kliill -1— 4 11 gs w v I i n1 r i A = n J r u ` • L(� i�®-*Jlr ���� 3J�1lp'•d�1� C°�.�6I�/O �' ;�0,/ � . k __k-®!® ''r"s y,4f4_:Vt,r4.4'1 v`- ,u i ot,,.:,4.,rA_"..ww- '-®,"-fi,./,/-,', ' 4n�� O ``l `�• .ry '✓O 41-""P-. > ' Y • 1'p i. 8 r gel, /". - (I O ,S Vt .:',,,,,1irt.h.,,,.,:tp,-,1...,:11.;.: , ''. .+ 1y1 q ,•; 4 �pQ �p �vygiy y�9��� © s/ �Jll�!` O p O 4 i 5,1 ;�;. :� ;;�,;1 r + y l m C�^,w;.1. 4�lr1 A , 43/ <s Ilj�� c"1 1!j O v," .1'h f:ttt 1• a—".1 -_ \ "'AN,9n++' ,1`-(l , p. _ _•.cw.. .A pq � ' ry 1 1 1 1 Y`.51 � ‘ � - J� ,1 1'11 � - S°1 Ai'' 4� � l �:, IYi \ �.0 4l'4 1,..;' ,.,•,;, r:l, S.,.. .�v J I f 333�` ll {/' ift, �-4s 11 s 1 1•1 Ih;la 1 I b - }!(0 1i11;. rr' / S',/4, / I�( .. 0,l .71',.l'lt.� 1. -2 ! 5 v -pts i',1 C p, a,,. i=/r \/A y_f - 4Ytiafe41:1,nI:ILI:1 � '-'�- ��it r r 1, t _,. 19 ' L y l r,',ICh ` ?-'- f ., /r { 4 1 ,,1 7 9 r q --� 7 ,, r u 0 1 l - �`��,I�.Y� 1 l / 1':-Ii 1:1 r 1rt .g ��l. _ �1 ! • rh/rf 7 S41iyt 'r 1 M�' �1 ��� O �� I I .�; II �� Px'i 17' , 1 .6 ;'At :hLsf f i 1.1 1 Is+� �y„�d:,)0 1'ay 1 fil,Otr I-1 `C,' •I r 4 \-;,I 'I"IrI i ® s��*; _ � � � ti ca /�y,: -r1i 1 YL� ,j"�I 1 �® `t! Rs t *..,e,.,5v stwIti.....,;.:15: ,vi .�� .vim , C 7-ii 1 . 3Illl ' M_ � , Vl 'nelliki4 44—' , - --1'., - ' '-' ' C 4 ' ‘ - 11, ,.."- -''.,_ `, 1 ' . 1,' ' .- ,,,,;,. Ifc ; ii .1 ..,, 11 \-1 . „---') -I' ', ' , •ram\ ? _ I ... 1. 1 I _ I y' prS9 I ,. la ( S!+PPPP - -1 I u I. ✓_ 7 N 11 ' 1 1 t` t 1\, of i .'li 1 - " 11C) 1 - 1 11 I.- +, LL 11I 1 l. � I n. r(���:!:1;1.1;I:h 11; :1 y1 ,'l aIIaierimil -- T -- , pJ f,l 11 r Ify1S,,1j1 rJ 1J..I h=,,;1.11he— 0 �4-� �_11 I • I 1 'I ,i 1, lir;;r. 1 ' 1 rY1;41: ® 0 Q �q�.p..-� _� k: : lr'• ,,,�;�11;rlil:'1� r� (I r r; 11ib,� 1 O p/1'1 11; I l � r;1'11 ;��i;�; r l rI � OO .�4..b 1 1 1;1 1 r r ,�1 r r,,)1 l;, _� .1, a -��. f_ 1,1;1.r:1;1:�{ , , ii ,., 111 f 1 f i y� Vtn l `I'' .,.,�,;,,,;r l J" 'r l l l 1'r tIV h e IIII . .. 4:,, 1. Ir.itiii;;il, i,i yr 4.Jt',;1 , . r 'VSi ` %� I I 1 1: , ti �hr l '•1' ■ .,1 '4(r 1' 1 hhl•1,.,1:I:1: 1.1.1,1:4..h1,1 ja , ±O,/'. ��\ , �11 _ 4 1� ( ',i:lh,l .r r:1;1r ,yl',;,;1:1;1;1;1,1,IV� 'fin*+�e ` gy-i2 y 'S. \ 1R:I,;•4,'•h,r'i;i..1:,....'.,N;r;.i.:10.1Fi O LLL!.g),;1 P ,- , a) ®>' -E: 1 't'� N...,4:ril.h'1;r.1••, 1:I:..t1.,,,,, ; ,.l:r 1 ' 4., 1;1 iii'1 h� \ 1�1 4 !t 1�'� �. b i ^{';;.aa l:,r ••t:1r:1�/7I:?,' �.�f1:1;1}Z;',.. N ® I1r*.e'libV.,1s...)„ 'I1l f 6 ri'�+.1 '!�?: +; • :.f1 Bpi • II I I,l:l;li l: ry;.l':1;1:'.1;1:1;';1; .,•1 r;1;' \• '7 1.,� I� 0 I I4r 1.h h b•4e,1,•1:1:1:';1:1;1:1i ,;,.,.,; ' © lJ � ® 1131:1:1;1,1 .,h:1:1:1:1:1;': ,y'. " a ( � A 1, ' n' i© ' _ •I I 1;':1':1:1:1' •1;1:.l; ,i ,, 1;r:';1` ;1;1;1;1;1;':1;1. ,i kl {;1;ht:l7yJ 1 \ ';. _ '' 1 1� r,l; 'lr I.h1'I,ish''Fr,,i;1;1.1'bl•1',,'r,.ila:l:ln O ,;,;,• .4, :I-sr\S "V.\ S' ! c - \ ® ® r , l 1', nr;;1,1 ' 1:1;1:1 ;;i 1:1: ® ;1f1: _ ®1. r3 "i��- _ ,:.- S �` >, r�1,' 1:r;1:1;1. &—® S ® _ a'k�, l arm,\ '+ ♦` ® p` Ii .`� 4;'I,,,! r,l,l,l,l:;"•,,.:r,,�;l,, „,i. 6 1';i, p + ��� ` , .,�, 1 o ,t,_,,l//. © 1 ® i 1,'; iIY1;1�1'1'1.1'1'r'• i,K�,l:h41;'NI;. * •®,C111:;;'" 9 alli , j Vil. .(r i V .} " , .,. ; , ;,'+ ,,'o.,..1,•b.:... ':1: Y:1;1:1 , © ® Sw:1;1';li;lnl'1' L�x,,tc / 8 I �tla.l ,' ' P1 r r ' 111'': �la ;,r,1:1;Y:r:r:lil:l:1;1 �3 ‘\-'w A. r ,Sd + � OOIa h1;1 „I1,11 1t`I 1 1•I ® ''' `` 1.•'': ;{11:1;111.1; 4,- C3 • E Pi 1 f/ ;,�,lh, .h!.1;;hlrr yr® ® V5 i:::;,:1 ;1:1.1 '1 i�r ' s e� E.:1;::1:,:':IS,:::li:;;::::46. ' rs /® ® 5 ,•;t;r;l,,,,,,,,,1,li' 0 )• ..,:.1 Q, b •/' ® /� '- I1 Y 1'1.1:(I r.l "�" r I ' r \ �, \�,/ , ✓ `Ii,;l �, ))) ' )141.r:•::: �'14tr1+9 :�•!�, Q J/ O1< i Y ® / ; r-1 �® , 1 1 1 1+ � r i9 � w �' © .f 1 tt��,-f �j ../ ` • !. i, ,e "CI: ....::,:-.':,® e ® "°, 0 ® ®__,.- ,-1-04.14 -, -,.... -„,, .,.._1.. __„,.., ____ ,.. 7 „ _.ter— er 1 i 1 ,'�.-" 1 1`11• erraxerm Ie-•3we3lvISrnw-'..w mreuro.ra-:. Russell, Janet From: Matt Haley[matt.haley@capefearengineering.com] Sent: Monday,April 22, 2013 2:25 PM To: Russell, Janet Cc: Perry Davis; Maria Jones Suoject: Express Request-Hawkeswater at the River Attachments: 2008-09-08 Overall Hawkeswater.pdf; EXPRESS REQUEST FORM.doc Janet, I would like to request an Express Stormwater submittal meeting for"Hawkeswater at the River". I have attached the Express Request form and an overall site plan. Please accept the following in lieu of a formal written narrative. This project was originally permitted as SW8 060354 with Riverside Land Holding II, LLC as the permit holder.The project has since been acquired by DR Horton, Inc. Because DR Horton has been unable to get the original permit holder to transfer the stormwater permit,they would like to submit for a new stormwater permit to supersede the existing permit.This strategy has been discussed with and recommended by Georgette Scott. With the exception of the ownership change,this submittal does not intend to make any modifications to the previously permitted design. New applications,supplements,O&M agreements,and deed restrictions will be provided.Since there are no changes to the previously approved subdivision plan and BMPs,the intent is to provide copies of the originally approved plans and calculations. Please let me know if you have any questions or need any additional information. Thanks, Matthew T. Haley - PE, LEED Green Associate CAPE FEAR ENGINEERING matt.haley@capefearenoineering.com C: 910.338.8602 0: 910.383.1044 ext. 136 F: 910.383.1045 i CAPE FEAR ENGINEERING 151 Pooh Rd.,Suitiiir 100;B.Mk,NC,28451 TEL(910)383-1044;FAX (910)383-1045 'Nwvicapefearlinginsaing.co" Transmittal To: j NCDENR - DWQ Date: April 25, 2013 Wilmington Regional Office File: 410-01 "36" Subject: Hawkeswater at the River Express Stormwater Submittal Attn: Janet Russell ❑As Requested ❑ For Your Files ❑ For Distribution ® For your Review/Action/Approval ❑ Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description 1 Original $2,000 Express Fee 1 Original Cover Letter 2 Original& Stormwater Permit Application Copy 1 Original Pond Supplements and Checklists 1 Original Pond O&M Agreements 1 Copy Secretary of State Info for DR Horton, Inc. 1 Copy Document giving signature authority to Brad Brundage 1 Copy Property Deed 1 Copy Previously Recorded Deed Restrictions 1 Copy Previously Permitted Pond Calculations 2 Copy Previously Permitted Stormwater Plans REMARKS Please find the enclosed documents related to stormwater permitting for the above referenced project. Please let me know if you have any questions or require any additional information. Thanks. CC: Cape Fear Engineering, Inc. File 410-01 "36" flE IVE Signed: Matthew a ey, P . 11 AF R 2 5 2013 Received By: BY: Date: P:141 0141 0-011Admintstormwater12013 Ownership Change to DR Horton12013-04-25 Trans NCDENR.doc CAPE FEAR ENGINEERING 151 Poole Rd.,Side 100;&Ass,NC,28451 TEL(910)383.1044;FAX(910)383.1045 invw.cap"fearengineering.com Transmittal To: j NCDENR - DWQ Date: April 25, 2013 Wilmington Regional Office File: 410-01 "36" Subject Hawkeswater at the River Express Stormwater Submittal Attn: Janet Russell El As Requested ❑ For Your Files El For Distribution ® For your Review/Action/Approval El Sent via Mail ❑ Sent via Courier Quantity Drawing No. Description r Original $2,000 Express Fee4( 1 Original Cover Letter P 3°di2 Original & Stomiwater Permit Application ' ��i1fit r) tl' Copy 1 Original Pond Supplements and Checklists oY , i Original Pond O&M Agreements )) 1 Copy Secretary of State Info for DR Horton, Inc. 1 Copy Document giving signature authority to Brad Brundage 1 Copy Property Deed 1 Copy Previously Recorded Deed Restrictions 1 Copy Previously Permitted Pond Calculations 2 Copy Previously Permitted Stormwater Plans REMARKS Please find the enclosed documents related to stormwater permitting for the above referenced project Please let me know if you have any questions or require any additional information. Thanks. ECESVF CC: Cape Fear Engineering, Inc. File 410-01 "36" s. APR 2 5 2 3 ' / Signed: .. . Matthew a ey, P . BY: Received By: Date: PM104410-011Adminlstormwater12013 Ownership Change to DR Horton12013-04-25 Trans NCDENR.doc aya, E-Filed Annual Report r 'i `1:'' BUSINESS CORPORATION4988929 It �, 5 ANNUAL REPORT Do not data enter manually. NAME OF BUSINESS CORPORATION: D.R.Horton,Inc. FISCAL YEAR ENDING: 9/30/2012 STATE OF INCORPORATION: DE SECRETARY OF STATE CORPORATE ID NUMBER: 0296009 NATURE OF BUSINESS: HOMEBUILDING/CONSTRUCTION REGISTERED AGENT: CT Corporation System REGISTERED OFFICE MAILING ADDRESS: 150 Fayetteville St.,Box 1011 Raleigh,NC 27601 REGISTERED OFFICE STREET ADDRESS: 150 Fayetteville St.,Box 1011 Raleigh,NC 27601 Wake County PRINCIPAL OFFICE TELEPHONE NUMBER: (817)390-8200 PRINCIPAL OFFICE MAILING ADDRESS: 301 Commerce Street,Suite 500 Fort Worth, TX 76102 PRINCIPAL OFFICE STREET ADDRESS: 301 Commerce Street,Suite 500 Fort Worth, TX 76102 PRINCIPAL OFFICERS: Name:Donald R.Horton Name:Donald J. Tomnitz Name:Bill W. Wheat Title:Chairman Of The Board Title:President Title: Vice President Address: Address: Address: 301 Commerce Street 301 Commerce Street 301 Commerce Street Suite 500 Suite 500 Suite 500 Fort Worth, TX 76102 Fort Worth, TX 76102 Fort Worth, TX 76102 Name:Stacey H Dwyer Name:Thomas B.Montano Title:Treasurer Title: Vice President Address: Address: 301 Commerce Street 301 Commerce Street Suite 500 Suite 500 Fort Worth, TX 76102 Fort Worth, TX 76102 CERTIFICATION OF ANNUAL REPORT MUST BE COMPLETED BY ALL BUSINESS CORPORATIONS Thomas B.Montano 1/2/2013 FORM MUST BE SIGNED 1lY AN OFFICER OF THE CORPORATION DATE Thomas B.Montano Vice President TYPE OR PRINT NAME TYPE OR PRINT TITLE ANNUAL REPORT FEE:E-Paid MAIL TO: Secretary of State•Corporations Division•Post Office Box 29525•Raleigh,NC 27626-0525 r py; APR 2 5 2013 } Y�y{ BY: CERTIFICATE OF OFFICER The undersigned hereby certifies as follows: 1. He is a duly elected,qualified and acting Assistant Secretary of D.R.Horton,Inc.,a Delaware corporation (the "Company), is familiar with the facts herein certified and is duly authorized to certify the same. 2. The following is a true,correct and complete copy of resolutions related to the subject matter as adopted by the Consent of Executive Committee of the Board of Directors of the Company dated April 11,2011 (the"Resolutions"). The Resolutions have not been amended,rescinded or modified and remain in full force and effect as of the date hereof. Election of Assistant Vice President and Assistant Division President RESOLVED,that Bradford C. Brundage is hereby elected to the office of Assistant Vice President of the Company (the "Assistant Vice President") in the Company's Coastal Carolina Division(the"Division"),to serve until the next annual meeting of the directors of the Company and until his successor is duly elected and qualified or until his earlier death,resignation or removal. RESOLVED FURT RE R, that the Assistant Vice President is hereby authorized and empowered,in the Myrtle Beach and Wilmington area(the"Area") and in the name and on behalf of(A)the Company,(B)any partnership of which the Company is a general partner, manager or agent, and (C) any limited liability company of which the Company is a member,manager or agent (collectively the "Entities"),(i)subject to written approval by any one of the following officers of the Company: (a) Chairman of the Board, (b) President, (c) Senior Executive Vice President,(d)Executive Vice President or(e)the Region President of the Division (the"Approving Officers"),to execute and deliver contracts,agreements and other documents and instruments (other than promissory notes) for the purchase of real property, and any improvements or appurtenances constructed thereon or affixed thereto, or any interest therein, including without limitation any right-of-way, easement,leasehold or other tangible or intangible property,right or interest,and any personal property relating or incident thereto,(ii)subject to written approval by any one of the Approving Officers,to execute and deliver contracts,agreements,deeds, conveyances or other obligations of the Entities, closing statements and other documents and instruments for the sale of improved or unimproved real property,or any interest or right therein,owned,leased or otherwise controlled by the Entities and (iii) to execute and deliver model home leases and such other agreements, instruments or documents as the Approving Officers shall direct. RESOLVED FURTHER, that in connection with the management of the. Entities'business,the Assistant Vice President is hereby authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver (i) I , APR 2 5 2013 BY: contracts, agreements and other documents and instruments for the subdivision, development and/or improvement of real property, (ii)home sales contracts, sales person employment agreements and siknihir ur equivalent agreements,documents or instruments and (iii) personal property leases for, among other things, office equipment and construction trailers. RESOLVED FURTHER, that in connection with the management of the Entities'business in the Area,the Assistant Vice President shall be authorized and empowered, in the name and on behalf of the Entities in the Area, to execute and deliver any and all documents and instruments necessary to sell and convey title to single-family homes. RESOLVED FURTHER, that effective April 11, 2011, Bradford C. Brundage is hereby removed from the office of Vice President of the Company and Division President of the Company's Charlotte Division. RESOLVED FURTHER,that effective as of the date hereof,the authority hereby granted to the Assistant Vice President supersedes authority previously granted by Written Consent of Executive Committee of the Board of Directors to the Assistant Vice President. IN WITNESS WHEREOF,the undersigned has set his hand on the 121h day of April,2011. n'4444.4- /L tAa- Thomas B.Montano Assistant Secretary tai I EWAi l iMin\DH1h11 Aprl 2-COAS12.wpd 2 , ,. ... • . I> --..n. Ill bp r . ,,,, s & Inlll�l� a'-�-'®aadP +�N'r.'1 of [ y. NC snt.r of Dnada papa 1 er d Brenda M. omens Register of Deeds This certifies that there are nolt-e9-2N12.13:4B:41.NC Brunswick County, NC delinquent ad NC REVENUE STAMP: $21209.00 (023221) vabrem loxes,Mee,eeeeee.aente at ogler fens elfin the Baunewick Count lhx f I Weida is charged with°°Ile ':Q;r;" a i'„ -I_-01.1n p) Eft T5 as notated by the Brunswick O, r g( i r��21a.o c._ Rev i J _t2 fat TiG Assessor's Office. This is not a ...... 0, J rr Ck 4__.c.4113jel$cash$ that the parcel number Malebee the.7:4 ' CUICU Cacti.d Finance descciptiun. � ,9 / ' oleo:ermN err i;bo:uudu�tscandfoo "f X* Car �r of original •i Dote o tkaimard=dare ands vetted Wergild Tax Col./ Spam '+actsreant tnato:m et ho temodteederurtphd. NORTH C INA SPECIAL W DEED Excise Tax:$11,200.00 -g'( , - I�el Identifier No. �� r�y the_day of ,20 Mail/Box to:Grantee This instrument was prepared by:M.Jay DeVaaey Brief description for the Index:l tykes ter THIS DEED rude this 11 day of Nove 012,by and b v(R1 rl GRANTOR U,\� GRANTEE First Troy SPE,LLC lei-k" gi , 1 '. t,. Inc.,a Delaware corporation 341 N.Main Street ` -;;;: 1.o Pads Blvd.,Suite 200 Troy,NC 27371 Mount Pleasant,SC 29464 1 rider ut appropriate block for each Grantor nentee: name,mailing address,and,if appropriate,character of entity,e.g. corporation or partnership. orli,' � � The designation Grantor and Grantee as used herein ;I r]terra,successors,and assigns,and shall include singular,plural,masculine,feminine or neuter tr1 t, p asermorma WlTNESSETH,that the Granto,fora valuable toleration.•��,�' `+, receipt ofwhichisherebyaclmowledged,has and by these presents does ~' g�4 bargain,sell and conveyulrto the Grantce in fees(r".(. all that certain lot orparcel of land situated in the City of ,Town Creek Township,Bnmswick County,North Carolina and more particularly described as follows: See attached Exhibit A incorporated herd,by reference. Il 1,_�1 The property hereinabove deserted was acquired by G..i �' in Book 3146.Pace 832.Book 3190.Page 82, Book 3214.Page 1151.Book 3270.Pages 92011 p+ 9 All or a portion of the property herein:unveye[~f includes ,the pnmary residence of a Grantor. A map showing the above described property is recorded in Plat Book M4,pages 75. TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all erivilegeea and appurtenances thereto belonging to the Grantee in , fee simple. NC Br Awodation Form No.6 43 I1112010 14inad by Ayeemcel with the NC Bar Asswdarfoa I, n--;_lt) FETBr • flECESVE '41 . : .� APR ,. .. . .4.igglitio ••.. .„. 12 Ai ,L 44k JtJiUJL !i!L. page 7 eP 6 OF f,raikyt L . And the Grantor covenants with the Grantee,that Grantor has done nothing to I .- such title as Grantor received,and Grantor will warrant and defend the title against the lawful claims of all persons claiming by.under or through Granor,other than the following exceptions: Easements,restrictions and rights of of record,govmurmental regulations,and ad valorem taxes forthe cement year. .1N WITNESS WHEREOF,the Grantor has duly the��g 1 nd year first above written. First Tam SPE.LLC 'trNe+ Qf L:eLJ fSEAL1 e Name By: MEAD Print/Type Name hle:Jemry IClnlaw.Senior Vice ident Print/Type Name: State of 1JOrth l,W it) WI- of P . m/ 1, No P'u+tic of the Co CI ��f lir"I'a: t/asd State aforesaid,certify that ■v penamsllyappearedbefonsi asthisdayand ackaow miofthe purponlefitheNtirmapressed.Witness my hand andNotttialstamp Vt 2012. • ' ,- ' ='ILl 13 C u i.r. - 41 oary's Printed or Typal Name • .Ytr y. -Count tyof qr, 1 . •Notary Public of the ? Srateaforeseid,certify that Jerry Kitlaw persa _ ma this day and eclmomvl sec President of E1nt T,oy San r T C a North Carolina limited liability company,and that 'vet and enultemarraligudi entity,he signed the foregoing inslnsment in its name on its behalf as its act and deed, my or seal,this day of November,2012. My Commission Expires: Notary Public (Affix Seal) Notary's Printed or Typed Name State of -Coon ' gy of I,the undersigned Notary Public of the Co City of..1 / I[i.1.L andStateaforesaid,certifythat Witness my hand and Notarial stamp or seal,t l l� 4 1aeavrs.w rvsa ,2012. My Cammliesion Expires: Notary Public (Affix Seal) Notary's Printed or Typed Name , ce 17 , gFg©_6w - ReiNtilpftrz r fa NC Bar Arrocimim Palm No.6 01/1.0010 s Primed by Ag „I with S c NC BarAn+aielian g fr riPQt01:1666536.1 / IcePezzlz ,ri;rib I.?-r'-''. E ; : ,. APR 2 5 2V3 ; .. 4/1 BY: �]bjji!W!r LLW 6 N1: !S 1'' I Tract 1(Lahti,3146832): Being all of Lot 169,Phase IA,Hawkeswater at theRiver Subdivision,as shown on map of same recorded in Map Book 48 at Pages 27-30 of the Brunswick County Regil to which is A fora more detailed description. Tract 2(Sexton/Mitcham.3190(82): �2�7��{ Being all of Lot 153,Phase IA,HawkewwateiI'L iihe Riv��l-1 •. ,,�;: shown on map of same recorded in Map Book 48, Fors 27-30 and Book 2870,Page 1381 of the Brunswick County'4 "T';',reference to which is made for a Citte detailed description. Tract 3(Ra kovichlOerard.3214/1151): Being all of Lot 143,Phase 1A,Hawkes River Subdivision,eAgir map of same recorded in Map Book 48 et Pages 27-30 of the Brunswick County Registry, /ne to for a more detailed description. i Tract 4(Hawkesv�er I,3270/9301: ii 111 lJ j 0 I geongorea a 4.4c r Ge Being all of that land shown as Phase 1A,and being 37.27 acres. .7.-1less,on"Map for Hawkswater"by Cape Pear Engineering,Inc.,bearing Project Number 410-01 and dated September 13,2006,said property also being'Mown on a'Boundary Survey and Phase Map fon Hawkeswater at the River"recorded Book44,Pages 74 and 75 of the BmnswickCounty Register of Deeds; SAVE AND EXCEPT the following lots or :Lots 4,5,7,16,17,1 1 21,22,66,125,126,136,139,140,143,144, 146,147,149,153,154,156,159,162,168 and River Subdivision,as shown on a map of ' sense recorded in Map Book 48 at Pagees 27-(r330r_ of Deeds. . dife Tract 5('Hawkeswater IL 3270/9351: VI Being all of that land known as Phase 2 and being 17.70 acres,more or less,on"Map for Hawkswater"by Cape Fear Engineering,Inc.,bearing Project Number 410-0I and dated September 13,2006;said property also being shown on a"Boundary Survey and Phase Map for.Hawkeswater at the River-recorded in Book 44,Pages 74and 75 of the Brunswick County Register of Deeds. • Tract 6(Hawkeawatet III,327019391: � (��x Being all of that land shown as Phase 3 acres,sineostatt,on"Map for Hawkswater"by Cape Fear Engineering,Inc.,bearing Project Number4 and 06;said property also being shownona"Boundary Survey and Phase Map for:Hawkeswatcr at the River"recorded inBorikWagea74 and 75of the Brunswick County Register of Deeds; SAVE AND EXCEPT the following lots or parcels: Lots 147,149,151,155,156,157 and 159,The Village at13awkeswater,Phase 3-A,Section 1,as shown on the platreco ded in Map Book 56,Page 36 in the Brunswick gib of Deeds. ItiiD Tract 7(Riverside 327019261: `� [ '�` 'J f /u� Being all of that land shown as Phase 1B, b .84 acres; and Phase 3B,being 20.04 acres,more or less,on "Map for Hawkswater"by Cape Fear Engineering,Inc.,hearing Prof ber 410-01,and dated September 13,2006;said property also being shown on a'Boundary Survey and Phase Map for:Hawkeswater at the Rivet'recorded in Book 44,Pages 74 and 75 of the Bmnswick County Register of Deeds. NC Bar Association Soon No.601115010 Printed by Amount with the NC nor Association .p;r4j1 S�P f a NPt3B017666536.1 nn �� n IUra ,�jL l� v worm " [l�irk 0-) `r o Fir Jill,I�a Rig Tract S(Riverside IL 3270P920):• RAM the Pawl NI tea m deseeibed la deed book 123 page 97,Records of Bntoawi&Cas y,Nasth.t orelin,asslWing more parthelarb,dyad so ro ono lWmthe,: r. Nohow comma t`'1F` "� • •sad point bah'the 4rll it L i; pion G both in p n Swords of • a.,v - loaded el hove a N.C.[arid sooldiests N�172,467 r• '; x F ,•+ (N.AD.1903): Proceed theses with Ihsssslmprgrt ofway Of NC 133(60 4 Pilo ri{hl of way)$17 54.31 E s Mimes of327.111.*spoil on odd dolt ofway.tfeam with the sasdtem lies of the stl,rondd Mel wet N$3.37r04 E a thinnest • 510 R.toaPout waiteahlaenraliesaarkofTroddcBlvis,them43 aelf s 1 . ' �see Amami N11d32A61.with mid • -tY .00li 0Hf • Ibenea IW o ;_,A ` •`'.. lsraoa Grimmr tospaha. themeN .2933Wa •, , : "{'r Yasp in;them S4i-26- 41 W a m of 41.92R,1s op* shoos.$24.3- W a d s:moa of 36.11*. to s point, thence N 3114444 W a Jimmie of 30.251.ta'poi*theme N 10- 42.60 E s distmaa ef79.l IL to a point.&wee N 34,32.0011 a diatoms of 4434R.tra FAA theme NW-31-343a diatom 0.10.601.to sloth;dame 3 6241-31 E s • • ; of 27.6311.to apdst,theses N -5649 E a disc roe of 31.9111.is a point, • - 11-17-36 W e• 1 ,: to appal,themeeN49-31�WsL•r :''. . rt� •• —317-33.15Wa dilutor 0f36.121 m s• ' • •!'e1 W a thwenosof20$311.1e a Pow shinerM - �� 1 i 91 *moo N62.7.19E 1 .%., dbpsssa.ofl.0�l.to 0 point,*sloeS65.07.03 Wsdhdooea $spasN33-SI-02 W s diameter11i.221.to spoilt*theses N49411-13 W a-0stsme sf21.02Lto a Oat. thanes N 92,26d3 W a diltfitbe ef45.JOI.is s poim,tkioos S 77-04.07 W a doom of4S341.to apdst.dtimei N 16.53.3411 a thrones of 51.931.to pivuw bD*di lip wWM meek theme Meths odd Nib wsler ark with the noniron Ins ofthe ';.,. Powell tree S 1S of49R660.to Wspskaafbta , stss �� - � • maasvalrt~! ' 1 w • 1 • / ;and shown ss Tmet•C"on �r;l•t�11 _ •doted Sspts�7 x" • "'" • npeowkd nibe .PA • O °of shaltegiimMD**ofeno eiekComtyin � 1 :" 31.toy Sa td414 toe 30 A in width sulky pssssaaatt0aatdd is deed book 113 pip 1003. MI bceoogi and disten.em we tads to NZ.Grid WAD.1913. iy S- [L NC Bar Associadon Form No.6a1„,20,0 Printed by Apemen(with the NC Ear Association �� O)Crz'?�� � ' NrtB01:1656636.1 • n � • r�r,?��j� l_ I BUJ lJ `' o -gPf ;l'' Ill111011.11la : ' V% 1i"'°1 '- Oaeds pegs 6 of 5 . EXHIBIT B Parcel Numbers 048CE072 I ' . 048CE067 9 I 048CE00102 048CE056 .,-'i ►• .,. 7;�5: • ,/i:,� 048CE00104 umo 048CE046 ri r M, .r" r,S• 048CE00105 048CE001• ` U 048CE00106 048CE002 048 048CE00107 048CE003 048CE074 048CE00108 048CE006 048CE075 048CE000109 048CE008 048CE076 048CE00110 048CE009 048CE077 048CE00111 048CE010 048C' �� 038NB023 048CE011 r�JI 'l j, d 038NB024 048CE012 l J U (--f1j�r 080 UMPFECIAL 038KA00106 i 048CE013 I, : .., i r. ' 048CE014 048CE082 048CE015 048CE083 048CE023 048CE084 048CE024 048CE085 048CE025 048CE086 rr° 048CE027 ,].Lr 048CE030 „ n 048CE03I U g ISICIAMMIL . 048CE032 03 048CE033 038NB002 048CE034 038NB003 048CE035 038NB005 • 048CE036 038NB007 • 048CE037 038NB0 l`' / 048CE038 • . :1' :� � 048CE040 [1�]I :011 wax 048CE041 0 • 1-:+ >,Gi y 048CE044 038NB017 048CE045 038NB018 048CE048 038NB019 048CE051 038NB020 048CE053 % 038NB021 048CE054 03 p 048CE055 �rM ' 048CE058 Lr�U u 048CE060 038 048CE061 038KA00105 048CE063 048CA02001 048CE064 048CE00I 048CE066 048CE00101 �G 1C R1 Lw�� �� � 1 1 uI ftestezczkia Al7 1-1AWKESWATER ii-iERiVfrR STORMWATER PLANS Brunswick County, North Carolina GENERAL CONSTRUCTION NOTES: 1)THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATON OF ALL EXISTNG UTUTES PWOR TO CONSTRUCTION. -NI /� qt TABLE OF CONTENTS SDMABBREVIA H STORM DRAIN DNS _--'LE _._._e , ��h-` _,�__OLD MILL ROAD za___=_� y /� , R`� a '�I �_'� — �! /�\ SW-1 SHEET NOES-STORMWATER MANAGEMENT PLAN OVERALL PHASES 1-3 DI DROP INLET �-\ Y ''•.� el" j/ /\°\74111f SW-2 POND DRAINAGE AREA'S CI CURB INLET ,S j �`'s Cr@Lok "' i // SW-3 STORMWATER MANAGEMENT PLAN PHASE 1A&1B SW-4 SIORMWATER MANAGEMENT PLAN PHASE 2 IE INVERT ELEVATION Sturgeon _ t ���-� /'� y,�' It SW-5 SR7RNWA1ER MANAGEMENT PLAN PHASE 3A h 33 RIM RIM ELEVATION OF STRUCTURE '�1` ; w S�� ``� C eek — r -:`` P-1 PHASE I S ORMWATER PONDS 1-3&POND DETAILS h 5. f t P-2 PHASE 3 STORMWATER PONDS 1-3 N POND DETAILS LF UNEAR FEET Ch//ye0 I .I DIP DUCTILE IRON PIPE eitar; II 'I P-3 PHASE 3 STORMWATQi PONDS 4-7&POND DETAILS �, L\,'1 - ,[ " , D-1 STORAIWATER MANAGEMENT DETAILS SHEET PVC POLYVINYL CHLORIDE Z. T i� L7/ �~- ---�'I ri WILMINGTON ELEV./EL. ELEVATION `LANVALE i N,.> .,''''',/ -'� -- RAIL--,,',. e GV GATE VALVE OADS ROAD -%,� �� MIN. MINIMUM \} ter -,'\ �I i iS. I ,- A\ CP�\ TYP. TYPICAL 11 i / 7- V,_ . w HP HIGH POINT l ^ j� `' LP LOW POINT A\\." i' F. \ CONC. CONCRETE 1y l �`� S I T E ' � \ 1 i' / / ` RCP REINFORCED CONCRETE PIPE .Si '� // \` CAN CMP CORRUGATED METAL PIPE 73 ,; ,n/ ` dCkeys J 1.1=INN r0 113M TEMPORARY BENCH MARK ,\S 1-- , C eK 'i vt STA. STATION iv \�;��. . �� 9/.4a ME BOA BLOW OFF ASSEMBLY �(RAy�` � LOCATION MAP W NIP NEW IRON PIPE n�P NOT TO SCALE USED.B�aroB HDPE HIGH DENSITY POLYETHYLENE V IMH INTERFERENCE MANHOLE \ -���� �\��� GAPE FEAR FINAL Deem i n n v i Inc. NOT cOrremucTtoH� jL I I I/1 G G! 11 I g, `r-CR AGENCY FEVEW ONLr� 151 Poole Road,Suite 100 1 Belville,NC 28451 g TEL (910)383-1044 '4`'"' - FAX (910)383-1045 A 1, § www.capefearengineering.com c BY: .. . _ .i..,_.,...,_-_)...__., • '1 1 ,•/ , i i 1,- : ------r_.7-=-=7-: •`- :-.,--,:,r-7-:--:•=----------------":-__ ___;_-:- -- , . • , .-._ - • . , , 8 . 4-...7„ -.-- -,-.: --- -,,--:_--...7.----- :.:--:-7:-.7- ---.--•-:-'7""`-=-----.-.0-:-::- - . i - '' 1416.- -.. ea I r.-7-.--.,-.::-.7.-_ . . _,...3.,.. •• ,, ... 1 , e , /e ,-----?-„?.--,-,_-7-::::.,---- -i-,- :: ::---,--=-:::-,:?-:,? -. .7'.-g-- -::.,:::=.-..--,-=,-r-:,-,,-;,-.;.,-,:---=---;,• ;:--i-.F,-.:•-:6-' f/ , ',',-- •• - •0 i -7-7_--"•-•:-7.:r="_.:7-r.--r_'-r---7'::::"-----'-:-.:-.‘-----'::2;r:tr:7.:'---;-",:-.; :ii„,,:--.r.r.:•-7--,.-_-.--.,;:7:r7.:--, :r."-3,- i I i , _.;-_,-6-;"- 099 v •sp -_ . i..':'.,-, ,. • 7-1,-/-7-; 0- 0 ." ,- .":::. -' „AL-NR,a,,`',,---,'-''',•.,w-L.- 1,2.„,- - .-..,_, .„„ „„„.... : ... 8 - ' . ir---:,'-'7:::--;.,--:-;:ii.:.'-=-:.- :.:-.:-.:-:-•;-::::i.-77--7-:;:•- --;: -:..if:';--7-:.--7.---;- --.-Z-:i•r--7.:.-,r-:::- , ': _., -,.,••,•!•••-•'''''''..'''.....r .-----1-..'"- SITE-- 'y - --.: _;,.. i_.:-7 ,-,,-..:.. „ - ::_. :r..:-.;'::-•;:--,± 7:,rr:,-,-,,_•-_.Fii.,-..7.:-.,:tr,- - 11 2,, 1," „! .2-.111:11..--1=%Pi- •-2--;'-', 7:A, j _t,-; 'e 0 --e ,... ..tgy, _ '111 ..._...,,,,,,,,,,,t 111311 .,. '•-,- ,,...,- -:-::- _ :7.7.-,,,, , - --,, -- -.- kk , :s .';',,-:::,-,7..:-, :.,. w_, ..r.7,1,,,,7,. -'''' '%AI 1110,',;,:',.. ., 7 -- Ns.,- :- :7. -.: ....:::- .:- R7T-7-'7'. 1 , ; . i'- -...:tiptiik:„.1'.:' ..,4:':1_,, \,,, „t:.'''' ,,,, .:7:7 ril-:'4Ft- ):: :6, 9 - ',1'111 ,7,:„,: ( ....:-.3:1:7---1,7;-::::_ )_-,.. _ ,,.,, s .- -.:"7:.i•:,; r..7.,7- . .. :;..;-'.:..::...,r.:. --.3-..7,.,:-.,:::z;:;:',7_..7..;.:•;;; ;;:.. \\7„:72'......_-_, ,...,8' . --._:-.,.:-.ii.,,.,-...,_-,-----.;--.:-..,--,,i,.-..,..:-.,...-.-,-,_,,f,,-----4.....-;_-_:,__,..r..-..,-_,-:- 4 --, : ..--4' k__n„,.„,......, ie.„....„ -......,t1., - -.i7trir--.r"..— .------'-•-47/-- 1110",, ' -- - ‘,---'"•"-- ' a --..,../.i:..i. ,_-,-=-:".:- -i-i-,. .i'.,..-...=_-:--.:-.,-,,,-,:-::7_,•:-i::,,,-_--:-.;, -7,- -.:-,,,: _-,_.,. ,,,,,,%, ....,.. .-t:-:‘,..;27,r,-..,; -, / 0 , \ ' ‘ '--:----j:%:::-.:--;•-•:" " - ' 7 -:;?g,_ ii! b\N'. -4 • .\--; :' 1\ *I a .-.717' - -i),,,,,. •-•-s , cj• „,ill e . : _ ,r, \(........:.•;''.•, I V"' 4: :\ @ \ '\ ® '.k 7':1::: •:.. ..:.:i.::,:..:..: Z:'''.•'?.?":7:i.:.'.:Z:•14::::i .: 74'..:C i.:•::;,7. .- 41 :.:Id ® • . __. 1,1 i.........„,;a*!------- I k 8-‘-':;"-- (--)(;),Alp ..-7.:.:?•;:::::•:,..... .,:,,Z7.,,,,-..:•.....;....; ii: 1117riNGTa''' Jii -- -1,...0;r---- --'...,",1„.„0-4,OF ,,:&e:,,-- k•-,v'' 4 .....,.1,0" , „ _ PHASE LINE 131 I I C.) (:-..:-.i....N ..--- ° ' '-' - r,-57-.77"--•''.:' -.5:▪-: ,r).."' i t:...,7_:,,',_ \' 0 ,-- 7%- -i---::;;':-:.--77'7" --' , 5 VC"- „ ' ...----:. '''',..;:-.",y '• 54, ,,,,,, ,... 4 A ,Is*:Zs kt-0‘s. .•L'.7.`,7-",--- 1 ---.•74.':,"' ILCV l'r".- _, - I ' .• 47-:---1- .. ... -.C-«-i-:- - . sty ,..--- i . a ', . _,..-,..--::-.-:-::, .._ a_ ,-- - roc... . .. , „ , , _ ® .- 1_ a6.7_, ,....51 . , , .,, e--...'tti 47'..': s'".---"e'-'2 -..- 4St.-- t.: -.."-.. - e, ._ 11,iti - al \ y ,, ,Ciit _. 000 0.-••••_....... ... • 8 C) , . _ t 1,?3, , 0 1 i;:z:':'-:•-rr:.::;". 8 -.-• ® =:'-';' `.'' - ‘ -'i. -',,,-- 't ' --'8 —- -•-"•-•*-- - !,"1' - r, 8 '-=-:/....i.r...r.. ..:;,-__. @ - , ':': —i' 4:- 11,-"‘\ill'AL",\\:1111,::: ','::f:41%::::::, i ---C17 -: --atl r 8 - ''".. •''i--1,,,,,. '",' ka, --"'" lip!' / _1 ', (-D 8 , s ';:;:--:-.1-:r.--...-7.:1..-,,;;:-..:`..\_. _„_® '.---"---------._ ____ _-•stu ''',7---17- ---;-------:-' '- Fit,te. FUTLIRE DEVELOPMENT • "liCt W )162'.i::.;77=-.--.': .•;: -' '' 0., , .- 4,,,D.. ',4 , _ • -_-----,---, 2 ...- ., , • .----- - .-- - -----,-,- -_-.-- -......---f-:-..„),„-.--7-:?' - 0 . NOIR&; . e . 8 ., . :...-.....-.„- -.,_...,,-".r...7--:"....-.'•--.::.... ,.. ,••-..-.,•''• -.4'.. P.' 54*'' 411/.; .; 11',.1:.'1;_,.;-::r:21`, :' :ft i -= -!-: z . phase , , . . ,-.:-. . ?,i, .;-_ 4-.,2_1;;....-,:-.,,,,,,, --I.i., 8 , , , \ 8 NI---.-.:- ---...7,..7 , 0 .,. • , , - Al - _ , -4---43. -,-,/ -',,,r,i a .0 ,_ LALL R 07 RUNNS,BE OPTED TO DIE .,, -_-____i,„4 s!.. , ,i 8 ,.. .,:-T,r,..r.,:.•,-7"..40 -. :-. ,-,.. -- ,. o _ _ ,_ , V ® • r -,- s : e, •.. - 0,- 1....e.,---,,r -*''' ---- - )t G i .' I. / ' \ : •' -- - - ______,________ _:-_-.-,_ •.-, et ,.••::!......,.- -,1-:--;--:::_:...,,_6., , • a -' ,. _4- , ., . — e A '" ' '- iii 8 . /A14141:' ::-.,-:.., s-' - ..i- IQ 8,,,i. - ',- - - -- . 'AI ,- _' ......;•-..;x.".„.7.,-,? ,'• -., .," 'I'--- --4.,_ (7,, • a , ,,, ' . _-, ‘• — , , , 6.. ._-,,,,,,,,„,5',,,,,,,Th ...6 7-, ' -,-• ,_--,:.0 ,--- , - ''''''.;-' :-. '--_:-..:- , - - 1 . ' . -.--:-'---\10,kii<•1-',: ',\-: , 16.--70.,1000.0,:. ,•.„ _.... ;0:;,:„, - ,-., , . 9_ - : i Ni\', 7'„,,,„:.,"',',.,..,s..., . W , --- ..;. t. ).,-,..)Oe-,,,C, , -.1r / ! .., _ 1 -.-. . „ ''i- __,___ _----1--'' .-.''----..':F. =s-":--:!..'.;'1::::.:,-t,..,1'"'''''-:.;:',. r.„--2:',\14flt...:1•5:;;:;1V-7-_:"'"-":7-r...:.j.,--;_:.17.7..?4..%:::_.7... -,,'c). itil''.11%''.•_.4)--5,:ie`444i,0.1.".;-'47-7.... ,.., .,--,.• ..-52.. 1 \ •- : I ,,_, \. A,5. 5,,.•,, \‘‘... ,;,,..., ... -,,‘. ,c5 1,,,,, :,...._-.:A. , , i 1 ‘17.711,71,. __. ---='--- ,,...,,-. :::;,?'",---,..... ": '. 1,41i\ev , 5 , '\7'; s,'',_, ,,,,,,,_ :„..........,---...- 0"7.7. ''..1.--\,0,..) i g,,..,..._. _.: ,:;-4•solv ., C.: j/ ..,:iz2s., `,\;_„__':;,,,_..,. l\t..,,,,'7•..i_-i, 3:,t,-VN,ic,\\,‘*- ..7,,,c,,,o_'...,:,..;:_-., '-::::4;:;:.:..,,, \ ,:„.,..13.,,i'. ,..s.,:-.,:k\s• ss, -1 ‘' 0\ " ,555,-,,:.5.75.1-,,ljr."• s55 -5...AT; ' st: ' 'c -...,-.5 . .., :'' - i ,s • '.45A ;5F--. /_ e ..... .,-,,,.. . ._-- .,...,.-, , --- MAL DES0.4 - " I, 1,....„ , ---.., r (g.: N 0 1 0 01 ,•- ---,- : ‘vi ; N) .,..0.:70,,,:.,,,,,-;"- .-' ....1),,,,...,---„- _;-..,--:-: , ..--------= ,, \ NOT FOR CONSTRUC11ON 1 - ---- - )e) z, ---, 1,-=, , -- - ‘‘,0 ., : ' i ,,.- %, tc, .- - • -- ., •• -..• -. -.- ' tv, -, 4 ;,', ,-- --,..- (-.) i/ 1 , , —.... ' ..'s---1 / ;' i-v.' - -, -`,--"tv• .•-•-,--i ,_--:••:_:-....,:‘,- - -:"----r.-:-• : • ,.,, ''',. - \ • Kg AGENCY FEVEW ONLY ;Ala. --; ,' I r ' r". /\ ', •''1. ' '.. "A - -- \'4i --‘71;--7-[_-- f' 1- ; ,--i.,,,---,,-2;,_,--,..-; - ..-:-. .--.------- ---- _,-.----- - , - _ ___ .„.....-,.. .- •„,,,,z., ,....„ .,. 71- -_.:-.,..-, ,., ' . :-..{1-: .-__-:).-)-,--.1,----a-- .,-:-, -s:„....-,-..,_:_:,,41 ,%-cp. „;. _:-___,,....:__ ,.....,„..r:;•; . _, , , , i •. . A. -,\•t'... ..:: 1,-, ..7:7 :-, ''''g --' 7 , , ., ....'• -....ft.‘ ---1,-'-•_ •.,,. ..*--_,.„,"•,-,0„,,,-_..io., -,-,--,•,,,t. _ ,,,,,_-, , , 10 -e e ',P -9- r---4/ _ IL___- ____ _---------------- '..----"---',„--t,r-_,-,;'-', :7:- ..2 ',..1' -'7--------, - --f-,..7-4, NI,:::,.:0',..., ,_.„..,-g...,1 : _,.. ,- . / ,, 1 '. ' - 14..4' -:--:::- .;.;.7----- , C, 1 •:. t C REMSED PONDS FOR GRAVE STE ULT SAAR e REM=POND V KR NCDENR 3":07 ..-.._, i ;.:.. ' - .7';-0 , •5 -.(3 ,, A ISSUED FOR REGULATORY READY i2/22/0. res - -..I.k'oa,.C... .r;(ei' e o -I/. I ,... .. _ -.--_--- '., '77--- -,7''-- '."s.5 lk,-,:.-; :•.-.-,. .... ,,,, I ;,..'1,2$1.1! i %, t t 1 t t 7 DESCRPDON REY BY DATE ....,\.„ •-,._..C1 '.',%.,...krk4c.- - 1 1 , ‘ RENSICRE i _=:.''7 '*.: - . • ' •• ,,,k:-'7411Afq,:7---..'''-Al".........---r- I' , 1 V...' ,' -: 'A 4 , ,- : iro---"-- ---' ' - 7 ' `.• .'.w- , r - -' '; ' I, '';: ': ', ' 0 ' '''''''' i 'e .8 : • , ,,-, - / _\ 4 :. . 111'--,-, , ,,'--•_'' a,','--°-%-`-'' .,/' \ 4:' :, ''.€ : ' I' ' • . _ , . .- . ,, , ,,...r.,....;-:.,/i ' -' • , .._.,-7--7---;I 1 ' 1 I a - 14:' :. - r f--0 . ,,,,,-,4. - ,... .- a ,-• ::----..--„ ,r.r.:( I: --A,\. :''..Y.'-'.1.. 1::...-‘71;0- 4....''..'''' ''.C; C)'' '..-;. @ e 4 ;.:,-,..„., ii 1 _ .__ '•-- ' . ..,r- -: :'-':017,.1.`/Zri: :'2' , ......;,,,, ' '• '1.!,•,<`,,,' 43 '.... s..-. S _5 ' 11' ji --- g'441i!'i ' , r. ( oi ,-;'4' .., i .. . _, .1...-.1.,„ _ ,_.. .. =•r'1=1.. rw. "11 1 1 --- , - e '-\•$. firxt `, -' - ® ,;,. =• i , -- ' --(.--.--. ij -I, I i , i-4-y" 0 ..) o - . .. _ ,__ , _.,..„ ,.. ,,,,,,_,--_,1„.4-..„ --7.,,,:„...1 4-.„•... .,-::,1 osr--. . V _,__ ' BBER,ROAD__ -,_ .,_____ -;,-•=--- __.,-,-....41. ........„,..T, ..... ......... i *-0. I 1 i 1 1 Illik .-,..:;....--....72.4,.. SW—3' ' `--- '-- -':.--;---- ':'-..-----:-:-------- ______ ----._ ---4-----.------=-:._::.---.--- ,...mmmm - ----- - -- --:. -.2----.f., - - " !'-'' -- --- ---:.-:t ---`)1 --- ,,(,-.;,--- .- N2 : :‘i •):--:,---s,'.,`::'':Z-:---, • -- `,. .......,.......... , ,.._,......., ,..,.,...„..„, ,/.........,,,, .,- , __ A 5 I , , / ,,, / ..:1 (0,1194.; •sumo, I mow .._,,, )22 zee zoos i ' "-1 i '0 = / ' .; • 'g. 0 11r2a, TIO SOO 1 nal-Ivo'Fr Nona .....••••-7'\ . ' '.*" / 9- , ,•• , • HAWKESWATER 1 .w,.......4eADISA VW"ti V 4..I.L.4'• AT THE RIVER , / , '--1 -- ,. - / .. STORMWATER MANAGEMENT PLN4 OVERALL PHASES 1.3 ii ''-' '''''" 11/4 ' \ S W— 5 ,. %,.:' ., • -,.. ., .BY--------------- ,( 410-03A1 SW FW-1 ) : : .., iiitiaiti. "- ' '-1 i / ,.._ j, i , i ,--,_ . .... , / . , . i . 1 , ';'43/•:- - 1-7::.:7=-:----=-----;--7,...,,-.: ---7.--------m------i-rie--------7:_-;.,,---,--- ,,,.-.--/ _, „ - ,... ',,, .,•-• ,:-:-:-..r.-----.:.::-::----_,:-.-----,-- -:.-.7.-.----.:--:.-....-7,-------,-;,---------,:--r-z,_2.---7-g,--zz-_ -.z.,7..-, - , ,,, ,..:/, , ,-,,.:-,...,-,:-..-.---,-,,,-,,.7.,:..----.:-.:.,-,.7....-_-..---:,..--,.:--.------:-..7.;-,•:,.:7,-..---,_:,.-,-:.-, ,,_ , ,- . • ,. -,,, , , -REP- •s•7'..."17.:777\ ,^ . '77- I •'._,_sp...A...-•:.•.:-Z,A 4,i aii. CC A5', - 's--; _ -., .,.. _ \,_' 2-41: .-,, ::..,.iy. ,-,-,,,,:i.,-..:-_,_—,--„,_._,....-_,.._.-_-_--.:.:_:..",::-.7,;.'.;,:..r:•::.7,-.-.''. -.,,,;..:...2-..7.„.7,.-.--.-,;..;-.-:.•7 1 - 1 tr,--2_`----7:*,--,•:.7.-'---:il..',Z -, ‘ ''1., .:.7'.';'• v,T'.. — '..-- ''''.:--r' 1: 7 '':- , aft- s-- - ----- ----'-•:--:•-7.---- :.-7.;•-...-,..-.--..--.:.:--r...r--T-72:-...-r:::.-7:----7,' , i 1 . ,. , SITE '"-e ' t- .ri..,01,—, ,".,\ • --.."1-'"`",--;-"‘ ,-;- ""--.M:t-r."' ' '",%• kg„,,,,,r,....„6._ -----___ ,,ivrAi---0,0„ ier,/,-.,-_:,-,,i_,-.,,,-, ?_.7.-:,-::-_,_,,,,,;:-.,,,zr..7-:-,-,:'_-7.- ----2---:--;-=---,z--:'`-"."2::-.:-: .;-•'---'•--7.- -.:.s_-::::C:1`:-'7....- '/' 1 . •,' '.%, ) ,- ' 12:, ..- --1 ----,.---- -,.....,. ...=dr.. ...2.:.-.T• •? -.124,4...v.- -A__ As I A 404-1,1//'//''t' ' 0.,:-.Z.-•;"--J- 7:--::::'.:7,:.":•.--.;- -4-i?:7A.:.:1.--.::.:-.;';;;;-/-r.:"-:--.:-.;- ‘1':;„:•..r.7A.-Y-::--:-..7-;..7,-. .:,'•.::-.: li . r k , :' '.- -.1A-...-----..;_-: .' , - "k:' s. ...... ,:•-•.' '"?'••77-a 1/1§ 7.-_-7.-;:-.'-',.=-,-----*1/4.4..--7--‘3,..p--;-- w-51-rA .t- 17 ' , .---7-.r' A' ) 2 ',.7‘117,/.• ,,,..,/,'",...-1,-; 7LZ:7:?,7:7:-.F-7-.1"..,:-:..; --:?::',7)7•:"•:`-7 --7:.'i.,:l.-7-. "• -4:-:.;:;.:.-r-:.•:--.:--;':7:".1:.,:',7-:"•;:: -::441 ‘-' .' ••• - .-'''' .^-7----- -7.. .kilit--'11•06'.'"'. ' ' VICINITY MAP 1 rtra/;''--.7'.."k'''.iN., //,/4%'7---.7...:A.';" --;;'.2::::::..::.::::: :::::"2:::--„ :-_,7_:.?-4-=_:▪??,i,:_-?-!".; ;--_:',F".-,-::-.t:-.::;:::.:-.:-:'"-Z7,77. ; .. , . ...-.„.,„!_-, ' • •.."'"- 7- _,%\., ,ce- - 774.1 - -.:`,' ,.,.L .. .•womenn..; + -..,r, _.jo,, ,--, ,.., -— _-_, . .._,,,,_. 11011011.1.1E I 14.( )4,\N'fZ ''' ;' - ' .;.;''.;..Z;,7,,:.r.'.....:..... :.:7,:::-72r.:.- .7;.77,7,7,:::'. •::::',.:.-r-'' '''-:7:i.7,-r / ' ' , .,"'.," -• '4/,:.:':".....,:9-1 -'-i-,„;;:::' 7:S7% ' AP., .' `-..•.,,;", .'" ,...-,,..--,,,,,,r*"io./4."1- ...`',,,.;::,,,"</•;:" al' .., Ill.; -- --'52, -1 Wiir -' ','/.V.../.:,6);11017t7'.-i--:::?: 7..,7-r- :::-::::::::.;.;"--r----:-:-.;,-;:"Z...r;-:;;•-_:-..:37-i-i_:-.;).--.-_-,.:-:-:::-...:-.:-; • . . -, - ,,---"T"14::-J.7-14... --z--9,- . '....A.t ",.11,7g----:::-:•;;!'..k.1.:.' .7:-..-----/,' S.' , ;- ---,0,'"';',". . 7- . _, 'IN -/.72- ,-,,,,/7"0:t„t.,-.:-_--.-,-;.:::'.7,,;,:" ..- -,7"::::.=----7;.:::>;:z.i;;;:i..:: ::---..i-..:7-,":-=:.-:7_:z'--:'::---r----;::,--.'r-:- ' - ' '--- ' ' ‘,‘--7:"..'* --•r-7i,--J r"<----: - G--;---.--':''''T` -=-- -4- av, -----ist--11, -Illy — i ,,S,-- n• ' ) \is\ 0 ,;$---:-:-.7..:-.."--_:-.:::--7:.:::=.-7-:"--:":"-:__-:..7--7_-7-77--_,:•.-7,;:.;5-'".:-.;...7:-'7,-,7 "--;•:.::-..r.r.. i. / 10 4, - . >4, z. .44,--..:-_,- .7...-...r..-...-.:-..::.:-..r.7.:7.-.--7:-;::::.:7 r7e------7:-..--..:-.-''e'...7.------.:--;-•"•7.7 .-".. - -- ' '1'-', frfr---;11., '_\_-en.--7,.......,..,.--':'''''-‘,-*.:_,./•- ,.....4-_____,,..,,...-- '4\5\r,-,,.61.7%.---.,:_FTL:V.,:,:01...,,z6c-,7"......2„..,7.,- 1,1“:47,-TiTt.,,,1:.......L.miri.s.i _,..,..... ,., ......._, -.__ .*.;4;-. _-1. -- z le e A' ';' --1'OP' le.4.,n- .0(//* ''''-'-',1/f , - --:74.i-r-r-:-: -:--;-•:-.7:::::.--r-:-::-:;--7--;.F`i.r.:.::.-'-i-2;;=:.::;',:!5:-:-:::"-'7-j. --;:;:-1 1•..7 ,) X . •' -, ---'s.- )f'.'-‘,.... ...- ,:..S.`: ,\, : ..v,i,"--'4'4 NI A r.-: .- ' -_-•/ 7:',), , ,iie.'d Ati4fl . ' ' ,..:, ' „k'-:',0 ;\ ---=:?::_f=7 :::::::-.;:.?:::-.7.-i_7:_:- ::::..--;-.r:i.::;---;.::: :::. ;.:-;;.-ii:':;;--7.--;- :4-;--7•:-.?::-.5*-;-::: ,,,i'l 1 . 1% ,A i'D '',..'-;.--_,:r' . f,-,g;S .....-At‘ .„..-:-... J‘. 11:""•,...1‘,::‘'::Z.,.,‘...,...‘1‘‘,‘.........,...':".,...::„.X..''''..1‘,\..\\ 0.. .‘:‘..1 1 1 ,k,''',.\''''N 4,1,,‘_14.r,''.J....t.,:'1".1.'...,,,It,i"..,-(r",,---.411 .,,`,i..`.--,,,,,..7.-&-.1. ,,,r--"'"" ,:, ' ,..,, 0",.<- --, 7-1' r—Alleff ---4 0,,,,:*,,-N, - ,.,.---,--.::,:-7-i:: :-.. -.:-.:-.:-.:-i., .-7-. -_,▪-_:-..:-_,-..,:::-2:::-.:--.-..,-,_-:-.:-.i,-..i.,:-..,."..ri,r.,-.,- 7,11 ..-"-=- ,.....---:‘,:: \., •-. ,:.-, -.•,-,,ii.li......,1.k.. • , ,-,,,, A. . z-, A ,-.1.7?1,-sot:N,--;-- . - --- ,A,, k..•-41'• 0 0,, - •'' .... POND DRAINAGE AREAS ".'--'; , ,:'.., .I.•: A'.., ‘Y.•,,•‘,4 4-*s-.q.....t. '',. < — 1 IPLATI.4t,".--/,0+1. ''''.'4<. ''' .;,7*--';'':; -;:-::::-:::::::;::: ::_::-;,-.'-i:=---::;\:f :•:-.;::;:----::1:--•::;-:::::: ::'-;:t.--":?..=:-1/1 . %•.:` ..--.;` 7,L;\,‘;:.3.:,-,: '''.',.:,;%,:-.- :•;„ Z.:: ,:-...*>:.::*-:,)':',1. ..::::., %-- '''2,77-:,,'Ill.,:v.7.wm,-,,_-',-..--_-_-4,;.,- -, -_,,-..,._,I.,i,:,;,.-_— , itia,_:_ -,-„,,,,,t,„ -,. ----- ...„, -,,.-!ffrigie.,-/0:2. ,„,.,,,,,..-04;04, ,,;•;.: -.6.),,,,,,',,,/ ,,,.--,,,_.,..,:,-,-,-,-,- ,-_,..,--:7;,-.:-.:--,-,:e:-.,::stz:::-:,3-_:-..,,„,-,:,-_-7-:.- . e.,,Ar.„...,,::,...,,,......":.,,,,,\ •S,‘..,.).:.:-;..‘2,.•::...s ...:-\',..rik...\;z:Sk,•••.a•.:.4 ._:...•;_:.,V.,...• „,:e,A'\'''tiriiii ‘.1:,C;-_-, -'- - - ''''Ll- --- • -'. ' .117. 01,,':'• ' it-, '.••.1/44".1:.NI 7,"' /Or '\--. -.4-7'..7--..;-.....;:2-.:-..r.,:"---;:'..7..:,-2,-.7-.-.-----_:::-2,,.:-..:-.=.- - IOW,/7-,ef• ' --k. , f c-,N , -,-....‘,.. \\----.:-.:,--,..ii:-.:-.1-,-:::7-,-,-----;—...--.-, -.4, 1 ,_,-,. \,,,s., ,,, ,,,,--. ,,,, ----, ...\ ,.,. -..-s, -, \---- -N. ,, ,.",-, = , ,.• .*`="lf,. it A'' 1----'7" \`2 `"---- ). (3)...,01„- ° irt:11011VI, .:',:-: -- /404 -... ,ge --Nt, ,-1,, ,-4,,i, •--. .,..- --------= '---- '77 s 1/4''..t s '‘* g , , , I ...41. _L. .•,,,;• , -''7".• ...„.W.,„, .. .•; k , •,....,... ,,.....7,, •sz -,:.N ,-...,.. , 4: \ F.,...- .,.. .s. .....;. •.;•,..-, ::. ,.-.,.,.,,.:02-. ,,,s.,, :;., ,.. ... ,:..., s,:,:.-.::: --...\.....:-...''S7-,''t\';,.. --...,..,.., ,y;',. ,..,-;-. v..;...‘ ',..•:,',...,:.1 i 1 •g> , .-...::: k,'S.,.,": -`,./"/..' ...,g--,4.t,,4,-,1.---.0,';',1- -,....:2-^"' _ , ,,,,. .,....,_A., ,,. . , ,_,. ,...,. \\, ,,..,,,a ,, ....--,.,,,,„,..,„\s...,:o ,€)....•\,.; ,,0: Ts. -..,.,„.s,...,,, ,.....:„..-. ,.--.,:•,..:,, ..).z, ,-„..\‘,,•,....s.• ,-:_.,:,..-s-.r, ,:‘-‘11',7,,- ---_-;,-A ',- ..-,,.z.... -- -•„•.‘ •Alirm, ,,t(mtli. ','„,..:.+-',;--4.-_v,,-F.,--,,,7--(- Willii. „,,, ,*„.,7,..i; '''' ,..-.,-X,ti.--"' __11-,•0011,, ,,,.., 0 ,. ..,,,, . ', •, .04,,,t,,,._ ...., ,,.,...;.: ,-. „7-,. .-40,, ,(i,..•-.,--.',-;-\'• -. •_,','--- 4;.1 \,,,,,:,7,,,,•:•_\:: :-_:\'::=•.-ri....---.-•, ....;;;;- .175,:•.-,;.:,--,\s,.:: ,:,:.:.,s.:,-,,.•,\,,,..L.,.,...,,,,,,, s-4,„1:60-- -,„,--s.y-,__, -_,,,zN.:.,-,...zx-, 'N'..„\--z---,:. ;„--, ..,,„,,, \-.:,--_,_ - .$- ,-- - : S-' •;.1,4*,i,'' niii;.,-''':-,-...,!.'....;:40- z'- ' --1..- f.', ofiret0 /-' ",,F4' - ",•" i `c ‘`..':\ ......k-:.,xi.x....<'. \N .'‘ s•' :7.-.V4%_,--*"-'52`"-"^,r,,,trr77,. -:,.\\-.--:‘,. -s ...\ ,:;f-.L.AVkth::*r-F7k- .,,,-- ,, '.:-::- ••x,'s.:-... -C.-, •‘:•-:.• \-.•:,:-.'::, --:,.4:,:..iAt,,Irgitst,-,v:-...C.--._-..1.-,...1frx-iir, .;.: ,,,,:46. -!--!-4,14..r.-- :- 1 allriMiR,\V ..<:, ... 4'5_,4...' ...,..11111i,''.,:.: es.::'.,,..,\:\•:::-.7---47 ---.7=r------w...,•, ,;\ \II .,,.,,„,,, ',.; \ ,.,.,,,'N,:.,,, ,..s.::,\ ....G.::\. \;•,s.,,,.-\;,'.. .\.e.,-, \'..;\.: .:-..,\ ,,-,)::, \:.,.:.\.\:,\s. '-:.‘:';':,v:.,\;:\ '''...;A::., '-'2.111011c,r, .1 Ani,.;,, k--;"'-`,-.7-",7..1..,,. 4: /.1.;,. ,...,,,Ilp -..„.- .•)•../.'.:-.m,•-• ---".....%; "' 40, ___ :,,,,,„„,„ .:.A-') 'fi,:‘,,,:9"' ,'", -'-7A`r.f4,----,'&,..r ',7i,*1.aa...4; \:\.- x,f,i' '';''.:N ,,4,.i.---v',..::',..4N.-: ''' 71,s--,....'we::, ii'4 .3,... ,....v\s, T..;..,'.-...,.:N ,..,...,„\.;!:::,.:'"....,.,', :\\sK,,,, -s-.§.,vs:: ::,-:Az.Ts-., s-,..-.',. -•:::-.,'s,i --' ..,,r,I. --„.,i -=-7.::;,',.-:: AA.- l''"Nele,„!:44, -,,,,t-e; "Y--.:1---f-T' '----s--- 6th-,E74%,"TLETR°?WA?'"''''E ,, II rAti'll*F., Ali>..:,4.;:i./:i.,'i.:- d.-C,' 7,.."‘ :F7fVe0.A.L:i'Vs:,1,ATI7'ii‘,A11:4F:';..: -.:,,:;,'.1--.1.0' s 4.,'-",'-...<:-, l‘Y-'s. '...',',•:,. >';•:.'"-',.......'..,"... ,s'-.';'X''k: \:-. ...' .:,\-:..--;:,'-::.:.':;‘.\":::::.,..1A. .--:.....'":','i;-:.s.':-.A\ii.M144.146,'71--a.r.:::-:-g?"3---=‘-:;"'',-/ .-..: ,,,,,,, -..--„:„.,*.:_, , , _,dr 40v#0;,, /' 7,....*-/ -.7" 9.,",-, '-'1,.:7.4",„0-4*-4 ...;7; -c-"-,:,,.•;`,..-F,,,,t,...Z.i.F".7:1 .e.e.1,,•'-'s `;,,,..1.-)4\ t.),;,‘/ '...:Y.-,..-'„•.s.,'<-,-..2. -,;--:, ‘.....",. •:-'....:\ .':;:,','; ,--'''.- \",';\',::-.-. ',Y.-A \--...:;\ C.:-.s.s..,:•:.Z.,',., ';',..-..; \-,..,,,;...,z;:..„ ,nPs,I.,,'....,,,- -‘,„\•5.x ---77:2-'`.r.- _ -: im.--,......42„ 410, ,::"..,;;;,.`/,,- 1,'""7.;.'r 4'.'!. '-`47'1,-. -• '-'!"',-.1-'-;.'-'-''''':-.,-.1 't:- A.,' ,ei'N.,', ‘,.- •.' ' ,`:\ \••••=:.,.., \ ‘' s. \....S, : ‘• :• •\,N\ `",,' _VS:. `-. .' ';". "-SS\"-:‘::-...',,it"......;,i, 4 -.,464.,,,,,igt..";,:;-;--_-- _ ititTi M!,'::„....:',AZO.-_::siz‘.--------.... ,k:. 1 ,,r ,, . 49*, •.4,,,4 se-0".0- 4,_,.,.„- ,..-,„er...,_...,„4. p,,,,,,.. ,,,,ek,../.. .,,,,-.-: ::,.., •:‘,. ,:,. ..... \..\-:. \.-..... ::‘, ,,,, y..,_ \\.:‘,-„:,,,,_ ,', . -,-:, v---:-\_y..-g_ -- Pegs, \ ,5‘.“:11w,---'7:-...7-,71034,VA CI:t4tErAtli\-V.:1'-4 h.rlk.-: . - -. ___, ,for.400::. ,,„,,/x,.? ., ,..../44:0 ,.- ... ,ot--, ..,;,,-,,t,v-,,„_,.•- ..-_ -,\ .:-_,.„., , y.,„ .:-..,.:-„,,,,.--.-,,, .{.„ •-..,:;....,,,,„*„.,_,....--,- „,,_ -...,,.,: •._.--. -_,:,.--,:„.2.:,,_,__: •-4.. _ .g,kw.,;,..,;.", N'.. -";,..-.."....i..; '''' .1.1 -,,,,..-...-:-..",..-3, ,..-, ....,:g.:i .4,,,,,.._,-_.... --,--r,„:_-: ---174,00 -c-://ci-y•TA.,:,2'...ii.r:,,,_, }-',,,_$-4,1or -_,„,;,- ,7& „„„,%.--2,__- 12._:,-...,,,,,, ,,,,,_,, ,'„,:,-..,,,,-..i.. ,\,,..,..-.::_?:',-ss:,,,,,•::::.:\'.,,,..,::::-. -...‘, i:,;;.,_\..:_-, 24,,_;-.2,,?,.,:-,-ti ---.7.-'_tr-'-'4"--' z'-.7[..1 :',-.•-:•>. -;,., F.,2:;.-*, ;y.,..-.:7:-4 41(01,.\'4,40,11 -- -",/z.1-, -17'.,-.. ...... --:•,-_ \ira9tli 0 , ( . :,•-,,407-,,,,..#vel),4„.. „frite- ..,.,*„,- ,-! fr,..-_.:-.-..--_,;,,„...,„ \\-,... .,4-:\.,,r,,,,:, -,,,, ..,,,„,,\ ...L,,,,_:,4,-:t,,,,_:__,,i,-..-_-_,.„7.:,-.:_,716r,„;.--,__:,. ,..,,,,s,- :.:... ss."-- • ,- -..--...7-7.......• ‘1-1‘,.•-1'k .,:o -7,-,-7:„:„.?..,,‘ .- - -,,, 47, `,:.-, ,.,--,r, 1,.. . .. -;-,.--..--,„ -'A ' -‘,1,1t. fi-co dr - 7 ..,,,,4111„.....-. ,,v,....too ,,Iv......,..i,-,i,so jo, ,.„.....„v\,,,g,„is ..,,,, ..,,i ,,,,.,,,...,_,,,,,,,_,,,,..„_,,,i!,?..7..,..: -,..... :.‘ .. iirl„,,,;;,i,ik,....i.-:...;,:. . , _- -.-4 rit-AA..: ° - -,..Y.A.,,r...",-7....,.A NA.,,,..t.' ,..f;-...-,•--......-.- .: .....,_ 40 f 4 . I .....4.0.4,,,, ...__.:„..,„.4....,:a..,,,, v.„ ..: \srly,.;,„ „..4i17.........v.,..„0..a.7. ,:•40.,,..,,,,:,,,o.:,,,,,,..., s.,... „. „.. 1.,,:l 0404,. • ._.- _ , 1 .,„. ,,...i,__,..- - _ ,-.: ---... ...4:z..:4_... ,4,-z--s-----74-.- • ,x, ,„,,,,vat.--w,=kz,-. ' .....--:A...4'--7,...-.:-• ''.. k..•'"''''..' -`,:..'-47„,,,-..---'1---_-_,TZF:---":.--A _—.--.•'--77-7, --C,-._ -7.:•"•,.',. --;:•• '',F-2:-1 4--:".".74±.7-"7.:1-7- -.: ei:. i-...exv,,,) V i ,,,, -. t.-- -_---_,-t- z-li ...,.:_s.i:.,:s...,: ..1•,1. ,:t .7., 4,,,,,b-.„„ ;-,.: ' ' 9",,OMAN,-- -----lk-„,:`,. co' Eigino, ..,),,t,,,.4.,_„,,-- 00,;•., v.,... ,,,tiy_-,,. -1 , ,„•• #. ,. , ,...___ f,._,.-- ‘,\erti.t4,145-'• ',,I‘ AVAT*,,,,-;4,10,...:-, V"),,,'el.,;L, ACIV- ,.-41.:.'":' • :-.. " - lir#/ to` .,.1..-.--- -='.--.•----..---,:-.z• , '---.'. . .. '1 "riATANW,„ -N,'"( :410.1n100-1--- rs.7 e-p'.: '11,:::`..,;•<'s-: ‘::\47--,.. ,. ''',::::. 7','i-" --7 ' - '' '-'7 ..----;-. \-.-:. -.:4.---, - - "A' - - -' ----'' - - - ' - '-'" • .-'' - . _- „ FFIAL DESIGN ,• ,1fr I.• . : . ,-'''',-----':.. '-'"?:::---.=. -,..-:''. . . 0:',\ ,,- I - . ,. ,. 1' \7.-/":40'L*Cti4-4g,"•./e,/ ''; .0. ' '1' 4___,.44`..-,-.4.-. 1Z-.:7- -.1;,:---7-VE:711:--: „0,..,-," ':',.,:,'". .' I v „ - ,-- , , , . - ,-. --.1:1 ,•cp.04.4.- .,, s. , c",,,;.,,--e,-,.''„,-: -'..:-„,_ - -.1-...:-:- .7----.;--:.--,: .---e-- v--:- -. , : [FceNOTAGENcyFOR CONSTRUCTIONseisv a 4.) .,„410tAk. ,', -..•,,,A. ,,,. - ,, 7 , 41g;1------'-_-::--, A••`-. *: -:'• ":.:: -------,''41.;'!'-._f,'„''' CI ''' I ' ,--.........:;, ,l ...• . •,.,: ,..: . -.V. ...,...--.,,V ,..j....- -,..7.... _ ...r..-..., I %*AA,.i,,1 ,"-, /- .".I., ./#4 ,-,.:*.f.1-7‘.- ',....- '..: 'I--VE 1:714.11:" I' 1 0 \ 4 '• ' ir' /-...\it!, i'.....0...,:: :-.0.-: '---,:-.:---,F.,..;-.--,--.-n,,,,•. %.___,..0 A ', ' • - I , ,'•, Va* 9, , . A i „--# .--,&,..,._-at,:-... "4::„.,d-' -:... .-,".i. .4%. ....-qij-1,...--.-;11 I . X' '' °OA, ,- .;y1:.,0i'„se-,,-‘:.:--,;'?--', --. .-;.--_-,.-1,--._,.-_-_-.-s,,,,..,-'.,•;.„-.-„.---,_:-_4,ht,-:.„.2,__..-,:-.r.,------..7.1 ii , . . • _ - -i ,-••.:,-=---; 1--.-,`• --s , ,‘ , / ,,, corl,e,,,,*,-t-r,ttr res,--_- :-.--_,- •---- -- -.-- •,.,-.--2, -•-:_si .---_,:-7.--trvi i, 1,-,.. \ -2 , IALT ' I 'I",'f, / 1) ,.. ,,-,,,,i,„', 4,...-_;,-,-•--- .,.. ,-,-;...-- -..:.---_--:-.--- _I-_,_,„_..... , ,. -...-„,- --;.;,:,,,t , -- • •,.- • --,---,..-..,'; - ; . ' ., ___.1.Aie . ,s . , _.r.--7:-..:::_--:--,-..:,-,..r:-/--- -c-, - C REVISED PCNOS FOR CRAVE STE 8/8/06 -.7----',1.....;-) \ \•<': . . ' * ._.' ,"*:---,-.4; -...3.-'4=.:'-='.7-'..' -.." ..r'- :N -.'3 '-'--6'i----171 , v.":, - .I _.,,,,--,t"'" to .,..v,;,;,‘• .....? - -:-Z.-7.--,-----7--'.- - ------''':7-'1I , ' : ' . I %•\;,‘..,..:••a: do.:4-:ti„-'-':_-••--:r.ci-_-_,--;:---,::-..-4 4 ;-::: zo., V-,--Af-, .1.' le I .. . ' 1' •-• a 1 9.i.',..,... 1,...:,..--.7.P- -- ..:.;,;•.,--_-'‘......--‘-- ..„..:‘,-...,, i:,... c 4,;' ,.,....,•.:„A . :::‘,e:-... . ---- it -\:, ':.. i. • -, •lig„„g",:::,-.-*':z''.:-..-.- • !--,..i..,::::::::: .,-,.:-_-,-,k...7..,,,...... .i.,...,,:..,..- , i.., x REIv. ..•., 1 1 I t % --)..n',.. ••.;''..... '_I-zz.-.._.- :- p y „.,.. ....: ,......._....._ 0,,., , i,,,, __.-., , , . . , ,,, ,ii",....„ ,„ , .,......,..,....„ ...„ ,,, ...„.... , t AB ISSUEDRIvIsa:ORP:sa,REGUR:L.A;TORYrNuENREYIEIR 7D,E12::::,,y.: , ,- -.6;k0e•t •,,f r_ ,-,,k-,1,-,F',,..7:-.„._::,.. -..=:•,-.4 7;--,i, 'Is=_, _ -'---';-- ==.- -- '.F's.-' 'ix----- 1 1:': ,., 1„, _.:_dim .,,,, is_ _ _ . ,;,• %\.-- =:-- :- 1 -. ,-;", , f:-."- <1- 7*-:: ...,4,-.. ..* _...w lag ,- _ -_://7.,....T_ -„,_.-.;,•.:, 1 ...!...,•,...,, „IA:- ...- „4„,.. ,, , , . , ,,, ‘• -,,,?°A. _,____ _, _ sis .4, i. _ .• - -- i , ,- --,- -17 1-' . '... '4 . .r.,. IIIN.I. ':/: I - -----:- ---- - — --,---f„,- .. ..,-,;i-- , ,ay .... ,..,„.,....... .. , : ._v, „1i-litito • .., .. I . . -- -‘` . ''. '•,‘ .f.,*'.,k: "- _, .-- ..,..--...---- ' -- ,..'-'-.. - ,-.7""'"'' -=''hii,,-.".420,"'-- _ _,,__,-_ • L ' " • - -,-,-• •-'...---- o -.".-----:7-:.-.7:: --'-a-- ----- --- '- i'..-7'..- .Z.-7.--:f:P.'...', I _- .-' - r•r".".. . __—----- - -:-.- " s.... ...r ....,„ i.-/ St,,A vr4-C4' , v a \‘‘•-•••_1:-'-'..,,..',.....,...,_,,__ fl-11-._ ,4-7., i7.,:.--.7.,-7 _.TA _si5: . .: .. _.,...7_,_. : '4 Qfv'') -----,51-':-. ------ ----.-.7-' -. - .i.t.....i•.--T"'"' " - _"'''..'-=-=- _—'''''-' ----- --7--.": ":'="_--2_ -,-', 7 ,,,I. ,...:" , , ,'",... . -. ,/ .. / ---,..:. •- ---___-_ 4:,,_,,,,;-:..__„..-_---___=_; _, _____,-.3r- *.,..;1-- -- c,-,,.,_,,- ' - _ . -N.-, -.1 -- ..7 ' •..'-'•.." -- -...''-s...i.--2';',:f. -'' : ' s•••,,,,........ •-- ' - ------ ----'I:::--.._.- ., .,'":-'.-';• :'• - ' •E';'..-..rr_, • ------Mti 1.,;i..- . .,..___ , p‘•• I -. . _-----.---.-v-.---------- s__, . ,", L ., .: ..,....,:: ,T;'''' -................ ,•...._,‘L.'.....eg.t. `I -/ t, rif .'",,;.-- • -4, ,- ,-, •• 01:8441: IL ClitISTFIVS“Iii4A4F9• , - ......_.._'. -,!... •, ' '; - -- / _- • APPROAID:L OWN DM: 44 MC MIN Fj ,It..M.4.-.:48ift1, ,e.` -•.:, ' 4' ad i AER 2 I'.I • HAATW KTEHSEW A 5 R1IVEERR 7-_--.-,•,--,-,-,- • r•-•. , -::-:„ -, ..:: - • --4 i Bi:-------- •i. -.,;,-4-.1..-.. .,. -..-- . /41 Z"':,.'"-2-• --..jr.:-:- 2", i , , STORMpaNWATERDpDRAimAsEshIANNAGEAGE:3AREAsENT PLO.' i ,, ,( 41 0-03A1 SW SW-2 f'7 . 0.1 i 1 9 _ . \2(SEESHEtr641-4) ,...A-+ e C' - N85 zeme ;!-' k •.; d ;• 1,7..t,-‘,..k k_• J PhA 1D73 r 1 I__-_:_14 O s �s ),mai•.- 0*01121 `} --} p ':I '11dil 1 sITE�i 73 72 it 70 O O�,i'y OF_• 6 ii / ''�-�� •- t:/ ® O `.. • '{14 1 e \ •, - - .78 \ \ __ - r-- A ,- , \ _ _ � j - _r ._ �• 11' rs11 ' VICINITY 1 , \ ate— ,._wTTS. - • "I ,..\ ,., ...-\ \ WOOD 1 '� ' J • _ _ - 11. PHASE LINE I '�` 64 s5 66;-11 ,1 - - ,'`,� M'A+''r t, �d ` -- 1,\w.‘I`�11 I,'i 1,. I.. v. HIGH POINT/ LOW (1/4\� .. _ ] ' 77 '`` ,. - -". ' W _ 11 _`� ..- ` �I 1',•�11�\ WETLAND 1 • VI _:. -. r ;,1 V-I _ .� ;•9 �.' .>q .. .�'- Y - - .�, 1 1\ �•L • i1-. . JUNCTION\ I— ��1 '-�'ll III 7-761 11 �7\ ,,_�11,r,11V c '1 I _ -.. 1 0 1 6 1 F ,8" r\ 41��' ® RIPRAP APRON L. - 19 \ �� ��Vp�Q� ./'1 _ , 1 46 BpiV _ ® as ® \1'1�, • Il-`_S� - , �\�= \ \ \ _ • / - , _ , 4, , l p], , �' =.1( DUSTING TOPO V„�1 1�` \\ l \�. 'r• fY 1 I I -.'A 1 1�, ___ \ N. � go' - _ - - ..9"oi'e-, ,�1 : • ..t.,Ate' ,� _ � - - �A��` d i © � � r-'' '�'' \. - 21 1 . . . _ • c,, - `V 1: 1 i�" 4 V ' 1,., ® 1 fi 1 S ` leraEa�s.ARMS MOT LABELED As Ines ARE COMMON �_ i • ,, 2.M1 ROOF WNW TO BE DIRECTED TOT E 1 '� \ , i - 1 7 I 1 O 'o fKRMffIF.O SRIRNWATER SYSTEMS. 2Z I �� .r i ) V `\N II, I��/ , IV _ E 'Y�;V 5fi 14 I�,,7 \r Il \0Ak' r�.�W. \ 11 1 l� I \ 1 111 I . \®3 .:. 4 1 I r/ ). I i.....r CI) I li , ., I , • .4-., ,-, /,,'' . -1. .-7*tii.. 7, ' 'I'-'--'N--'-':'--'r-----4'frgi • ti , / 63 1 - ./ 69: �'•�_a � 21r r� - �`�1:7 -F_ `��/ \ �1�(II��I ` I�[ _ 7 �.is mil -/ _ - \. `IllTl i 1 I R I ( l O . y.a \ \ U�\�l,,,r, 1 FINAL DESIGN I^ 27 ! ' 6171 Vt . i_. 74 - 76 7�83 - _ '�\-� i�� ,� ' '• NOT FOFi CONSTRUCT/ON FOR AGENCY REMY/ONLY 28 DYE, - G , r r v Y : � \ a. l ` a F - r ` _ /' 1 C WAGED PONDS FOR TiEAYE SITE e/eroe { (�'✓��'� ` . _ aR paj��I�- _i /f/ l / RAC ' 29 /r�' $9 /. ,i' 1d, -I \ E 85 `` �` `\-S / '_.%1 11 B REN4n POEM A PER NcowR a/B/O) 30 ///��aa,,.���B0 / -_�" I. ♦ Q /� . �� I A ISSLED FIXi REDIILAidtY RENEW 12/22/OB .:; �'.9 • r _.t \ _ l4ij ♦ 1 -_,0 _ - (TAy / -1�� / 7 REV. f .4EAIPTlg1 6Y O '.Trua 58 79 //� \��� pV B° 19 ,{♦ � `� -,-'�/ • ` rr�r�- RENsas .F17. • • • R• f ♦rsA a r.. i ii . (�";, ¢ A2r I 3 \ � ' ` ' 80df3VY/ T, ` � j i V PAQ�CF/� a .�, `'` l 1 � ''\ , e `_ . � - y � 7 - 0Y • • /,/ ' 5 i / / r i• ..r i Ifil 3 � � O T 1 _ .E_8 • 3 . 90 .-fie 1 /- ` `�`^• OM'. / • - r ' `�' / 97 / ' - RWECTBdNNDARY _ :11 V1` ` r ,� 5, , 93 0 -Pn - - 'CI ®' i ,`; .i ;CAPE FEAR 39:. �.� ; _ i _ 1 • Engineering, Inc. /-1 ' .. 50 ,/ `r 95 94 an or 1 A - ` • a •• • ' �: Y R,M2 „� „0 CI ,- ail -':aa �,.--� 3is i _--�� to °® 1• - _: R_ NB�ER: 42 1�0 \ ', ' `I, `1 ` wmmYEO:S. DATE:. a DEC 2008 O , _ s9I ,:. , .ev n NDQ �` HAWKESWATER d 43 V, 98 • ��// 97 O •,B • ' " .Yr"xY!Mw- i I AT THE RIVER nl ///j �y 47 96 _-, 43awp C....e g 4.�=, as STORk!WATER MANAGER!ENT MA,MAIM VW MOM PROJECT VWY .- _ - , _ • , ,' A1.' r`hR - } PLAN—PHASE to do 1B • • .12 i BY' ,( 410-03A1 SW SW-3 dl .,'...' ".. • ' '-- ..''.. co 40 o ',LOT ) ../ . ':. ,/ • ( // . O • ; ,//� ..\,1\` 1 NW�10'fT NqQ/` \, _ 04,4.\ ! ,% 19 d z T � /\ SITE , i a j L ```, (SEE P 2 \ �_J `� . A .' / ` \ ;1S •" "-_ xorVICINmmsueP PH • l _ FE529 / ���/•. n y - • _- '. LEA • . WETLAND 1 a JUNCTION BOX FES Sa / • •:., �� • MANHOLE 1 v FEs ma �� 7/ U l�{r 1 A , ,, \ FLARED Eno SECTION r I 4i �. +. `II�II iini (/ $kX-'"; I \ ■ ounErsrRucTURE I�.:\ aEI'-1 EXISTING GRAVESITE \ WRAP APRON :\'• i iI// j AREA = 0.10 ACRES 0/\\\\ OWING TOPO l�\n \ 1 I`•I g �` \ WWI■■WWI PHASE UNE \\• 1' 15'ELERLTRCY�'� "' / \ • � NOTED 1 �EIEY.10b 1�1 1 I (L..: ��� `\, 1..NL AREAS NOT Li\BEIID AS LOTS ME CpYON \ MFAS. /,.�1'.. A., • 4 � 2 ALL N0W RUNOFF ro BE DIRECTED 10 THE `‘ 1•'1 1,-,-,.'.. . � • }\V\ •\ PONOTIET STORMNAIER SYSTEMS \\. ti ' PRIME 7,130 Ni \ �', a \ % iJ1���` ,.,,\ M /%,: " PHASE 2 FUTURE DEVELOPMENT \ 1 1 N. \-a. as lae \ a+4 /► h �'. 17.$4 ACRES r:76 869 SF) \ �` 11 C;` yl 11.70 ACRES IMPERVIOUS(508,848) • .v •�r_ v - ANAL cam y � c NOT FOR CONSTRUCTION FOR AGENCY FEVER ONLY • • I C REVISED Palos FOR GRAVE SITE MU' / ,, _ •_ - _._._.-.___ , \ El REAMED Para P PER NCDENR -3/E/G7 ism �.� A ISSUED FOR REGULATORY REVIEW I2 / • \\ \ REV. DAM \\ -- \ .-._' OESaEPTaI REPAY DALE • • _, yQ� \I �\ .. REN51(NIS - .. - II 1' �.\ V - -... _ ... _ 'N _ ' , ' ,\ • . (6\\*O•S:',"ANS, ,," , • , ,,\ .. , . \ \ ttp Ei-• .. r.s aJ.. \ _'a CAPE FEAR Engineering,Inc. � a�. • Win,,, HP X el aR EL 25.40 _ -/ 1/ r] _ \ 1 m0M: IL ARAMs /mom. N0_01 __ _ _--- • S ` PHASE (SEE SNJEE7 SW i OE4%: L.■Rx r..e: ,•w • MARINER:L OWN WlE: 14 02�m • ' ' .2:2" \ — --_ �..�—.�._�`��—_— — ..::• , \. \\ —— •, HAWKESWATER • 2. i 1 _—__— —. i�N —.•_�__ —— ` FOOFT t0 �'::: , a AT THE RIVER ' ° \ • d, e ' . - ``� r STORMWATER MANAGEMENT ):1\ T I . \ '` _ - PLAN—PHASE 2 1 410-03A1SW SW-4 ) `I ' j �_`_��•� PAQ/ECTBOUNDARY - - - \ \.a, \ • / - �. ' �, .Z "=..q !� - .\ OB �yp�� _� 'FRQIECT' . ,r�.av■:w \ �� \`,, „a r '\ \ 52 \ � /\ 53 54' `\\ wlo _ '` �,0 99 '� •¢ ' \\\�a\���-•I �.�r \ ` -� .. LBC�G ® T.I II 'mot. O 56 5:°` 59 _�� P "'•Y'�` 96; 9 r'� 9 / \.�+N tea\ �', \\;II/r� \t` , ' \ \�\.\\,_, _..._ PHASE LINE ,, ..�„�. .. - / 59 ` "'c.aIn� _. /•/94 9 movrrw ;1,�_ �\- .-‘. \, I�I�1 . i�' t -• gypy� .60 O - - ' s ue J .,_! ,, J`. I .__ .`\•R\ ;\ 1,;1 - vuETLnxD `eli� y,II � � �,a�Vyo�w ..� 76 1 , 61 'O" �� _ �'-` '.. ,. �, 911 t1 • \• \ ,\,III \ ■ JUNcrIDR eox j �II.I �NRLVmsr■■ '`a "G �/ /�(' .l \`'•\' \ , II • NANNOLE I T I J , \J , I• r i 7. '\ \\ i� 1 \ • • CURB INLET i ! 1, , I r� � '6fi.'. 1 _ 'A — +Mc • n `.:�` i1P '1. - }lI e /f ``�' -. ! ,_ FLARED END SECTION -,..I IEES Imo, 51 50 49 a ♦ - - \\. \', �- ��" ) 'F'•'`' I - - - - • �� ECTBOl1NDARY ter /~" 11e1 ■ OUTLET STRUCTURE f I I I I, _ O w i t v ' �\'\ i a., 48 `t �.. Tl ` • A 5 yr � •. \\: ��\ III\ RIPRAPAPRON F , V I _ \ ai ` ly • ` ' �\ /; Y.l • . r . . - �''� \ `IIL __ EwsnND TOPOl I — _ X :♦ \\ �73 i. T ®7 7cyn� r �- ` �" - y -• / i® =y q' •fines. I ` _ 79 i � ��yy� / r 8• / 9�0 / ', • I - `� - rasa, I - \' ®,l ♦ �•On \3/, .'mil i% I`•'�/� � •\- , -\ I_ Ir. - - — ))Y a -`,',AFL �__ „ ,`, , ii. ✓i �`� LI .m :a. • `� � \ ,0: /6-0) 89 �i r , tI - o `r,.�i" \ 28 � L"30 -[` ,� ti•. K �..''P%�q`,`''`_ ..y ,.a- .• /, • ''! --.—era's"` ___ .*, •�{.5r� _ `\.;++, -, F\ iac�iL AREAS NOT ue¢m As LOTS ARE mNNon I •� .67' ,,\ � '°``� _��_' yam/+ /. \ �` \ w� I 1 i u.L RCDF AuwaF ro E plEcren ro TrE \ I I Ir • 31 .- '"-_••�• " •f/ /:- �, �\\ � FDavrrm s*a+wunR ssrors. • - 1 I (/3.2�-) `� ci � B2 _ \' i e 1 z . . /. . �v�s . -• \ ` �J \'... '1\ � I' I 1 26 38 V `k� 1.\. �;)/ 'Os - - - I 8$` • I R _ - . J/ _•1 .' F `1. •��' • \) - 2 k -- . .._. V 33rii /i^\ , '_ • _�\ _ - - : r- ;8 I- .I:T.F j I'� � ; - ► \ g A 1 . 4'� 'Ism \\�•',• s. 'a ' 6 \\ "k_ a ' ,A .!. 41' ,7 I•sg omrl o'r )11 ',��I, sy. \.. I . . �/ • ,. It1 ` ` �• 1. ,` - — - I I ..'.� 38 r�, -.�. •� an.lq f.P'i`�'., •\ _• :.� <.. r� ! n / �rawnr I _ y .` \ it r _i r>..sarxxr em... // �:� ���,/. ! �mi,. , - f :� + `'" %� •Iwir \\i _ems `q'��', •r _. 125 .1: y .`�' ese,■■ I_(,', �,A—AAA• _ �. �ma; �\ , J -r. 6 �¢� j��/Wnnn..... _ _ / - FINIAL DE.9O1 wh - - P'i l�� yr ! ,. `,�: ! �" .S/ ( - 'q- n/�. 'j IpnP"'iql'• .3 \ `\ - '-f - - --- NOT FORCONBTAUCTION '.<'(.a\: � I �� .1`// '�q• �Y o.vst'a■ur F.yyE!`,p'' 'I ,J '�- ,1 �`?` I I :/ �/� (I� -;1 `,5 \ �_.-ma - . q` \J" I� 7�• �,,\� i a 9 , 1 ,, 7, , �� .'I�d!`C'.- \N.k: -', 4, I�II�I _ ,\G. ," 0 ..•, •s�. - - FOR A08ICY REVIEW ONLY ` `` :, 4. o...a4'F,- :, s� A I 'O. \4 j:` ' �_r �9 _ - '\. - // �-y - I�Y ^x 7 t6+ �„� M•w�..�i`R1 � t`.�l�S,1� � • -4'h i� im.a , /•g' • J _ �rWr3 { v recvo wus�'7-• - • PROJECT BOUNDARY ,o;J ■ It( ' t ,aq��: \\ fir-.'-- ''.. �_ ,r-I 7 •- • :-c _ -- - '-._ k, \..._ \ .� Ji., w- . 1a- ,,, 71 \,,:.f , /y lF%' 1 r—,, "S�''� \ Q5 .._ i J. / �',,?'3w C REND PONDS FOR PANE SRE T } ,•rj� r` ,LS' _• ` .....\l i,N`...✓r / , !� _ ",,� ... E PE% • a Issum FIXt• Rene PnaN o her _` / Q I L \ ` • l REVBONs �iR +\� I I. a // e, fie.. 'w © \` = i r i•"_ P • i r I aws \ \ \_ • 10 I\ 0 ,_ ,N,„..,. ,\to ,, .. rot. " yn . /�� �8\\\��,'1�` . '�. ...TTT••. \ "sGx°i�e "�� �J 11(r r,.I'• )fir,�ddi,III I!II I�j ••s \` 1 14�:•' " III 1 ‘\ *i ,, 01 ��� �� , • EXISTING GRnvesl� A �� �` �I �1\ % AREA-0.10 ACRES CAPE FEAR � ) � 1 \r\ . 1 ') \\ °\ i� Engineering,Inc. RPRQJE.T BOUNDARY \ p �u,.r4 tr/ \\\l/��j \� `. � •-. .M..�°f nn..nw..aem,: �LY•: .-,.�. \ ___ �1 orsax: N.caws" swiss• ao-m , , � 4 , R ti.�1°. IaoDr: La1NrN mu. ,•ra ��� ■ \�` '•,.\ ' \ -_`` NOW _'` "M'"^a .. L�N.Rwm:L aN.w w\E: a orx ma J • g �. ao. -• \ rl PNASE2FUrUREDEVELOPMENT a -- \ "I `� N•. •'I*' ` • • 77fi4A SS(T/8,9695� ` HAWKESWATER 2w rs e -JI`\ ,'1 • c , ,r, TT.70ACRESIMPERVlOUS(508,846f - - ll AT THE RIVER • �' � \ aa STORMWATER MANAGEMENT a'T�` I+'Y. PLAN—PHASE 3A & 3B i \' ad ue m.Y�ranr/ `'ge • �. \. 410-03AISW SW-5 • v ,, ,1 A 105' Ike / \R _,� ' _ _ _ ., `..\ - C) • 6 ._ ..._ --„,--. -,__ 1, i : a ' '..,,WcL . - Ii_N,,..,, _ . .4' 4 ---k----,-,...____--....„., --to 2, , C):: i5Z• `I SCALE \ '`�<<1; ,\�F" 155' ifi\ `' � ‘```� 49 1 \` ,` ` ; `� 'r\`114; '=---------------\\\ 4,41\ ‘,\ ' \ *.i 1 • . p 44 101' v 1 \ ".. , \ � y VIEW oT AP .:. i Ali t��yy y °��:�.. �/ I s \" �D' 0.,6\ •. •. / l J '.10,-'V • CI `� 4� �'�j• .TER POND,fI �Y �,y\ 1 � .\\�JB�S7 ...• `t1 LEOBO _....: ��� � � - .fit 3.45 � ' �* .Yg ,35 `\\44 t . r _ r , :: P S \-.-:\\\, �� 2502. CUTOFF TR •,• �` B I� 1\' _ T CONSTRUCTM A ��N I/ ♦ - \�� `, ,. ..41Z 1 C ��� TER OF THE 10'MAIN N• 69. `�I\ •�y �`� /� • E ` �R�� II.' [L� ACCESS.SEE SHEET D-1 PO DECA t `��. ��_a p,.yP 'LEVEL SP-I ADER 1'YP.}-•«�«r 1. ETt 4N `\ �dA � - \ \ 10. MAIMT�ENANC,'ACCESS' \`^� �v\\- _ -Poa RO • SIi� O-1 - s. Y \ ,_# ;` 20 W-ET ••$ �, '` 6' ,�\, �; 1' . FEs/Tr- n, . Cy, ,,,/,,,- ,, ,\.,••\\ i,,,,Vii..,/, 26,. _ RIP RAP �i` (T1kr , ` \ s - •' �/ :� ,p,�A/�SEE DETAIL; S E JD- IN2 /.,,{:\' ` 1 • �-- ~• 30'EMERGENCY`ILLWAY .• ` / ^..,.3`; P `\,\ \ ' 21 `J /' _ - - 1 ' ��� 2� \ \\ \1 96 ' I. �I#53I ` / 'i �` 4�.-��..•I. NDlE6 Al RPE UgD I3D TO MET ♦ _� p 9 :'1 \-J \ V�� - OOT 9TANOMiD6. ALL NxAS NOT ABDID AS D 5 AxE CONxON Or �/ i `` \ • 1 '1 I •,... J���.\ it - i �:- i•� i` - _- aPE'NN�iTfm smxxMWAtm e515m ChDrome n I ti , ... \ LEVEL SPREAD�S`TYP.) �_ 1 • 77 1 : n _ ' RIP RAP APR iTVPP _ �`� Q \ • - SEE DETAI -SHEET D7'� _ -� ,_ .,6„,i4. 1. p STORMWATER PONDIf16 rus ma:nm•m- -A'-e-9 2. w • w w NOtim aux Poo WtxW sa x••A = _ ' ' xpro x veotten x ma r a xa.� _P�x : ,a: _\/ \ �� ,� \ _ \p-a---�y1,•-\\`i'v-,- friii_ v \.\\0 \\`l\,\\ -,-•i'-44— 1.15Miutinbmw [ r FINAL GERM \ 71PICAL ECTlm IRO VET N ENTIII POND-1,w wo•. 11F AL SE ON m U T R TE 11124 R m"'a •. n NOT FOR CONSTRUCTION j 1YPICAL SECTION TI#iU VET REIOi110N POND _... FOR AC3E31CYFEYEW ONL marmat „_ . l � ( T.-77f. „ 1 Aar 1TpJ� O� ---- -, _n (rySLi I MR wWx]0'HOPE ` �� -1 - , I ----- --- A REVISED PONDS FOR GRAPE STE-9/BT/Ofi P D SEP. C fENSEP PER SRLN9C0 ' mmi 4/71/06 El RENSED PAID/I PER NCOENR RAC '4.4 3/S/W CARREi~ A ISSUED FCR REQILATCRY RENEW,2/2Y/OE UM . 1112 i REV. OESCRiTONN REVPY ,111=1 / DATE I, � I rasoNs OUTLET STRUCTURE DETAIL S1pWAWATEA POND-1 OUILET 51RUCTIJREOM AIL STOfMWATER POND-2 WA on To waxx tilD ` --w- --.: - - - `••• ' J`.�7 CI#93 / - -- • WETLANDS I - ' //i,� I ,_ • (D . a 1 '' ' " 79 • 1;0 �P =rei tI \ , -.7.,::. 4141 -319"-HD o no nor zMx •e -_-„,,,,, ..____ , , _,_. , i : ..,.._,,,,,,,,,,,‘„,._, , ED) `��� /�, �� ) `T4r. , , , FE5 20 r', ___. � — 4 • fi X-\� • K: ,u . \,; ,",S - e r j/ 104. / J e--- ...�..,,:,,.. ...:� .cl CAPE FEAR s6, ti.k( / 1 8 w- Eng."... ing, Inc. "� � - .� :r TIPIGL sTxWON'MU IEf MORON POaJ p _ /' •` "V-, '.. / r •- a SP- ADER(TYP) I/J IERICCIFtf �: ,.n�er..., �� '`�. / '� RIPR - ON (YYP) .r< L•- _.RIP APROiii,rto((.111-..,-..: , \ SEE DET�I, ETD t ,,/ -• '�' .'R SEE DE iL; H. _ j / J - �� o-m • oPw•I «•uac Rt0.ECfI `...\;,,„ �. 1,, I. - -2 �..J (osol: ROW81p>Etl•.� a'm14 , I' �� /• y / - - - ,.�,,.,c ��• '1MIN aC YR)PEI O•a: L Wuux 1.2. 1'WG'l �/ i- - �� .1. 6 'WO..3D'sr �ex*mrm:�" ." oAc: ]S Gs aCG t It' i, ' F. \ `,. ` �� / 3 /,P�j °'�I� �� , "°" HAWKESWATER . �; `,\\,,, Z •CD 1 6 i : «.� r �.. .i ' ATTHERIVER-a`!w/ , / aaml><s1m ... ' 0 i 1 P *` /'. \�• cp /•, - . A I_. ..1PHASE 1 — • AP7y/' ��' CUTLET STRUCTURE DETAIL POND-3 [ O13 STATk!. �` \ Y PHASE DETAILS d *;Lo9AonoN Ili \ / "ice /J� ,'®`` _ BY: STORNWATER POND/6 ,L410-03A1SW L7-1 . , • I iA^1� 0 t -CI fl 0 ,, ' ..`".....-' M ., *iii*.y ---- ' ' , . . - , /1,-,, 1 . '-- A' 6 . 1 , , ,, „, ,,, s :., .., ., , . . .,.... ,,,,...,. ., , ‘,..... 0,,i,,,— .--_,_ _ . . , ,........„ .,.......,...,____„. ,.., _.... , - , ,..„,, f 1,,./,_, ,i!'•''', . i j ) "�'r' ,a..... fir` '''. 'JB 1' ' AgiN �i P r LF .....w a /1 �, ` // 1N00DEN BHRFLE .% VICINITY MAP zainfarmi ����/I�IIi %�'# E DETAIL;,SHEET D-1 ,•`: an.-.. :.T wwr I Normw:NE J LSEILI� LEOBD co. --- ...... . i � 1� £r$Ia4WLcYsPILLwAY yve -� wFrLnxSJUNCTION BOX u' • a. � `� •E 14.0 - - COI CURB INLET • 1�All,L �. FLARED BD SECTION LEVEL SPREADER fTYP.� _ ., RIPRAP APRON (T1�P•) ,`ti�: �•a- PHASE 3 -POND 1 ■ OUTLET STRICTURE .SEE DETAIL; SHEET R-1 - '�a..-�, �' ®�� STORMWATER POND/1 ee RIPRM APRON EXISTING TOPO r I i __ r r l /,, ' "fit 01D . .r, /■1 I - I. i ) f- , CI$17 l �/ 1 NOTED. , !,i ^11 ,,..:�'• . - _ I � 1�` Wit. .MEM NOT LABELED AS LOTS ARE COMMON -'� !` �� r \. �' `f`, \ ].All ROOF RUNOFF TO BE DIRECTED TO IRE �� ` _ - .—. 1, �� �, -`J z , PRiYITIEO STORMWATER SWUM 1 CI�l23 ,.o7i ��16 • � FES/29 I", :a Y�`/��� �I���^ar1\f. 1Lim 4+ ,`I '` . -ptE 'lrl , o' r' .,11 , ■ '._:.i.1 r..- or Aroma.RA, 1 �J� JB/19 ` , ..!/ly �- Li, -^P,� .. �. ry` ,,., L.i_ r i um MC 11 • ' NCR-FOR CONSTRUCTION ``, • ES/10' I ss,'i(jr �� )d _7' legrAl�R Y ..'�C' FNAL DEBIOM /'t L ..�(( i I�II*pi1fe,r ' /j• 1/ T• ---- -..'-:.. ▪ i - " 1111111111�l1 ... FOR AGENCYLE LSPREAD (TYP �I _ �RIPRAP APRON (TYP.k �. 0 • ��� , ( j MOM,POOL `7 r _ 1 s I II EE TAN SHEETD-1 •II 1 .4 ". , x., EXISTING GRAVESITE :ram • AREA = 0.10 ACRES Nww ▪ � � -- r� - ' 1I 1 ' • 1 )1 RIB • - \' ��... �.S- ��� iplkl _ �•e.�i:� ,� w'u �� sv C RENSm PCNDS FCR GUVE 9TE YLT NETiRNDc . ( i i S/B/MB DATE 1 l 1 t` ��:L �� ``ii _: a'uSTENSEDpON ,F PFRNNLNR3/B/WIv [ 11 N A1 I����`�J. , �` NRS ', ,•y , I ` A ISSUED RJR REGULATORY REVIEW 2 , /; . , i'� ' -��% L�J PHASE 3 -POND 2 ;�' DESCRIPTION ' '' . ,' , RENSNINS + 1 5 EMERGENCY,,Sp1LLWA \ E 4V 16.5 ■, \ STORMWATER POND/2 O .,:xot,,,,e01.01180 .„,; „ill), • _. ,��FES/ •., 79 * .......„„ _, ,„ .\_•., ...., ;...p.. • • ., ,, ., . .. ,. , _,.__ _,, `:FES/80 43/79A i, �l�° .� ,`, . d. 1.— ,,,,..... \^ lni r r` ' 1,•2-I��t :•\ S#IO7 - -, ; .= ,w..a. ir:1 rPN., �'CAPE FEAR , ` . . `\ •'l ' in ,� /: r \• rell Engineering, Inc. •�,,`- , ' i %iif' LEVEL(SPREADER (TYP,) `\ \, rI ��, '`1 RIPRAP APRON (TYP.) o eo ww-'w ..i.:w.'1 .^... .":."^a,""'.. _ `� � �„`r I :�j1=' �� ,it SE'E DETAIL; SHEET D-i 0m onure Pour sty" '" .`l --, ���i• '• i 'xa-aa Fr re.xaxr Poo r `- r.awnur PROFcr_ ���� d�'�:1 ��', i ••�1 \..-_ 114 a _ —�Ira / _ "LT. r 74532 ••• � __ omc:. ..rr-n.s xuraB: a`� 2 _.�`� 1 \ 'i ,� • 'oar q/ � 3" --.., �`� 1f/ '�'. Y �-r�,^-wPPPROVD:L.MOM w1E: a ac m0Nj�' (2) 34 LF WOODEN BAFFLE / �� „� IeE%�i 1 r � �* ':•` :SEE DETAIL; SHEET D-i ,a,,,m,,, +� "r �, w �I 7-If—r LRI: •. - • - 1• + -"'.'L HAWKESWATER �• r` AT THE RIVER 30'EMERGENCY SPILLWAY i r �•" PHASE 3-POND 3 �°""°°` m"®' , 0 ELEV:. 11.5 v • . STORMWATER POND/3 I PHASE 3 STORMWATER PONDS 1-3 J l do POND DETAILS 410-03A1 SW P-2 oci �.L�. Or p Nw a R 6 ,,,,,,IT,„,, ,,. O 6 ___ 82 _aR �1 �.,L . r, �° O \ i srrEf r - -- - .`\t LEVEL SPREADER (TYP.).. `. •. ,.I _ -- - - `'\ �1Q. RIPRAP APRON (TYP.r `\ S _ .. <'� SEE DETAIL; SH ET D-11. �$� ( wcwr1y M p - :\ /� SEE DETAIL; SHEET D-1 -f-- _ _.-. - 15 EMERGE CY 5 I LW Y \ a �_- ��,� 1i. ®ELEV7 n '' .. 26' [t _ ` -,��� LEoea „�0�`` J8y57 6 so /� 9 _1 w;�• � �'. 15' EMERGENCY SPILLWAY ♦ .0) 65 LF WOODEN BAFFLE 1 iii O ELEV: .0 v �t� - ` 1 �D .\ 1 .:, FES(R56 �.. ^� FES/ip1 ��/•►�,:o�� ■ JUNCTION BOX CC �/11 SEE DETAIL;SHEET D 1 ' _ �5Y MANHOLE . P. if , ipa,75 ,� .Q� ��/�14. �/4j �+/ /, c 43 . / <r' �•>.� `i 0 1 � \' o-^`_ - �q `�` t`-_i \\ N CURB INLET \y /1 /"r vJ .f /S� I� 0111� 6 • - FLARED END SECTION \ /` Il 1 I .,•� \ `CI#37 -"� f "/ ; �`�,�-♦ �' i _;_ts' ';�i O i ■CO OUTLET STRUCTURE RIPRAP APRON '12J v _ 'f: 16.s �`4400‘ glif :35,sfi �is'� �. '��71� _ ,/ / .. 7 ,'v, 'Chp38' ✓✓ice t e�� /1i� `! �L-i��( ss"'.��: �t ,__ ExIBnNDroPD �•• Cs`�3 Si® i -1-' • �+2d Cl. A ji\ \ •w 'IA � ` FE567 _��\ f' et`\�,!�'�� �� �� `'� -ze' I ` �`.+•.�, � `�_0 .� �• -Y�__ ` � �� i� '1� •a E. i 3 ��� - ''' • 1ct - -E WA -50•R _ -- . I" • ►`-�; .... J' _ - -stop* e-• ;i •' IJ61j68 - Nt-\:_,,,,, 'p!)��//i''�'� .- _y _ W `_ -I J• ��� 64 134,LF iV004EN.BAFFLE —- `T - -- I�p.I ! <) ,,� '/ :.- _�' gOULFV T• 9 D-sC�, •� SEE DETAIL;i CY SPIT WAY 7/4/ �� • 4 �/ a. F DEN -JB09D 'IBM Q= •' (SHEET D-1 I 5 11 �6- �, T 6 .� #g - .� r'� • • _ � ETAJ4FI€ET;D CI ,\`yr: r�-EL ly ■vf� 15'EMERGENCY SPILLWAY 4 ``. 't " II �' 'An�A�a - -�/ .. % ��"s ,. mem D- ®ELEV: 8.0 r rt • LEVEL SPkEADE`R p y��� �� ;! • �!-.- 1 ,u us,.s,wr ue¢eo As wts ARc caelwoi � RIPRAP APRON (TYP.x s ♦ I/�� \ ,/ _ � - ?'! \ ,'SEE DETAIL; SHEET D-1 0.• / kk4 y{.. 51' 75'. "• ---w_- , _ a \ nm ss�""oRrzro MIMED TO n¢ ,�>; iii . 1I L`\ �'��:7�r 4f - STORMWATER PONDNB b , ! `� S70RM R10 LI POND/4 _ OS 100 ✓�/ �▪ atit �*a�� ` ���. �\ ifi : 0•' �1,.�y�"0�'1 17 1 • {\ r. ���1� J�11J9g11 1 •// �n. ■+R .- v */�� "m. (3) 9 F ODEN BAFFLE , ,e<,:..a ". \ � 0.1....., O`�` :V-fw __1( . � ,-FS .SHEET"D-1 ;,,,1 ! '�• � t '• tt `\`8:1_, ~�, � • ay �m • -LEVEL SPR a ER(_TYP J t ` \ „ RIPRAP APRON TTP t d - - ;SEE DETAIL; SHEET D 1 \ ,0` t` .--� r RNAL DESIGN 1 1 ..e-:.. NJ.aM.P00 -V. . ;\.�, ` • VI.6 3� " .�', FCf AGENCY aEx- ' _ Ta STORMWo.aTER PONDp eiw T STORMWIER POND/5 - PEIOLOWST POOL m... ..aa S A- 9 9NNW ."....� '' _ �.�� ....... 4 .Or.� ./` l 1 UMW MI PHASE 3 -POND 4 ,`.. r..: 's "' .. m'"' -. .. gym.. PHASE 3 -POND 6 C RE1'IaED PONDS FOR GRAVE S1E uLT jalIKINFit are/ae B REVISED POW in PER NCDENR RAC iDPOMW POOL 0/a/OT .w-•. pOILYEIr� -- A ISSUED FOR REGULATORY RENEW,2/22(0fi OESCPoPTON REV.SY DATE N Pon -.� �� aWER RFVISNR h S El war r,-, PHASE 3 -POND 7 PHASE 3 -POND 5 -,. ELM JE,E M. - - _a a sr. --- I ...._ -1 _ :, :iemi .,_ �: 't- �_ GIs .... FL� =-",3i v tow .- �� jai .... e.1 R AraMew�... � Y J • .M Oil ^ ..:.Y��� BELIES or — " x-..1- _ IMELEE,...UE.A. a _e..- 1 CAPE FEAR °'n"a -• • Engineering,Inc. Fla in i -IMP- - ' '` IQe - ....... _ - --��.Fri iris. o Y}- .`- -- Am. VT31 r ssd'a'' - `� ,camel: :E■mare I"msr m,o_a ` �s '1p �.au OE. L.PEW `-GALE: AS NOM di T i.. a a wa J NPevSSO:L.CW/A NM: a DEC fore M... ..r �.. AT T ESW VER ., Efa�NaRu 4: A d AT THE RIVER »ItDa>o■umoa 1 :i ( 1 STORMWATER DS y Ee POND DPONETA 4-7 ILS J BY: ,( 410-03A1 SW P-3 .I e F NDYro SCALP r sat 1-..N"W, ,D - - PHASE 1 STORMDRAIN SCHEDULE �.. AArla 1r �_I_i� . Ir Su 1.M1 amen NMI M.q a.6e1. Par... --- PHASE 9A&168TORM SCHEDULE N m W W Ep Y a:Warn.TA 1 1 ____ LLNc IA.I.Wa,...le.... PI. ...ha p Melial.T C mWrmvw Mc. a i1_ La I n ni IBM MN �� er ----- r 7 0.90 99 .. OMAN . HOT ,c�a ,o as ns `• ---- vr� Fs Wnlmo .0 wus an-1 r-/^J�j so ...........3. ®Y amLee • D�E iK aei rosalr........ I®.11 �immsaW n na I I I-J 11.-__�J ®m • gbd4 W' E-1 am POPE ale . n __..135...._ MI5. 1 113 1401 lac NM S. Na .•_ MALL was Oml �_^ Mm,um. a.m. a K am raa mm a tom • Ea. a a KZ NYE 9 2. �� /1J/ amo 14m 1 IIa ± Ram a 1a roe nY l aRG a M 1L an am a!1 ,/ I I ____ PO.a OoemaS. a le On TOPE Ines n% 14.W 101 Muse N I nm an 1131 x9I as ISOAE'IRIC HEW � ti- PLAN-r F OW / '• OS. 1e Om M. % AY- N «a Row m R KO Rem ��•, ;see s x a 1a eq as n. L J mWr-' an SSE MN sex as... le IVE R.... 423E .. @Y. MIIOU a to - r¢a _ Mlapn a a aW IRE 1� a@ N1a -. _ PLAN tliG10 a t 0.a 1eAE eE tiY gflBWll x 1W aN MBE xA am r.-{n4 _ . p�rz - ,D' B u MI4MIa a x V IRE 11x am am 'ma T._ • '. 2011 ,e I1W! P.11 10.4e 1nm AW ONO. 1 a 1n WE Um WI % Iii - - p� • 13 lei it OS. I'PPP 0.Y 11m LOT • .14 _.. =IIMn 1 M OM In 019 AU U - v m E MAP a is is a a 113Ps ma ta_...- aNiap N x lu APE Ran an WI �' - ml �� ,mMINroO. . - ... =ISM1 U x S. NM mU KK ma HEN ss .PIN.: Ra as :% am gl4aal e 1 11a IaM Na• am an 11. amm a a POPE 4n1 am 14 a m IWE w xn An r-� O I / - LSO "" re ps feamalm le a ,see WE Na MO ;u x TOM .3 3 -a 1W MIX 0.▪ ]M" in*. '.'MIN CND= 11 a Ua WE IeN u ° f���-. Caesar ad x ®. HR eAd ,m P-- M1e 1. a esaW a 1 1 *AA 1 a um NM PIA mm am SECTON A-A �- SECTION le aW ': a “s ass loge o a is vei tel nm'a .011 �m�• '""" 'a'��SfOC - CATCH BASIN a1N9rv• ••I11 n +e aW 11319E w a% Tar oMm a a9 HIM me as ..a..4..� es." • • FOR PIPES LESS THAN 18" DIA. Am® n a a .. F�m.•nH@ 9 1.-- an 1..: am as cm na a0®m1i 11 a a H. Pia as MA . •'"m ex� .ter JUNCTION BOX NOT 10 SCALE weSRBY 11 le e.% MAX'afl. A% e.0 ¢4.r.....tw.tmr MSMM 11 14 an INNS Na as MN =re........r r..... NOT TO SCALE 2ENiat-m,K- m au - us a am Magm n n am HUE NA as MI WRAP AT PIPE LTIIREI NI a Ln 1. A tm•aa K "a L.al -,IAF,,tiX IA 6a TM aafam m Na 43 NM :- mar m n lam Man all 2123 aA RPRAP APRON SCHEDULE-PHASE I MHO. m 11 Aa IRE mm aO as OmcR IMP..o... _ _ -- C.O. a m sm 10£ mm is• ,r ARAM a a ad NNE IX as sW a.� E AA9 ELEVA70N MEW alaa•u,l•e4 111) PM* euI) am are 0maaa.i) Ma= Na IRE an OD am N -- r) Parr N N NI - N aslgm U m Or HOPE sex Alm as r If Mr SIEEiS Di 4'�XI/q'EKTEieOR TEp) iEe O, IWPE lam 1em 'Ra = fa x N.ie Iso LA NM 11n e• OR ECUVNDlI(TO F%IENO TO BbTITY OF PEUNMIEIIT POOL) e a0. e3 m T MNMII U a use INaE 111 aY as e• m WF WI 4x zm" plasm do 0, nu AWE line 11W lie 10.6 W wl . N q1 a,1 e e Rasa m Ii.Y OamqIii�Naa to a Nm NYE nn AA Nm a .r fen sew ea . 2a M IV �.:.1 O1B Aa m to- -•aR man Ina '70.ii'' tlNeMI1 a R 1605 NNE 19 me Km I I I I • . - Om 'Im6E -Oa"1aa Ina na AMaM Nm IWE nor an MO a]-O9 �a 1 ado ICFE an am 12.33 110 M.N. 1N • as WM MHO am aW lare r Ira m aim _ _ _ _ a a•Imam fax 6.11 a• OI•-Oa to - our IUPI... rm. Aa 1e.K __1aK M1aM a 6 nID IRK FIN am N.K "� _ a x'ma ALIT e r e. M ' gcnow A A a1Y-dal:: -22 "a 4® Ian .2--am u. - an PRAM al x Nm NYE 1131 aa5 Nm NOT To SCALE .. - OZONE a a nm NNE INn a9 Nat Iw•xsi aa4 Am ! M a POSSE NMI.92E.4'MIME(PfSISEFIED) A....', W.a 6Y 1150E tA@ TAW 4a arum 1 Na RE 11M an Na a r u SET AT LEAST Y INTO iNE GROUND am.. m om T � jm ® as•tla 0 6a I[PE TAW 9.Oa _- tax arum U n ILO IRE 10.1 am sex l r aa-aa - d .12 irk MOO a a VA ID£ nm am a9 RIPRAP APRONr r -sea to Y Poe am 11W Sp. MM. 1 19 AA IRE UM Rem ap SCHEDULE-PHASE rPEEN OP 4YSIT EalWaae(PRETREATED) " i.. r ON " 2EBa FEea W (a4E f.m F. N as ... 1Nl.am 1 la VA KEE Um am � Iv. ,� _ Y OR ETNAY T a y. Leo am A.M. 1 a III ME Um m u.a. ly- gpW1E1 Eli a gio 1.ALL AREAS NOT LABELED AS LOTS ME CONKS 91231.20. a m �... ARM 9.00 Ma Bm 10.34 COMM I x n9 on MR NZ ]tm 1 er NM HOD OAO L ATL 3'a0373D.49T e&(PRETREATED) •-. rrrr AREAS Bien bo EEBm a ..'a -mNl -W Rae MESON a a mm ME sm >w as a W WM 2a La BIER sma•i�ro THE . - COO. x R 1N5 POE IN xa m - - r FERNITIFD STORNWA Gn- m- a a -POPE ea _� °maw 1 m Na IRE n1 am Alm a NDET MW r 2.ALL ROOF RUN 30 OM ',tat aaa ,aa 0.1T 1 T am ' RHO am u BAFFLEAIL 1p1�' r am-am a tw qORM��11 sa Y as K a nm ICE ta10 do Ill ®IMIE 9 a 9a11 NNE as Y Y Y a Au KBE •as na a.. x M 1u HOE an Ka as NOT TO SCALE er.amlT Hm 'a'm a O t - a n 100E 1Ba n 74 11.m OMOI1 N a NA IRE 9.0 nW as q 12lsi a a41 JBr a, fw KRA, Am m s>8 OSIMIi II a WI MIE Oa u uWCODEN BAFFLE SCHEDULE AM-aid kb K. ._ sea:..: l -.ea.., AMAZE 1 1 e He 5 _ LEVELDETAIL all IRE a1 r d qe-a« 1.m aW! •Aa am a. ai- W ma a .m r SPREADER 10.a 1Aa OM✓i 11 a ale IRE mM mm v r r .. _.. .. ..._. ... Am40m II x 1m MIE Ala N,11 a1a . ar IRE le A« a A• 1• IV NOT TO SCALE Om=a* a ti am Iaa ,E.W ma An am - - 1 m4 use use FNN. a IN ea NNE Ua 119 alb Oa-Om a a 1m 1131E "Aa am mm seal MUM a n MN aE 12.12 KO KO of W m• a 422 r a 4 r a Oa W Y a1E-aM l to 1m TOE ux or an m.s mammon MAAR, a M 1W1 MITE KO ILO n1 a - .. - TOE •1a 'or able' -L.® _ pram 10 n +a1 IDm an an Nn a a5 so Mu 'a n q0a a 'id- m TOE 1 am ' am a pram M a MP ror sr A. Rl 3 KG ma Lu G . 1 a '• i mY PHASE 1 STORMDRAIN SCHEDULE ' `° '° "• wm)_ 11114A0.a1i0.4.a•aryN R 'roam Y.1AIp mmamla.m amlFir4iStr=a • :� • 14tii• :.:4 lIYN 1.1r Har.4 r aA N ... iY.1a' • 0a Om U m _ am T as - Flan. El tlmam m es losU.0 MK us Fla mZIA �MO jL - C q m qn la 11 11 uU am Um fan _r cui•ma A Roe an m Rai en.. n « f n - NM Rai un0ia un - ---------- I FINALDESIGN @ n • sm ±13pE nY 1Ao to n.x amps a 1s MI wE Ks NN As 7r coo am a an NOT FCR C019H1Po1CT10N E tis•urm W-x in -ip sea® ao am ......am- C.O. m m Na ME As UM Ileum a Dna.wr- FOP Ma aw\ I x. I xR• _ & r W-A' I e• FOR AGENCY REVEWON-Y K v9_ OMOA a a an NNE WI am Wan zTx m-mm . am -INLICINCum. a NM WI Nu SO r tmWN M M REVERSE SECTION STANDARD am• ai la m 099/nw MI 5.14 am asks lose Ina Drum • a an NM 2.2. u• ¢• -' ,i D SECTION w �� m m NNpp al • - qY M" ID neo 113PE" ebb i! ,naa ±tAO .. amain a a U N E 1144x1 1130 1111« 11.11. E�SROLL CURB & GUTTER 1B1 - �- a a um a ON a "a 1m MPS a m CM. 1 a Ha NNE as ism am 1u Ili rAh. ram*' tars !T. �� NOT TO SCALE tlr ON x anew le x 14A POE lam use am mMn a POE ,ea A• +sea • SECTION Y OW•am Ea x aA I13vE SW tam a as MHO IPmaha HA v w INn FRAM,GRATE a l®D MLT Ax _a a u lose • na aK ap�mMaYP : O Ma NNE a Yf NNE v N fa wm mu W see ELL an USE ON CURB ae1D SUTTER IALL 6 fW IS 9� M,GDdT.STD.NN0.a9B� C REVISED PRID•E FQS GRAVE 97E TAME aa0 a tt 0.m 113PE' W._.4it Rasa "tab" aAORIa O R s9 NNE am Alm . - AIPrMat a a _ NB nam an nN TYPICAL STREET CROSS-SECTION RBS BAcx w awe MS pW a IVE sY -... 4m IN.. a IV VA APE Na >14 as ENNERDALE WAY(PHASE 3 ONLY. rn•Ecrma SILL i REQUIRES _ )- -- 9 e RENUED PER BRANS Oa IMF am sir ai iu es o ±p •is 'us 15 sr •roe ale = :. a sm ROE Ma No as &HAYM(ESWATER BOULEVARD-STA.21+33 TO STA.33+18 S- - =,���Ld rwe a a% - e id lust as use M 1a NNE +� a as NOT TO SCALE a ®" T I F �S--1 A ISSUED FtlT REGULATORY RENEW Z�, au a a brava n 141E IA iai0 MIsaR1 a a mm D 6' 6' I as-sea a is 1.K IahE ale Rix ado tau m M Tr IWE au au an _ ��iI I R�• DESC�TpI R BY - .. ovum m au WE nu xv asEWE prima to 6m 1Me +• - 4m MlmaM moms v �_ an mN an r M M - I �t�t♦ REVISIONS am•am a DY POPE an sei 1e e.Y O�OWA0X1In a a • as II C u as a: °' °' �,� /I/// aaT ale a m ea. MN1MPn n x 9m an sex �U a In•m Y4 y®� a A ad _ ex la. MManO fe x es seal rAR. Pros VET. � X • ow ±m ,e owMMmx HOE am Ma '•f SECTION X PLAN age 01,. 21 K 0.W Iaeg % as Mm+ama a a ,o NNE an KO sex OIM1MIn 11 a A NNE .■ as a gr.I47>Pa v I�Ku a'.m 1 - 1 FEs .Rase - m.: see IaXE is ale 'too ads Maas le a mm NNE fOlmm a an 24,au �•MEL WO CURB INLET w$ RN a e 1.. --.«:m rsMMu am p lee IWn am ,sea ale TYPICAL STREET CROSS-SECTION ( NOT TO SCALE FOR CALDER CT ENNERDALE WAY(PHASE 2 ONLY).& 1 urw.u.m:I.ml... N. l sex 2..ua ti Anse.b.orra3En.w MORECAMBLE.BOULEVARD(PHASE 2 ONLY) ¢a,.- •� N 6) IN sans W N N u - BCOmoD a B'NIEAVALS, fee aid rm5a NOT TO SCALE ,6T a as a NEE' 4a eai" am am-• z�$1I1 ;DOO PS CWIOE'IE 9DEWAUT, aPo"3 q qa m a a tEpE 0.W Rau 1 m _ -_ 1 `� IN PRIMOWIPE AGE•/FOOT 1/2'CCP.JOINT a 24' ap a13 a x - 4M ' M IN Dw 6 MANAGE INTERVALS TIP.& PI as a IaPn Kai % u• 1 CAga TI M T ALL RAM aal.3•011 1 n im maa WYE 7r 432 i ale all am ure ; - -- -sea-_ a yr IN rift. kV", rat �+-- ...� --- j: NTv+s 4N_ 2C•@ eNW K_ K" •% IWPE 6u 0.a• 0. n.K }} ¢g _ __ ; W FleBN ]l to ge IEEE sex air- i Z a'Am CLNPACIED SUBCRAD[ a , wPE Leo am am ;nm ------s1�1- N'_-- K•IML MN/ �.'aL as TYPICAL UR-WAY '-p°M asas• - rav-«o• - . ,m rose as .. TYPICAL STREET FROM STA.ECITCII 1e Pm -...1600 CUL-DE-SAC PLAN FOR MORECAMBLE BOULEVARD 10+00 TO STA.13+00 INTERSECTION CONCRETE SIDEWALK 7 W .a • -_ 1m u. a' .1_'-i13PE aau 'a.a'_ 00 - 1a1_".._ % - • NOT TO SCALE NOT TO SCALE NOT TO SCALE NOT TO SCALE Fes W n m APE in m effi \ / 1°- LL•W INTES (- °EC.4PE FEAR Foam-ca. IT le 1211 m.E a. m E� - - - \ 5E81Y-M Itl u a 1m HOPE 14m use CM nm ,\ _-/ -- ENIr�,,N`,.T ,^A*1� 1 j'AT t•IR. 1.EXCAVATE IOAS PEA O,MING sNOAtI U9x0>:,SLOPES. r op....... . ad" FAS 0..B,l01 2.CONTRAC ER IS ROACRSOBIE FOR ILL DE-WATEA"O REBORED. ,�"mje 4 ESTHWAITEDR. I .,� ea' 4 www.coalrmx.Nma. . CUL-DE-SAC PLAN - ` "' AT STA. 10+00 \, ,.' "-n_11_R_r-- TYPICAL STREET CROSS-SECTION N aI��� II=11���' Nam 1�aa a W1 NOT TO SCALE .` ,/ FOR MORECAMBLE BOULEVARD FROM STA.13+00(PHASE 1 ONLY). III;,II=11:=_y (DRAIN: A anal• PRINZ .o� ___/ I;"."'I.CESWA1ER.^ii'AR&975w STA.10+00 TO STA.21+33, a>Ass i vTAr A� m.al"a.N o--'. K ca®MS IMAae1: r?geHAWKESWATER BOULEVARD STA.33+18 TO 34+76.97 re ^ '! aEM: L Mk. >aua: p xmm OFFSET CUL-DE-SAC PLAN NOT TO SCALE �1 \) �i a ,� A1Baom 4:L MOM WAa: •NOV NOT TO SCALE .( 4`�, 4 FEN AU.PiE59B 3 S z 'IV as IV ms.Ea se �� - •�l.a `m^TM a R PRE. LI f' i U. u ¢,m 511BTAE ATER 3 k RIGID PIPE Yn°m@ 1N�A�AND APPLICATOR RATES HAT THE WRIVER o , - -ate tin 'iyif7.\ �..R. 1_ TRENCH DETAIL -- =-�y;�r ssa a �,\ -�__7_- 1 --- r ear NOT TO SCALE $SIa�,I��a..W..DRAR,' LONE CT. CUL-DE-SAC PLAN 1\ ALL TYPICAL STREET CROSS-SECTION ma PPERWA1LaT�HD STORMWATER MANAGEMENT 1I , g NOT TO SCALE FOR CONSTCM DR,RBBLE DR.,SEATHWAITE N MA �„ �_; .M DETAILS SHEET__ 1 ! TWICKENHAM CT:.CAMBECX WAY.EASDALE CT..LONE CT. t� - WYRE CT..KEEKLE LN..BARBONDECK LN..&ESIHNNIE DR. .Y � �,� ' S "m--- M` WOE". �E "" BSI CALDER CT.oT C�L�DEE-SAC PLAN NOT TO SCALE a APR 2 .4� xm.m.. ••1...R e W. OPIUM. . __ p��d ,( 410-03A1 SW D-1 3 BY: Wet Detention Basin Calculations (Previously Approved under SW8 060354 — No Changes are proposed with this submittal) IEGE/ViEj) APR 2 5 2163 ii BY: WET DETENTION BASIN DATA SKEET hAWKESWATER-PHASE I POND #I - TOTAL DRAINAGE AREA (Ad) = 23.62 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: 6. 19 ACRES (6O lots @ 4500sf/lot) ROADS: 2.26 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 8.45 ACRES PERCENT IMPERVIOUS (I): = Ad/Ai = 35.77% (SAY36.00%) POND # I SHALL BE 6.0' DEEP AND DESIGNED TO REMOVE 90% T55. 5A/DA= I .9000% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ.= 0.44878 AC. = 19549 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. I 4.0)= 238 13 SF I SA PROV'D= 23813 > 19549 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009"(I) Rv= 0.37193 VOLUME= I "'Rv'Ad = 0.73208 AC-FT = 3 1890 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL FI SA (SF) VOL (CF) VOL. OF) 14 23513 0 0 APR 2 5 Ka 15 25741 24777 24777 6 27737 26739 51516 BY: i 7 2,9780 28763 50280 , nATA c-h__T PAGE J- _ D_..="r13`R.. 2005 SET TEMP. POOL ELEVATION: REQ'D EL.= 15.26599 4—SAY 15.40 - VOL. PROV'D = 35473 CF VOL. PROV'D= 35473 > 31890 =VOL. REQ'D OK FOREDAY SIZING: SEE CALCULATIONS FOR WEST/EAST INLETS ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0. 18454G CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.0738 18 CFS (FOR 5 DAY DRAWDOWN) SELECT A 3" CIRCULAR ORIFICE, EL. 14.0' (PERM. POOL EL.) Q PROV'D= Cd"A.(2gh)" 1/2 WHERE: Cd= 0.G A= 0.04908 SF g= 32.2 FPS/5 h= AVE. HEAD =( I .40' - (0.5)(3"/12))/; = 0.G375 Q PROV'D= O. 188G86 Q2> 0. 188G86 >Q5 OK L DRAWDOWN TIME: TIME = VOLUME = 2.0 DAYS Q PROV'D "i EL,'ELvi.E..:;..) APR 2 5 27113 BY: 5CE- '-=?. 7005 WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE I POND #1 - WEST INLET DRAINAGE AREA (Ad) = 12.00 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: 3.30 ACRES (32 SF LOTS X 4500SF/LOT) ROADS: I . I ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 4.48 ACRES PERCENT IMPERVIOUS (I): I Ad/Ai = 37.33% (SAY 37.00%) POND # I SHALL BE G.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= 1 .9500% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ,= 0.234 AC. = 10I 93 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. I 4.0)= 12942 SF SA PROV'D= 12942 > 10193 =SA REQ'D OK ti MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): SEE CALCULATIONS FOR TOTAL POND FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL EI SA (SF) VOL. (CF) VOL. (CF) FECESVED 8 6 13 5 0 0 '" 's 9 6829 6482 G482 •• AM 2 5 23;3 ` 10 7557 7193 13675Y, Ii 8317 7937 216i2 12 91 12 8715 30327 41- (VOL. REQT MET!) 13 9940 9526 39852 17942 , 1441 51293 F•v` D. 2 DATA �_f- .. Y. 3 00 REQ'D VOLUME = 20% TOTAL = 6065 CF CHECK FOREBAY VOLUME: INCREM. TOTAL a- SA (5F) VOL. (CF) VOL. (CF) 8 358 0 0 9 627 493 493 10 968 798 1290 II 1381 1175 2465 I2 I866 1624 4089 13 2424 2145 623.4 4- (VOL. REQT MET!) PROV'D VOLUME = 6234 CF (3' DEEP FOREBAY) VOL. PROV'D= 6234 = 6065 =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS 5EE CALCULATIONS FOR TOTAL POND gnii 2 5 23 • BY: :; -- � _ OF 2 I .v_ _ •J WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE I POND #I - SOUTH INLET DRAINAGE AREA (Ad) = I I .6 I ACRES IMPERVIOUS AREA (Ai): BUILDINGS: 2.89 ACRES (28 LOTS @ 45005F/LOT) ROADS: 1 .08 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 3.97 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 34. 19% (5AY34.00%) POND #1 SHALL BE 6.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= I .8000% REQUIRED SURFACE AREA AT PERMANENT POOL: SAKEQ.= 0.20898 AC. = 9I03 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. I 4.0)= 1087 I SF 5A PROV'D= 1057 I > 9 103 =5A REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): SEE CALCULATIONS FOR TOTAL POND FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL Et- SA (SF) VOL. (CF) VOL. (CF) C iE S E_) 8 4417 0 0 Q � 2 � � 9 5060 4738 4738 10 5742 5401 10139 BY; G459 G101 16240 I2 7209 G834 23074 .- (VOL. REQ'T MET!) 13 7993 7601 30676 4 I0871 9432 40I08 POND.42 DATA S1-15_I 1 OF 2 A`4 ;A. Y. 200E REQ'D VOLUME = 20% TOTAL = 4615 CF CHECK FOREBAY VOLUME: INCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 8 240 0 0 9 465 352 352 10 758 61I 964 II 1121 939 1903 12 1555 1338 3241 13 2061 1808 5049 4— (VOL. REQ'T MET!) PROV'D VOLUME = 5049 CF (3' DEEP FOREDAY) VOL. PROV'D= 5049 = 46I 5 =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS SEE CALCULATIONS FOR TOTAL POND nEcETIVEu i:APR25 p . 2C3 FOND4i2 DATA 5�c=— ✓ice_' ?AG_ Th- 2 WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE I POND #2 - TOTAL DRAINAGE AREA (Ad) = 14.65 ACRES IMPERVIOUS AREA (AI): BUILDINGS: 3.82 ACRES (37 SF LOTS X 4500SF/LOT) ROADS: I .38 ACRES SIDEWALKS: 0.00 ACRES OFF-5ITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 5.20 ACRES PERCENT IMPERVIOUS (I): I = Ad/AI = 35.497o (5AY35.00%) POND#! SHALL BE 4.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= 3. I000% REQUIRED SURFACE AREA AT PERMANENT POOL: SAKEQ.= 0.454I5 AC. = 19783 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 17.0)= 21561 SF 5A PROV'D= 2 156I > 19783 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009"(I) Rv= 0.3G94I VOLUME= I ""Rv"Ad = 0.45099 AC-FT = 19645 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL FI SA (SF) VOL. (CF) VOL. (CG) 17 21561 0 0 18 23708 22635 22635 APR Z 5 233 19 26267 24987 47622 20 28908 27587 75209 BY' TOTAL PAGE 1 PH I -POND-2 SET TEMP. POOL ELEVATION: REQ'D EL.= 17.86792 4—SAY 17.90 VOL. PROV'D = 20371 CF VOL. PROV'D= 2037 I > I9645 =VOL. REQ'D OK ti FOREBAY SIZING: SEE CALCULATIONS FOR NORTH/WEST INLETS ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0. 113687 CFS (FOR 2 DAY DRAWDOWN) Q5= 0.045475 CFS (FOR 5 DAY DRAWDOWN) SELECT A 2" CIRCULAR ORIFICE, EL. I 7.0' (PERM. POOL EL.) Q PROV'D= Cd*A*(2gh) . 1/2 WHERE: Cd= 0.6 A= 0.0218 SF 9= 32.2 FP5/5 h= AVE. HEAD =(0.90' - (0.5)(2"/12))/; = 0.40533 Q PROV'D= 0.067074 Q2> O.0G7074 >Q5 OK ti DRAWDOWN TIME: TIME = VOLUME = 3.38987 DAYS Q PROV'D i APR 2 5 2::3 11,,,i 1 i EgY BY: TOTAL PAGE 2 Ph I-POND-2 WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE I POND #2 - NORTH INLET DRAINAGE AREA (Ad) = 8.04 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: I .9 I ACRES (I 8.5 SF LOTS X 4500SF/LOT) ROADS: 0.79 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 2.70 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 33.58% (SAY 34.00%) POND #2 SHALL BE 4.0' DEEP AND DESIGNED TO REMOVE 90% TS5. SA/DA= 3.0200% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ.= 0.242808 AC. = 10577 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 17.0)= 10763 SF SA PROV'D= 10763 > 10577 =SA REQ'D OK ti MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): SEE CALCULATIONS FOR TOTAL POND FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) I3 6143 0 0 14 G753 6448 6448 15 7408 7080 13528 4- (VQL,,,ZE T! 6 81i6 7762 21290 11 17 I0763 9440 30729 ^� �-R 225 2ep3 BY: • POND#2 DATA SHEET PAGE I OP 2 JANUARY, 2006 REQ'D VOLUME = 20% TOTAL = 270G CF ChECK FOREBAY VOLUME: INCREM. TOTAL EL. SA (SF) VOL. (CF) VOL. (CF) 13 442 0 0 I4 749 595 595 15 II29 939 I535 16 1 577 1353 2888 4-- (VOL. REQT MET)) PROV'D VOLUME = 2888 CF (3' DEEP FOREBAY) VOL. PROV'D= 2888 = 270G =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS SEE CALCULATIONS FOR TOTAL POND ilECERrEp APR 2 5 2(T3 BY: POND#2 DATA SKEET PAGE 2 OF 2 JANUARY, 200G WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE 1 POND #2 - WEST INLET DRAINAGE AREA (Ad) = 6.6 I ACRES IMPERVIOUS AREA (Ai): BUILDINGS: I .91 ACRES (18.5 SF LOTS X 45005F/LOT) ROADS: 0.59 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 2.50 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 37.82% (5AY36.00%) POND #2 SHALL BE 4.0' DEEP AND DESIGNED TO REMOVE 90% TSS. SA/DA= 3.3400% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ.= 0.220774 AC. = 9617 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 17.0)= 10798 SF SA PROV'D= 10798 > 96 17 =5A REQ'D OK ti MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): SEE CALCULATIONS FOR TOTAL POND FOREBAY SIZING: PERMANENT POOL VOLUME: I NCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 13 4140 0 0 14 5012 457G 4576 15 5954 5483 10059 a-- (V47EQ'T MET!2, 1 G G9G5 6459 165 19 = .t ' 7` 17 I0798 888 ! 25400 h25r3 BY: POND#2 DATA SHEET PAGE I OP 2 JANUARY, 2006 REQ'D VOLUME = 20% TOTAL = 201 2 CF ChECK FOREBAY VOLUME: INCREM. TOTAL 5A (5F) VOL. (CF) VOL. (CF) 13 272 0 0 14 524 398 398 15 852 G58 I08G I G 1 253 1052 2 138 4-- (VOL REQ'T MET!) PROV'D VOLUME = 2 138 Cr (3' DEEP FOREDAY) VOL. PROV'D= 2 138 201 2 =VOL. REQ'D OK ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS SEE CALCULATIONS FOR TOTAL POND !.::r 1 b POND#2 DATA SHEET AP s> PAGE 2 OP 2 JANUARY, 2006 BY: WET DETENTION BASIN DATA SHEET HAWKESWATER-PHASE I POND #3 DRAINAGE AREA (Ad) = 28. 17 ACRES IMPERVIOUS AREA (Al): BUILDINGS: 9. 19 ACRES (89 LOTS@45005F) ROADS: 2.49 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: I I .65 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 4 I .46% (5A)'4/%) POND#3 SHALL BE 7.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= I .4500% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ.= 0.408465 AC. = 17793 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 14)= 21892.5 5P SA PROV'D= 2 1892.52 > 17793 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009*(1) Rv= 0.42314 VOLUME= I ""Rv'Ad = 0.99332 AC-FT = 43269. 1 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL FECEIVE;`' F SA (SF) VOL. (Cr) VOL. (Of) 14 21893 0 0 APR Z 5 23 15 23806 22849.5 22849.5 I 25780 24793.4 47642.9 BY 17 27815 26797.6 74440.5 POND#I DATA SHEET PAGE I OF 3 APRIL, 2006 SET TEMP. POOL ELEVATION: REQ'D EL.= 15.82359 4--SAY 15.9 VOL. PROV'D = 45 164 CF VOL. PROV'D= 45I 63.55 > 43269. 1 =VOL. REQ'D OK FOREBAY SIZING: PERMANENT POOL VOLUME: I N CREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 7 6983 0 0 8 831G 7650 7650 9 9714 9015 I6665 I0 I 1177 10446 27111 II I2705 11941 39052 12 14296 13501 52553 4— (VOL REQ'T METI) 13 15948 15122 67675 14 21893 18920 86596 REQ'D VOLUME = 20% TOTAL = 105 I I CF CHECK FOREBAY VOLUME: INCREM. TOTAL J.,. SA (SF) VOL. (CF) VOL. (CF) 10 2509 0 0 II 3147 2828 2828 I2 3855 3501 6328 13 4634 4244 10573 PROV'D VOLUME = 10573 CF 3' DEEP FOREBAY) VOL. PROV'D= 10573 10511 =VOL. REQ'D OK -SVEU POND#I DATA SHEET ifPAGE 2 OP 3 s; APR 2 5 E3 APRIL, 200G RY. ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.2504 CFS (FOR 2 DAY DRAWDOWN) Q5= 0. 1001 G CF5 (FOR 5 DAY DRAWDOWN) SELECT A 3" CIRCULAR ORIFICE, EL. 50.0' (PERM. POOL EL.) Q PROV'D= Cd`A'(2gh) " 1/2 WHERE: Cd= 0.G A= 0.04909 SF g= 32.2 FP5/5 h= AVE. HEAD =( I .9' - (0.5)(3"/12))/2 = 0.8875 Q PROV'D= 0.222GG I Q2> 0.222661 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 2.249I 5 DAYS Q PROV'D • APR 25 2 3 nt POND#I DATA SHEET PAGE 3 OF 3 APRIL, 2006 WET DETENTION BASIN DATA SHEET HAWKESWATER PHASE 3 POND # I DRAINAGE AREA (Ad) = 5.32 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: I .22 ACRES ROADS: 1 .22 ACRES SIDEWALKS: 0.00 ACRES OFF-51TE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 2.44 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 45.86% (5A)"4E%) POND #I SHALL BE 7.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= I .7000% REQUIRED SURFACE AREA AT PERMANENT POOL: SARffQ.= 0.09044 AC. = 3940 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 12)= 8379 SF 4 ` SA PROV'D= 8379 > 3940 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.0094(I) Rv= 0.464 VOLUME= I "'Rv'Ad = 0.20571 AC-FT 8961 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: I N CREIVI. TOTAL SA (SF) VOL. (Cr) VOL. (CF) nEC E 1VE 71 2 8379 0 0 1 3 9063 872 I 872 I 11 APR 2 5 2M3 4 9 748 9406 18 126.5 BY: ' 5 I1357 ; 0507.5 28r94 Page 1 Ph3-Pond1 SET TEMP. POOL ELEVATION: REQ'D EL.= 13.02547 +—SAY 13. 1 VOL. PROV'D = 9GG2 CF VOL. PROV'D= 9GG2 > 89G I =VOL. REQ'D OK FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL EL. SA (5F) VOL. (CF) VOL. (CF) 5 1017 0 0 6 I307 I162 IIG2 7 I407 1357 25I9 8 2273 1840 4359 9 3 I I 7 2695 7054 I U 3938 3528 10582 '4-- (VOL REQT MET!) II 4835 4387 14968 12 8379 6607 21575 REQ'D VOLUME = 20% TOTAL = 21 1 6 CF CHECK FOREBAY VOLUME: INCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 8 301 0 0 9 549 425 425 10 835 G92 1117 11 128G 1061 2178 a— (VOL REQ'T MET!) 12 I8G3 1575 3752 .r APR 25 203 PROV'D VOLUME = 2 178 CF 4.0' DEEP FOREBAY) BY: VOL. PROV'D= 2178 --= 21 I G =VOL. REQ'D OK Page 2 Ph3-Pond1 ORIFICE SIZING: KEQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.05 1855 CFS (FOR 2 DAY DRAWDOWN) Q5= 0.020742 CFS (FOR 5 DAY DRAWDOWN) SELECT A I - 1/2" CIRCULAR ORIFICE, EL. ' 2.0' (PERM. POOL EL.) Q PROV'D= Cd*A*(2gh) ^ 1/2 WHERE: Cd= O. A= 0.01227 SF g= 32.2 FP5/5 h= AVE. HEAD =( I . I ' - (0.5) I .5"/I 2))/. = 0.51875 Q PROV'D= 0.042552 Q2> 0.042552 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 2.437 DAYS Q PROV'D BY: Page 3 Ph3-Pondl WET DETENTION BASIN DATA SHEET DATE:. :: 8/.1/08 DESIGN CALCULATIONS FOR PROJECT NO..: .4 I O-03A I SW HAWKESWATER AT PIE RIVER- PHASE-3, POND#2 DESIGNED BY: M. TACKETT DRAINAGE AREA (Ad) = I.r094, 198 SQ. FT 25. 1.2 ACRES IMPERVIOUS AR.EA (AI): BUILDINGS: 1.03,500 SQ. FT :2.38 ACRES ROADS: • 39,62I SQ. FT. 0.91 ACRES 'SIDEWALKS: 3,547 SQ. FT 0.08. ACRES AM�NITY: 0 SQ. FT .. 0.00 ACRES CONTINGENCY: . 509,848 SQ. FT 1 I.7.0.. ACRES TOTAL: 656,516 SQ. FT 15.07 ACRES PERCENT IMPERVIOUS (I): I =.Ad/AI = 60.006% USE : 6Q% CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL: POND#2 SHALL HAVE A DEPTH OF 7 FEET, DESIGNED TO REMOVE 90% T55, INTERPOLATION OF TABLE 10-3 IN. NCDENR STORMWATER:BMP MANUAL . % IMP. DEPTH .(FT) 6.5 .7.00 . 7.5 50 . 2.30 1 .90 1 .50 60 . 2.90 2,40 1 .90 70 3.40 2.90 2.30 SA/DA= 2.40% SARLa.= 26.7261 SF. 0.60 AC. SURFACE AREA PROVIDED AT PERMANENT POOL = 26,592 SF Elevatg5n = 13.0 ft. M.S.L. A PROV'D=: 26,592. > 26,26 i = .SA REQD • 5cr E. 'r: '�`.)l?s t POND#1 . IVFDATA SHEET BY: PAGE I OF 4 P:44 I I O-03A I 5W -aIc51POND2Pt13-080 108 APR 2 5 2013 IIII MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+O.009"(I) (Rv=0.05+0.009'"60.00) Rv= 0.589998 VOLUME= 1°°Rv`Ad = 1 .2350293 AC-FT 53,798 PT^3 VOLUME PROVIDED AT TEMPORARY-POOL: INCREM. TOTAL SA (SF) VOL. (CP) VOL. (Cr) 13 2G,592 0 0 14 30,019 28,306 28,30G 15 33,512 G0, 104 G0, 104 6 37,069 G7,088 95,394 SET TEMP. POOL ELEVATION: REQ'D EL.= 14.90 USE EL.= 15.00 VOL. PROVD = 60, 104 CF VOL. PROV'D= 60, 104 > 53,798 = VOL. REQ'D OK SE.P a8AO POND#1 EC WET) DATA 511EET PAGE 2 OF 4 P:W 1 OW 10-03A 1 5W CaIcs1POND2P113-080108 11 APR 2 5 3 BY: FORESAY SIZING: PERMANENT POOL VOLUME: 1NCREM. TOTAL E1._ SA (Sr) VOL. (CF) VOL. (CF1 6 6,779 0 0 7 7,966 7,373 7,373 8 9,330 8,G48 I G,021 9 10,798 I0,064 2G,085 10 12,347 11 ,573 37,G57 11 13,984 13, 166 50,823 f 2 15,718 14,851 65,674 13 26,592 21 , 155 86,829 4-- (5A REQT MET!) REQ'D VOLUME = 20% TOTAL = 17,3G6 CF CHECK FOREBAY VOLUME: INCREM. TOTAL Fk 5A (SF) VOL. (CF) VOL. (CF) G G02 0 0 7 966 784 784 8 1 ,405 1 , 186 1 ,970 9 1 ,920 I ,663 3,632 10 2,512 2,216 5,848 11 3, 179 2,846 8,G94 12 3,921 3,550 12,244 13 4,739 4,330 1 G,574 1-- (VOL REQ'T MET]) PROV'D VOLUME = 1 G,574 CF Q 13' VOL. PROV'D= 16,574 -= 17,36G = VOL. REQ'D OK . RECEIVED r,nG I ;cv Ei B n uuc By; POND#1 DATA 511EET CojE E PAGE 3 Of 4 P:1410141O-03AI5W1Cakcs1POND2PI-13-O80108 q '+ AFR 5 La BY: ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS NOTE: ORIFICE SIZED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAYS 02= 0.34782 CFS (FOR 2 DAY DRAWDOWN) Q5= 0. 13913 CFS (FOR 5 DAY DRAWDOWN) ORIFICE EL.= 13.00 (PERM. POOL EL.) TEMP. POOL EL. = 15.00 (OUTLET EL.) ORIFICE DIAMETER = 3.0 IN. Q PROV'D= Cd*A*(2gh)^ 1/2 WHERE: Cd= 0.6 A= 0.04909 SF g= 32.2 FP5/S h= (TEMP POOL-NORMAL POOL)/3 = 0.66667 Q PROV'D= 0. 19295 Q2> O. I9295 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 3.60 DAYS Q PROV'D SE? 01310 POND#I ; -- y _�`a yz/]��---^-) DATA SHEETF.M CP : ilk h, PAGE 4 OF 4 PM I O14I O-03A'S1MCalcs1POIVD2P113-O80 108 ,�£ It APR 25 ti,:3 BY: WET DETENTION BASIN DATA SHEET HAWKESWATER PHASE 3 POND #3 DRAINAGE AREA (Ad) = 0.97 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: 0.24 ACRES ROADS: 0.31 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 0.55 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 5 6.70% (SAY'57%) POND#3 SHALL 5E 4.0' DEEP AND DESIGNED TO REMOVE 90% T5S. SA/DA= 5.0000% REQUIRED SURFACE AREA AT PERMANENT POOL: 5AREQ,= 0.0485 AC. = 2113 5F SURFACE AREA PROVIDED AT PERMANENT POOL (EL. 10)= 4026 5F SA PROV'D= 4026 > 2 113 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.009"(I) Rv= 0.563 VOLUME= I "`Rv"Ad = 0.0455 I AC-FT 1982 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL F! 5A (5F) VOL. (CF) VOL. (CF) _ 10 4026 0 0 ��- y. II 473I 4379 4379 12 56 18 5 175 9553 4 APR 2 5 2313 BY: Pagel Ph3-Pond3 5ET TEMP. POOL ELEVATION: REQ'D EL.= i 0.45275 f--SAY 10.5 VOL. PROV'D = 4379 Cr VOL. PROV'D= 4379 > 1982 =VOL. REQ'D OK FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL EL. SA (Sr) VOL. (CF) VOL. (Cr) 6 265 0 0 7 599 432 432 8 1018 809 124I 9 1596 1307 2548 f-- (VOL REQ'T MET!) I0 4026 2811 5359 REQ'D VOLUME = 20% TOTAL = 5 I 0 Cr CHECK FOREBAY VOLUME: INCREM. TOTAL J_ SA (SF) VOL. (Cr) VOL. (CF) 7 14 0 0 8 I08 6I 61 9 276 I92 253 I 0 5 19 398 651 I- (VOL REQ'T MET!) II APR 2 5 2ti 3 PROV'D VOLUME = G5 I Cr (3' DEEP FOREBAY) BY: VOL. PROV'D= 65 I 5 I =VOL. REQ'D OK Page 2 Ph3-Pond3 ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.0 11472 CFS (FOR 2 DAY DRAWDOWN) Q5= 0.004589 CFS (FOR 5 DAY DRAWDOWN) SELECT A I .0" CIRCULAR ORIFICE, EL. 10' (PERM. POOL EL.) Q PROV'D= Cd'Ae(2gh)^ 1/2 WHERE: Cd= 0.G A= 0.0055 SF g= 32.2 FP5/S h= AVE. HEAD =(I .0' - (0.5)( I .0"/12)), = 0.4792 Q FROV'D= 0.0I 8332 Q2> 0.015332 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 1 .251 58 DAYS Q PROV'D PLECE:VED 11�YK APR 25 233 BY:, Page 3 Ph3-Pond3 WET DETENTION BASIN DATA SKEET HAWKESWATER PHASE 3 POND #4 DRAINAGE AREA (Ad) = 5.68 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: I .40 ACRES ROADS: I .63 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 3.03 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 53.35% (SAY54%) POND#4 SHALL BE 4.0' DEEP AND DESIGNED TO REMOVE 90% T55. SA/DA= 4.7000% REQUIRED SURFACE AREA AT PERMANENT POOL: SAREQ.= 0.26696 AC. = I I629 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL.B)= 23433 SF SA PROV'D= 23433 > 11629 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SCHUELER): Rv=0.05+0.0094(I) Rv= 0.536 VOLUME= I ""Rv'Ad = 0.2537 I AC-FT = 1 105 I .5 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL E!.. SA (SF) VOL. (CF) VOL. (CF) t r r,,,,�- 8 23433 0 0 � ' 9 2542 I 24427 24427 ' APR 5 � 3 10 27466 26443.5 50870.5 BY: Page 1 Ph3-Pond4 SET TEMP POOL ELEVATION: REQ'D EL.= 8.45 2428 4i--SAY 8.5 VOL. PROV'D = 24427 CF VOL. PROV'D= 24427 > 1105I .5 =VOL. REQ'D OK FOREDAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL 5A (5P) VOL. (Cr) VOL. (CP) 4 11285 0 0 5 13785 12535 12535 1 547 I 14G28 27 163 4— (VOL REQT MET!) 7 I7214 IG343 43506 8 23433 20324 63829 REQ'D VOLUME = 20% TOTAL = 5433 CP CHECK POREBAY VOLUME: INCREM. TOTAL EJ� 5A (5P) VOL. (CP) VOL. (CP) 5 2240 0 0 6 2932 2586 2586 7 3695 3314 5900 1— (VOL REQT MET!) 8 457G 4I3G 10035 PROV'D VOLUME = 5900 CP (3' DEEP FOREBAY) VOL. PROV'D= 5900 = 5433 =VOL. REQ'D OK C E r i Page 2 Ph3-Pond4 ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.063555 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.025582 CFS (FOR 5 DAY DRAWDOWN) SELECT A I .5" CIRCULAR ORIFICE, EL. 8.0' (PERM. POOL EL.) Q PROV'D= Cd*A*(2gh) ^ 1/2 WHERE: Cd= 0.6 A= 0.0123 SF 32.2 FPS/5 h= AVE. HEAD =(0.5' - (0.5)( I .5"/I 2)), = 0.2188 Q PROV'D= 0.027703 Q2> 0.027703 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 4.G 1725 DAYS Q PROVE) piECE,EVE", APR 2 5 23 BY Page 3 Ph3-Pond4 WET DETENTION BASIN DATA SHEET hAWKESWATER PHASE 3 POND #5• DRAINAGE AREA (Ad) = 9.08 ACRES IMPERVIOUS AREA (At): BUILDINGS: 2.23 ACRES ROADS: 2.53 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 4.76 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai = 52.42% (5AY53%) POND#5 SHALL BE 7.0' DEEP AND DESIGNED TO REMOVE 90% TSS. SA/DA= 2. 1000% REQUIRED SURFACE AREA AT PERMANENT POOL: 5AREQ.= 0. 19068 AC. = 8306 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL. I 3)= 10285 SF SA PROV'D= 10285 > 8306 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE METHOD BY TOM SChUELER): Rv=0.05+0.009"(I) Rv= 0.527 VOLUME= I "*Rv`Ad = 0.3987G AC-FT = 17370. 1 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL EL. SA (SF) VOL. (Cr) VOL. (CF) I3 I0285 0 0 ECEVVE71 14 11485 I0885 I0885 15 12732 12 108.5 22993.5 /1APR 2 5 203 16 14079 13405.5 36399 BY:_ Page 1 Ph3-Pond5 SET TEMP. POOL ELEVATION: REQ'D EL.= 14.59579 4--SAY 14.6 VOL. PROV'D = 22994 CF VOL. PROV'D= 22993.5 > 17370. 1 =VOL. REQ'D OK FOREBAY SIZING: PERMANENT POOL VOLUME: 1NCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 3461 0 0 7 3938 3700 3700 8 4443 4191 7890 9 4977 4710 12600 10 5540 5259 17859 I I 6 13 I 583G 23694 i-- (VOL REQT MET!) 12 6752 6442 30136 13 10285 8519 35654 REQ'D VOLUME = 20% TOTAL = 4739 CF CHECK FOREBAY VOLUME: INCREM. TOTAL SA (SF) VOL. (CF) VOL. (CF) 9 584 0 0 10 880 732 732 II I235 1058 1790 12 1651 1443 3233 13 2 120 1586 5 I 1 8 '4-- (VOL REQT MET!) PROV'D VOLUME = 5 118 CF (4' DEEP FOREBAY) VOL. PROV'D= 51 18 4739 =VOL. REQ'D OK 9V Page 2 1 APR 2 5 203 Ph3-Pond5 ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS 02= 0. 100522 CF5 (FOR 2 DAY DRAWDOWN) Q5= 0.040209 CFS (FOR 5 DAY DRAWDOWN) SELECT A I .5" CIRCULAR ORIFICE, EL. I 3.0' (PERM. POOL EL.) Q PROV'D= Cd*A*(2gh) ^ 1/2 WHERE: Cd= 0.6 A= 0.0I 23 SF g= 32.2 FPS/5 h= AVE. HEAD =( I .6' - (0.5)(1 .5"/1 2)), = 0.7688 Q PROV'D= 0.05 1929 Q2> 0.05I929 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 3.871 54 DAYS Q PROV'D APR 2 5 2 r3 . Page 3 Ph3-Pond5 WET DETENTION BASIN DATA SHEET HAWKESWATER PHASE 3 POND #6 DRAINAGE AREA (Ad) = 9.33 ACRES IMPERVIOUS AREA (Ai): BUILDINGS: I .50 ACRES ROADS: I .35 ACRES SIDEWALKS: 0.00 ACRES OFF-SITE 0.00 ACRES CONTINGENCY: 0.00 ACRES TOTAL: 2.55 ACRES PERCENT IMPERVIOUS (I): = Ad/Ai = 30.55% (SA Y3/%) POND#6 SHALL BE 5.0' DEEP AND DESIGNED TO REMOVE 907o T55. SA/DA= 2.2600% REQUIRED SURFACE AREA AT PERMANENT POOL: SARffQ.= 0.2I0858 AC. = 9165 SF SURFACE AREA PROVIDED AT PERMANENT POOL (EL.6)= 10116 SF SA PROV'D= 1 01 16 > 9155 =SA REQ'D OK MINIMUM REQUIRED VOLUME (SIMPLE .METHOD BY TOM SCHUELER): Rv=0.05+0.009*(I) Rv= 0.329 VOLUME= I "Rv"Ad = 0.2558 AC-FT = I 1 142.5 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL L... SA. (SF) VOL. (Cr) VOL. (Cr) 6 101i6 0 0 ;VET 7 1 1 335 10725.5 10725.5 8 126 10 11972.5 22698 2 5 2 3 Page 1 Ph3-Pond6 SET TEMP. POOL ELEVATION REQ'D EL.= 7.034833 i--SAY 7.0 VOL. PROV'D = 22698 CF VOL. PROV'D= 22698 > 11142.5 =VOL. REQ'D OK FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM. TOTAL F�(y SA (SF) VOL. (Cr) VOL. (Cr) I 290G 0 0 2 3710 3308 3308 3 4571 4141 7449 4 5488 5030 12478 5 6462 5975 18453 101 I G 8289 26742 i— (VOL REQ'T MET!) REQ'D VOLUME = 20% TOTAL = 5348 Cr CHECK FOREBAY VOLUME: INCREM. TOTAL EL. SA (SF) VOL. (Cr) VOL. (Cr) 2 666 0 0 3 998 832 832 4 1405 1202 2034 5 1902 1654 3687 2456 2179 5866 II-- (VOL REQT MET!) PROV'D VOLUME = 5866 Cr (4' DEEP FOREBAY) VOL. PROV'D= 5866 —= 5348 =VOL. REQ'D OK Page 2 R APR 2 5 2 , Ph3-Pond6 I. ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS Q2= 0.064482 CFS (FOR 2 DAY DRAWDOWN) Q5= 0.025793 CFS (FOR 5 DAY DRAWDOWN) SELECT A I .5" CIRCULAR ORIFICE, EL. 6.0' (PERM. POOL EL.) Q PROV'D= Cd`A"(2gh)^ 1/2 WHERE: Cd= 0.6 A= 0.0123 SF g= 32.2 FPS/S h= AVE. HEAD =(I .0' - (0.5)( I .5"/1 2)), = 0.4688 Q PROV'D= 0.04055 Q2> 0.04055 >Q5 OK DRAWDOWN TIME: TIME = VOLUME = 3. 18037 DAYS Q PROV'D !' I : Qe rR 2 5 2'13 Page 3 Ph3-Pond6 WET DETENTION BASIN DATA SHEET . . .:DATE: 8/1/08 DESIGN CALCULATIONS•FOR :PROJECT:NO.: 4 I 0-03A 1 5W HAWKESWATER AT THE RIVER PHASE-3, POND#7 DESIGNED BY: M. TACKETT DRAINAGE AREA (Ad) = 192,971 SQ. FT 4.43 ACRES IMPERVIOUS AREA (Al): BUILDINGS: 58,054 SQ. FT. . 1 .33 ACRES ROADS: 29,06E . 5Q. FT 0..67 ACRES SIDEWALKS: 0 SQ. FT 0.00 ACRES AMENITY: 0 SQ. FT 0.00 ACRES CONTINGENCY: 0 SQ. FT .. 0.00 ACRES TOTAL: 57,120 SQ. FT 2.00 ACRES PERCENT IMPERVIOUS (I): I = Ad/Ai 45. 1 5% USE - 46% CALCULATE REQUIRED SURFACE AREA AT PERMANENT POOL: POND#7 SHALL HAVE AN DEPTH OF G FEET, DESIGNED TO REMOVE 90% TSS. INTERPOLATION OF TABLE 10-3 IN NCDENR.STORMWATER 5MP MANUAL IMP. DEPTH (FT)% .. . 4.5 , 5.00 . 5.5 40 .3. 10 2.80 2.50 46 3.58 3.22 2.86 50 3.90 3.50 3. 10 SA/DA= 3.22% SAREQ.= 6.,214 SF. = 0. 14 AC SURFACE,AREA PROVIDED AT PERMANENT POOL =. 7,486 5F Elevation: = 6.0 ft. M.S.L. 5A PROV'D= 7:486 > G,214 = SA RFQ'D. OK RECEIVED.. SE). 0 8 agO$. POND #1 DATA SHEET PM!Oh4I O-03A!SW1CaIcs\POND7Ph13-080 i 08 BY:- 1 . APR 2 5 2 a3 BY:� MINIMUM REQUIRED VOLUME (SIMPLE METHOD BYTOM SCI1UELER): Rv=0.05+0.009*(I) (Rv=0.05+0.009*45. 1 5) Rv= 0.4G4 VOLUME= I "*Rv*Ad = 0. 171 2933 AC-FT 7,4G2 FT^3 VOLUME PROVIDED AT TEMPORARY POOL: INCREM. TOTAL EL SA (SF) VOL. (CF) VOl . (CF) 7,48G 0 0 ti• 7 9,387 8,437 8,437 8 11 ,468 18,954 18,954 • SET TEMP. POOL ELEVATION: REQ'D EL.= G.90 USE EL.= G.90 VOL. PROV'D = 7,593 Cr VOL. PROV'D= 7,593 > 7,462 = VOL. REQ'D OK • RECEIVED SE? 0 8 2808 POND#1 _ ,,� - ,� DATA SKEET PAGE 20F4 • PM 10\4 I O-03A I SWWCalcs\POND7PFi3-O80/08 AP BY: FOREBAY SIZING: PERMANENT POOL VOLUME: INCREM, TOTAL ZL.. SA (Sr) VOL. (CF) VOL. (Cr) 0 127 0 0 1 358 243 243 2 698 528 771 3 1 ,528 1 , 113 1 ,884 4 2,37G 1 ,952 3,836 5 3,423 2,900 6,735 6 7,486 5,455 12, 190 4_ (SA REQT METI) REQ'D VOLUME = 20% TOTAL = 2,438 Cr CHECK FOREBAY VOLUME: INCREM. TOTAL EL SA (Sr) VOL. (Cr) VOL. (Cr) 3 380 0 0 4 666 523 523 5 1 ,030 848 I ,371 G 1 ,477 1 ,254 2,625 i— (VOL REQ'T MET.) PROV'D VOLUME = 2,G25 Cr @ 6.00' 1 VOL. PROV'D= 2,625 —= 2,438 = VOL. REQ'D OK ` su, gbNut. 1ii \131:1„-------- -7--:— POND #1 . .:. .. DATA SHEET PAGE 3 OF 4 P:\4I014I 0-03A I SW'CaIcs1POIVD7PI-13-080I 08 ' ' APR 2 5 2113 s Dt BY. ORIFICE SIZING: REQ'D DRAWDOWN TIME = 2-5 DAYS NOTE: ORIFICE SIZED TO DRAWDOWN THE TEMPORARY POOL IN 2-5 DAYS 02= 0.04394 CFS (FOR 2 DAY DRAWDOWN) 05= 0.01758 CFS (FOR 5 DAY DRAWDOWN) ORIFICE EL.= G.00 (PERM. POOL EL.) TEMP. POOL EL. = 6.90 (OUTLET EL.) ORIFICE DIAMETER = 1 .50 IN. Q PROV'D= Cd*A*(2gh)^ 1/2 WhERE: Cd= 0.6 A= 0.01227 5F g= 32.2 FP5/S h= (TEMP POOL-NORMAL POOL)/3 = 0.30000 Q PROV'D= 0.0323G Q2> 0.03236 >Q5 OK DRAWDOWN TIME: • TIME = VOLUME = 2.72 DAYS Q PROV'D RECTE3D).\ SEV ti30t; BY� POND# DATA SHEET PAGE 4 OF 4 PM 1044 I0-03A I SW\Calc51120ND7PI'13-0801 OS _ MR 2 Y 6� L t SY: