Loading...
HomeMy WebLinkAboutSW6240102_Plansheet - Misc. Detail_20240820 ■ sl e BOLLARDS solutions civil engineering I land surveying SLOPE CONCRETE <� 409 Chicago Drive,Suite 112,Fayetteville,NC 28306 O office 1910-426-6777 fax 1910-426-5777 license number I C-2354 SIDEWALK AWAY cS'/ � www.4D site solutions.com FROM BUILDING �FG�F�� PARK NG SIGN ACCESSIBLEO O TREATED WOOD1"x6" CEDAR R 1/8" PER FOOT '9�� VERTICALS ON STANDARD PARKING 1:12 MAX 2"x4" NAILERS SPACE STRIPING SLOPE DUMPSTER DUMPSTER CARO �vl �i ?_p e /pr�.;•`9 `9 •Q SEA ' 4"x4" TREATED 02 4 - 4"x4" TREATED WOOD WD. POSTS IN_ POSTS @ 6'-0" OC MAX. I G I NE .•' SLOPE CONCRETE 1"x6" CEDAR OR TREATED N ��plll IIIIB�````` TT SIDEWALK AWAY WOOD VERTICAL BOARDS !, p Ic FROM BUILDING :12 MAX U O��v��7 �F�, 1/8" PER FOOT SLOPE F2T 2"x4" TREATED WOOD HORIZONTAL NAILERS POSTS FOREL REVISIONS GATE ACCESS AISLE SLOPE O �'�p2C' SIDEWALK CONC. FINISHED GRADE VARIES AWAY FROM HYDRAULIC GREASE BUILDING 1/8'I FITTING TO BE PER FOOT _ _ -, __ -_ _ ACCESSIBLE FOR MAINTENANCE 8"x8'x STL. GUSSET PLATE 7-1/4" O.D. HINGE 6" LONG (INSIDE1WELDOC�L3> ALL OC ALCORNERS AROUND 1"x6"xj" TO HINGE 1 11- 1 -1 & GATE 12" DIA. HOLE FILLED BOLLARD, _ -III II W/ CONCRETE PAINTED YELLOW �,I�I,�,�,�,-,�, 6" NOM. I.D. GATE POST GATE FRAME FILLED W/ CONCRETE & LK S ROUNDED TOP 3"x 7-1/4' O.D. TUBE COLLAR - WELD TO POST GRADE 2"x2"x J" STEEL TUBE GATE PROJECT NAME FRAME W/ WELDED JOINTS **ADD HEAVY DUTY CASTERS TO THE GATES 2 CANE BOLTS 1"x6" CEDAR OR TREATED WOOD RAEFORD VERTICAL BOARDS W/ I" MIN. GAP. NOTE: 12" DIA. HOLE FILLED SCREW TO FRAME W/ GALVANIZED 1. PAINT ALL GATE FRAMES AND PIPES W/ CONCRETE OR STAINLESS STL. SCREWS 2. ADD HEAVY DUTY CASTERS TO THE GATES VASS ROAD NTS NTS DOLLAR 1 HANDICAP RAMP 2 DUMPSTER ENCLOSURE GENERAL ® NOTES: ® 4.00'[1.22M] � 1.INSTALL SILT FENCE PER STD.SILT FENCE DETAIL. 4.00'[1.22M] 2.LOCATE REINFORCED OUTLET AT LOW POINTS OF SILT FENCE BARRIER. STEEL FENCE POST s.00'[2.44M] • • 3.PLACE RIP RAP WITH CARE.DO NOT TEAR SILT FENCE FABRIC. WIRE FENCE TRM INSTALLATION 8.00'[2144M] -I L z.a0'[0s1M] 2.00'[0.61M] HARDWARE CLOTH • MAINTENANCE NOTES: FILTER OF 1" DIAMETER 12 4.a0'[1.22M] a.00'[1.22M] WASHED STONE SITE & EROSION " 1.REMOVE THE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE • • • ADEQUATE VOLUME FOR THE NEXT RAIN AND TO REDUCE 3' FILTER FABRIC 0.7 STAPLES PER SQ.YD. 0 0... srAPLEs PER sQ.v . PRESSURE ON THE FENCE/OUTLET.TAKE CARE TO AVOID ON GROUND CONTROL 3 STAPLES PER SQ.M)) (0.8 STAPLES PER SQ.M) UNDERMINING THE FENCE DURING CLEANOUT.REMOVE& _ 6" REPLACE STONE AS NECESSARY AS IT BECOMES CLOGGED WITH 0,�� \� ® © ® © SEDIMENT. 2.REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT FILTER 6" OF UPPER EDGE OF DETAILS \�\ FILTER FABRIC IN TRENCH T- 2.00'[0.61M] L 1.50'[0.46M] 2.00'[0.61MI 3.00'[0.s1MI • • 1.50'10.46M) DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT o f O O a00'[1 zzM] • 3.00'[as1M] • 4.00'[1.22M] • • AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY SECTION VIEW L 2.00'[0.61M] • •� • 2.00'[0.61M] STABILIZED. . . .. . . . .. . . . . . . . 2.00[0.61 M] • �1 2.00'[0.61 M] W W W 41 • W v v W v • 4.00'[1.22M] • • 4.00'[1.22M] 3B ^ ^ W .W.W.. . . .�.W W • • • • TOP OF SILT FENCE �\ W 4.00'[1.22M] 4.00'[1.22M] • MUST BE AT LEAST 1' SILT FENCE • • • ABOVE THE TOP OF THE WASHED STONE 4' MIN. 1.3 STAPLES PER SQ.YD. 1.7 STAPLES PER SQ. YD. ------------------- --------------------- """"""""""""""""""""""" 1.3 STAPLES PER SQ.YD. 1.7 STAPLES PER SQ.YD. ------------------------------------ ----------------------- (1.5 STAPLES PER SQ.M) (2.0 STAPLES PER S0. M) CLIENT(1.5 STAPLES PER SO.M) (2.0 STAPLES PER SQ.M) ---------------------------'-------- -------------'--------------------- --------------------------""" r ---------------------- ^ ^ ^^ --------------- -------= ® 18" MINIMUM -------------------- -- ---------------------- I -------------------- -------------------------------- � L � EIGHT OF STONE \� H 1.50'0.46M 1.50'0.46M 5 3.00'[0.91 M] • [ ] 3.00'[0.91 M] • • [ ] 1.50'[0.46M] 1.50'[0.46M] - 3.00'0.91 M 3.00'0.91 M is � I I I I I I - I I - - I I I - -I - I 2.00'0.61M • • • • • • - I I I �I - I - I -I I I .. I 1 II I I �I I I ---""�"_"------_= 2.00'0.61 M - � I ICI I I -I l ] - -III-1 I -� ----------------------------- III _ -III III_ RHETSON ----------------------------------- ----------------------------- ------------------------------------ COMPANIES INC. 4.00'[1.22M] 1.00'[0.30M] • • • • • • • • • 4.00'[1.22M] 1.00'[0.30M] • • • 2.00'0s1M] BURY WIRE FENCE, [ 4.a0'[1.22M] • • • • • • • FILTER FABRIC • • • • III IIIAND HARDWARE • • FRONT VIEW • • • CLOTH IN TRENCH ------------------------------------- ------------------------------------------- STEEL FENCE POST 3.4 STAPLES PER SQ.YD. 3.6 STAPLES PER SQ.YD. SET MAX 2' APART (4.1 STAPLES PER SQ.M) (4.3 STAPLES PER SQ.M) 3.4 STAPLES PER SO.YD. 3.6 STAPLES PER SO.YD. NTS NTS MIN. 18" INTO SOLID NTS (4.1 STAPLES PER SO.M) (4.3 STAPLES PER SQ.M) GROUND 2075 Juniper Lake Road 4 STAPLE PATTERN FOR 4' ROLLS 5 STAPLE PATTERN FOR W ROLLS 6 SILT FENCE OUTLET West End, North Carolina27376 Phone: (910) 944-0881 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. GABION SPECIFICATIONS NOTE: WHEN USING CELL-0-SEED DO NOT SEED PREPARED AREA. CELL-O-SEED MUST BE INSTALLED WITH PAPER SIDE DOWN. 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" (15 CM) DEEP X 6" (15 CM) WIDE TRENCH MATERIAL WITH APPROXIMATELY 12" (30cm) OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH. ANCHOR THE GABIONS SHALL BE MADE OF WELDED STEEL WIRE MESH OF A i BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" (30 CM) APART IN THE BOTTOM OF THE TRENCH. NOMINAL SIZE OF 3"X 3".THE WELDED STEEL WIRE SHALL BE PVC PROJECT INFORMATION a BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" (30 CM) COATED IN ALL APPLICATIONS PERTAINING TO THE GABION. N PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF DIMENSIONS STAPLES/STAKES SPACED APPROXIMATELY 12" (30 CM) APART ACROSS THE WIDTH OF THE BLANKET. GABIONS SHALL BE BUILT IN VARIOUS LENGTHS AND HEIGHTS.THE 0 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE LENGTH SHALL BE IN MULTIPLES DESIGNED BY: SCOTT N AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES OF THE WIDTH.THE WIDTH SHALL NOT BE LESS THAN 3'.DIMENSIONS IN APPROPRIATE LOCATIONS AS SHOWN IN THE STAPLE PATTERN GUIDE. WHEN USING THE DOT SYSTEM' , STAPLES STAKES FOR HEIGHTS,WIDTHS AND LENGTHS ARE SUBJECT THE APPLICATION DRAWN BY: SCOTT °J / AND PURPOSE.IF THE LENGTH IS INCREASED BY A MULTIPLE OF THE SHOULD BE PLACED THROUGH EACH OF THE COLORED DOTS CORRESPONDING TO THE APPROPRIATE STAPLE PATTERN. WIDTH THE BASKET SHALL HAVE A WIRE WALL DIAPHRAGM SEWN INTO uj 0 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH APPROXIMATELY 2" - 5" (5 CM - 12.5 CM) OVERLAP DEPENDING ITS INTERIOR TO MAINTAIN THE SHAPE OF THE BASKET. CHECKED BY: CHRIS ON BLANKET TYPE. FABRICATION PROJECT NUMBER: 2019 • 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END SHINGLE STYLE WITH AN APPROXIMATE LIDS,GABIONS SHALL BE FABRICATED IN SUCH AWAY THAT THE BASE,SIDES, a' ( ) LIDS,ENDS,AND DIAPHRAGMS CAN BE ASSEMBLED AT THE a 3" (7.5 CM) OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" (30 CM) APART ACROSS ENTIRE CONSTRUCTION SITE INTO A RECTANGULAR UNIT OF THE SPECIFIED C(0 BLANKET WIDTH. SIZE.THE LID SHALL BE A SEPARATE UNIT OF THE SAME MESH AND rnuj NOTE: WIRE SPECIFICATIONS AS THE BODY.THE WELD SHEAR STRENGTH DRAWING SCALE *IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" (15 CM) MAY BE NECESSARY TO SHALL COMPLY WITH ASTM A-185-90A.WHERE THE LENGTH OF THE PROPERLY SECURE THE BLANKETS. GABION EXCEEDS ITS WIDTH,THE GABION SHALL BE DIVIDED BY N DIAPHRAGMS INTO CELLS OF EQUAL LENGTH.THE WIRE MESH SHALL (7 BE MADE OF GALVANIZED STEEL WIRE HAVING A MINIMUM DIAMETER NOT TO SCALE OF 3 MM. ALL WIRE USED IN THE FABRICATION OF THE GABION AND IN 'p THE WIRING OPERATIONS SHALL CONFORM TO US FEDERAL J SPECIFICATION QQ-W-461 H AND POSSESS A SOFT TENSILE STRENGTH WITH A CLASS 3 FINISH 5 ZINC COATING IN ACCORDANCE WITH ASTM A-641.PREFORMED STEEL WIRE SPIRAL BINDERS WITH A 3" PITCH ARE USED TO ASSEMBLE AND INTERCONNECT EMPTY GABIONS AND SHALL DATE RELEASED c MEET THE SAME SPECIFICATION AS THE WIRE USED IN THE MESH. MAINTENANCE: `m GABION INSPECTION AND MAINTENANCE AFTER ASSEMBLY,THE INDIVIDUAL GABION UNITS ARE o INTERCONNECTED USING THE SAME WIRE AND THE CONNECTION AUGUST 20, 2024 a GABIONS REQUIRE LITTLE MAINTENANCE.GABIONS CAN REMAIN AS SHOULD BE MADE NO LESS THAN EVERY 6"ALONG THE PERIMETER. 1.INSPECT THE EROSION CONTROL BLANKET ONCE A WEEK AND AFTER EVERY RAINFALL. 2.IMMEDIATELY REPAIR AND/OR REPLACE ANY DAMAGED BLANKET. PERMANENT STRUCTURES AFTER CONSTRUCTION PHASES ARE THEY SHOULD THEN FILLED WITH CLEAN,HARD STONE FROM 4"-8"IN COMPLETE. DIAMETER.THE LIDS ARE THEN CLOSED AND JOINED THE TOP 3.IF GROUND COVER IS NOT ESTABLISHED THROUGH THE BLANKET WITHIN 2 WEEKS,THE BLANKET � INSPECT REGULARLY AND AFTER STORM EVENTS EDGES OF THE INDIVIDUAL GABIONS AND DIAPHRAGMS. THE USE OF > SHOULD BE REMOVED AND THE AREA RESEEDED.AFTER RESEEDING,THE BLANKET SHOULD BE INSPECT FOR UNDERCUTTING AND OTHER SIGNS OF STABILITY EXPEDIENT CLIPS OR HOG RINGS FOR THIS PURPOSE IS NOT o REINSTALLED. • INSPECT WIRE BASKETS AND MATTRESSES FOR SIGNS OF PERMITTED. SHEET NUMBER DEGRADATION,RUST AND BREAKAGE. REPAIR OR REPLACE IMMEDIATELY TO MAINTAIN ENGINEERED IF PROPERLY CONSTRUCTED,THE LIDS AND PANELS SHOULD MEET PERFORMANCE STANDARDS. CLOSELY WITHOUT GAPS AND THAT THE TIES PROVIDE A TIGHT JOINT NTS AT ALL PANELS AND DIAPHRAGMS. NTS - 601 C (6 Q E O 3 EROSION CONTROL BLANKET INSTALLATION 7 GABION BAFFLE