Loading...
HomeMy WebLinkAboutSW6240102_Plansheet - Grading/Drainage Plan_20240820 ■ GROUND STABILIZATION CHART 4Dsite SITE AREA STABILIZATION STABILIZATION TIME N solutions s DESCRIPTION TIME FRAME FRAME EXCEPTIONS F� AS CONSTRUCTION SEQUENCE '� lL PERIMETER DIKES, C, 9 �0 SWALES, DITHCES 7 DAYS NONE �A���9 0O 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD civil engineering I land surveying AND SLOPES �& �2 PRE CONSTRUCTION CONFERENCE. 409 Chicago Drive,Suite 112,Fayetteville,NC 28306 HIGH QUALITY WATER 2�>>J�O 6Q 2. INSTALL STONE CONSTRUCTION ENTRANCE AND TEMPORARY SILT office1910-426-6777 fax1910-426-5777 license number I C-2354 7 DAYS NONE 83 FENCE WHERE SPECIFIED. www.4Dsitesotutions.com (HQW) ZONES FAfr Q 3. CONSTRUCT INFILTRATION BASIN. IF SLOPES ARE 10' OR n I 4. CLEAR AND GRUB THE SITE AS NEEDED. SLOPES STEEPER LESS IN LENGTH AND ARE 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO 7 DAYS THAN 3:1 NOT STEEPER THAN 2:1, I AREAS REMAIN GRASSED. SITE * 14 DAYS ARE ALLOWED 6. INSTALL UTILITIES. 7-DAYS FOR SLOPES 7. PERFORM FINE GRADING.SLO FLATTERES 3:1 OR 14 DAYS GREATER THAN N LENGTH FEET I I 9. PAVE8. LL AND ROADWAYSEANDE BASE PARKINGOURSE.LOTS. ♦�A` CARq����j� NONE N 10. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. `��OQ;•'FESS/ *•.• �� ALL OTHER AREAS v I 11. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE :�� �: i WITH SLOPES FLATTER 14 DAYS (EXCEPT FOR ALL TEMPORARY MEASURES. 'Q < THAN 4:1 PEHQW ZONES)RIMETERS D ���/L�/F /� , I / \ i 12. COMPLETE EXCAVATION OF THE INFILTRATION BASIN AND - SEA p� �/ /Q tic yo J I RESHAPE TO DESIGN DIMENSIONS. 02 4 o S9 ����� / / J I / 13. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS • �` z �p ST S / / OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING O ����VVVGI NE .•'� OfC \ I 1 TO THE NCDEQ EROSION CONTROL MANUAL. 'I���S'CO•••••8� `��♦♦ z NORTH TEMPORARY SKIMMER BASIN #1 J I Ug..2U„241 L=104', W=52', D=3' v SIDE SLOPES= 3:1 SILT FENCE VICINITY MAP TOP OF BASIN: : 232.' RIP RAP DISSIPATER OUTLET BOTTOM OF BASIN: 232.10' �� L=3' W=1'/3' 10' EMERGENCY SPILLWAY �, NOT TO SCALE 10' EMERGENCY SPILLWAY: 234.58' �., �� REVISIONS INVERT OF SKIMMER: 232.10' /7 DW-8" DMnx=12" TO BE SODDED. EROSION CONTROL NOTES �i2,, SIDE SLOPES OF BASIN ARE TO 6C Q CLASS B 18" THICK ELEV: 234.60'�� C BE SEEDED WITHIN SEVEN DAYS. - •Fo - 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE Fi I AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED **ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) S ..S SF SF SF FROM INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS WITH 1.2" ORIFICE FOR DEWATERING THE -� SF TEMPORARY SILT / BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR 1 - - - SEDIMENT BASIN DURING CONSTRUCTION. � FENCE (TYP) REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. I TOP: 235.10 Y SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN LEGEND: \ IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE ECM ECM-EXISTING CONCRETE MONUMENT 0 / t� U I a 234 23 A I J I WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. �' r l 233 GABION WALL 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT EPKO EPK-EXISTING PK NAIL / ✓ / FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE EIR a l- . PERMANENT INFILTRATION BASIN-1 ❑ JN JN N TOP: 23.10' OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE O EIR-EXISTING IRON ROD � � INV: 232.10' - HIGH WATER: 234.95' (100 YR) JN JN w OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING o COMPUTED POINT / �/ 234.77' (10 YR) I I 23s , CONSTRUCTION. R/W - RIGHT OF WAY 232.10' (1 YR) 0 I JN JN dN FOREBAY �I 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE N/F - NOW OR FORMERLY ) r �C \�Q TOP OF BASIN: 235.10' BMP-01 J RIP RAP DISSIPATER I CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN r / INVERT OF BASIN: 232.10' I JN JN JN a N L=8' W=4'/9' / ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT PROPERTY LINE / I w -OP - - - OLD PROPERTY LINE EMERGENCY SPILLWAY: 234.60' o D50=8" DM 12" CONTROL PLANNING AND DESIGN MANUAL. r INFILTRATION RATE: 3.11 IN/HR I BTM: 232.10 FES-3 CLASS B 18" THICK L. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A ADJACENT PROPERTY LINE f SHWT: 229.83' O i w � \,O�' 0 MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING RIGHT-OF-WAY I > J �- / � LL - 234 � o I� o n I ACTIVITIES. 910-433-3300 r to x INV: 239.80 1� 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED INFILTRATION BASIN IS TO BE USED AS AN ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON - SETBACK LINE / EROSION CONTROL MEASURE THROUGH n �• \ ss SANITARY SEWER LINE r C CONSTRUCTION THEN CONVERTED TO AN SF ( I TEMPORARY CONSTRUCTION A DAILY BASIS WHEN TRACKING OCCURS. INFILTRATION BASIN UPON STABILIZATION 00 �S z38 0�0 -�� C r ENTRANCE 6. LOCATE SOIL STOCKPILES NO LESS THAN FIFTY (50) FEET FROM ANY X FENCE LINE f > 17 Zao_ Zap 1 0 PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING 270 MAJOR CONTOUR ( OF THE SITE. �OOI co�� I Cc�j t7 0-) W FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY 2 H.62 O O VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM 278 MINOR CONTOUR / EXCAVATE TO A DEPTH OF 232.60' FOR THE J L_ J ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. LIGHT POLE / 1 BASIN. AFTER SITE IS STABILIZED I o > 241.25 �o4HP�o � O TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO PP EXCAVATE TO ELEV: 232.10' AND CONVERT � L C Z • UTILITY POLE S THE BASIN TO THE FINAL DESIGN ��� tO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE I I u)240.97 �� nF o G I COVERED IF LEFT MORE THAN 24 HOURS. SANITARY SEWER MANHOLE FOR THE INFILTRATION BASIN. TEMPORARY INLET ��� o�� C o D I 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN / PROTECTION (TYP) DI-2 4 Cn PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. PROJECT NAME COVER SLOPE MATH NAG S75 a I r,�, ;;0 Cl) INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A EC MATTING OR EQUAL IMMEDIATELY aU-0 241.77 243.34 O (r- DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED UPON CONSTRUCTION \,OC \� �Y_�'HP-' C EROSION CONTROL DEVICES IMMEDIATELY. / pS / 8. TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED AREAS WHICH NOTIFICATION OF COMBINED SELF-MONITORING AND / J _ VOC \`I 241.88 - 2q3 78 LF OF CL IV HAVE BEEN FINISH GRADED, AND ALL DENUDED AREAS IN WHICH SELF-INSPECTION FORM: SIT 23� �`J 15" RCP GRADING OR SITE BUILDING CONSTRUCTION OPERATIONS ARE NOT RAEFORD �O F S, / D\\1 23g 242.84 241.92 r- 1 ACTIVELY UNDERWAY AGAINST EROSION DUE TO RAIN, WIND AND THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 0 C 3s - - 0 RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION VASS ROAD 2 "4""r "" " INV: 240.75' 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR G Q\J 2�o CS " "" 241.73 M 242 50 �0 CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE LAND-DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH -A � r AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED o 242 24- I \ I APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. EROSION AND SEDIMENTATION CONTROL PLAN IS BEING z c� �- / 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE /INV_ 2Q38.i0' �� 242.00 O -� I I PERMANTHE OENET VEG TAT ON CTED AREA A AS NB ENGOESTABLISH D,NE FINAL IT IISA EOCO MN NDED DOLLAR INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. \ 1 N 242.58 243.01 I THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. TO SIMPLIFY DOCUMENTATION OF SELF-INSPECTION REPORTS LIMITS OF CONSTRUCTION \ I N 242.58 �'` i ( I 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY 1243.08 1 AND NPDES SELF-MONITORING REPORTS, DWQ AND DEMLR o I 1.9 AC 0 a I I WITH THE INITIATION OF CONSTRUCTION ACTIVITY. GENERAL DEVELOPED A COMBINED FORM. THE SELF-INSPECTION 1 O > I 242.95 _: -`- a 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PROGRAM IS SEPARATE FROM THE WEEKLY SELF-MONITORING �1 r J o 242.16 1 PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. O � r � 2'' � 242.50 PROGRAM OF THE NPDES STORMWATER PERMIT FOR �P l Q,, F7 I i�. I 242.86 '° 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND CONSTRUCTION ACTIVITIES. THE FOCUS OF THE S J✓ Oct ` ''' �� a 242 58 TW/EP- N N i PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS SELF-INSPECTION REPORT IS THE INSTALLATION AND / , / LI Oc I _ rn v zl PROJECT. MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL ,�C, 7''� " - //�^ll` I ° N I \ 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR MEASURES ACCORDING TO THE APPROVED PLAN. THE eCFiQ O OPL- -� OPL -OPL- - O OPL- - -OPL- - -OPL- - -OPL- J -OPL- - -OPL- - I 242 36 �Ar U STABILITY AND OPERATION FOLLOWING EVERY RUNOFF-PRODUCING INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF � I RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND - - �1 J I **COORDINATE DOWNSPOUT LOCATIONS I ;" EP- M 242 91 REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: I I WITH ARCHITECTURAL PLANS. CONNECT I 242.46 �R / I DESIGNED. HTTPS://WWW.DEQ.NC.GOV/ABOUT/DIVISIONS/ENERGY-MINERAL-AND- / r v DOWNSPOUTS TO 10" PVC. YI-4 \ N 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND LAND-RESOURCES/STORMWATER/STORMWATER-PROGRAM/NPDES- r > a I GRATE: 242.32' FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED CONSTRUCTION-PROGRAM N 242.34 BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES GRADING AND \ 246.35 LF OF 10" 0 INV: 240.30' - 242 98 / OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, L HDPE C� 1% MIN PROPOSED BUILDING 242.52 ( OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) T'Sp (76'xl40') / BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT 433-3300. O�'�i9 0 10,640 SF \ GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION `S ��� ti I� TEMPORARY DIVERSION"-AL) J o FEE 243.08 242.53 / / �N ) N EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GRADING NOTES 09 T y ` BERM (TYP) YI-5 GROJ ( I I J FORUALD COVER L DISTURBEDFICIENT TO AREAS WITHIN TAIN EROSION MUST BE 14 WORKING DAYS OR 90CCA CALENDAR .00 O� � � TO BE SEEDED WITHIN GRATE: 242.32' I -243 20 CONTROL PLAN 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE J ,F 7 DAYS 0 I INV: 239.80' 242.16 Ry I DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF 2 I CONSTRUCTION DEVELOPMENT. BENCHMARK AND MUST BE VERIFIED BY THE GENERAL 1� S \ > 0 242.86 , CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED ) o 242.95 TW p 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL GRADE OF THE CURB, UNLESS OTHERWISE NOTED. cn 242.45 p 242.36 �� 241.95 MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES `7 I o 242 45 TW/EP CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 107.5 LF OF 6" `� � 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND cD 242.58\ I 242.36 ti� HDPE 0 1% MIN I MULCHED ACCORDING TO THE DETAILS HEREIN. LONGITUDINAL SLOPE NO STEEPER THAN 5%. OJ > I 242.50 TW/EP 242 43 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT ARISE ON 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL ( o i I 241.98 C, , / = YI-6 �'' 1 242.95 -6 Li I SITE IS MATT TAGGART. CONTACT 910-944-0881. CLIENT LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE a / ''' Fi _ 1 C WITH THE APPROVED EROSION AND SEDIMENTATION GRATE: 241.90' nj 243.08 L-242.95 oe - - oP' - -241.51 - oPL C A CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND SHED r / J INV: 239.80' G 242.86 241 99 I V 243.03 ` , TW 1 DEBRISMAINTAIN ALL LEAVINGRTHEOSITEONTROL DEVICES AND ON NEIGHBORING ROADS.AR ANY / O �J 24258 g DI-1 241.75 244 I L RHETSON O "= a ="- � I LOC LOC� 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE INV: 240.00' 243 _ �; 242.86 91.5 LF OF 6" 6' PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, _ _ �TW/ HDPE ® 1% MIN �,�, ' 001 AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL \ vo > l •�1.. - �001 COMPANIES, INC. BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND `� I J o 243.03 242.40 i 242.36 'o O HAS BEEN COMPLETED 242.86 242.36 EP/ � & 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE / �242.77 TW EP CONTRACTOR AND THE OWNER TO PROTECT ADJACENT / (p I I 242.85 242.61 _/ -- --_< 241.94 9 O/ � _ PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING Q 0 _ __- "-�� I 7242.11 3 91% 1 OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR 0 > l tiR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR i �` qA/ \ o J o 242.88 242.74 242.38 �a5 STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN �CF 24296 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY TFQ I \ 2075 Juniper Lake Road THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE 1 243.03 24374 I I N AND BELOW GROUND SHOWN OR NOT SHOWN ON THESE / 0 242.77 West End North Carolina 27376 PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE 0 o 244.29 24333 243 / Phone: (910) 944-0881 . TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS \ / 244 OPERATION. 1 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH 244 33� 244 DURING AND AFTER GRADING BY THE CONTRACTOR TO / c� DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT S� [ ✓ Z �/ j p 245 - \ 246 ¢_ IS DETERMINED THAT THERE IS A SLOPE STABILITY PROJECT INFORMATION N PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT C,G�93/'SO) y Oct FiQ \ / 246 �02i F02� 00^ N SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED O BY SILT FENCE. ��p�tiq 9Q O - 1 001 01 0 DESIGNED BY: SCOTT 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL 'J IDo PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS 83 O 001 / DRAWN BY: SCOTT IN PROGRESS. 6 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE **ENTRANCE SHALL NOT BE USED FOR CONSTRUCTION _ N CHECKED BY: CHRIS TRAFFIC. SHALL REMAIN ASUCH THAT THEY CAN TRANSPORT THENNATURALITION DRAINAGE UNTIL FACILITIES TO \ �, ^� �~ "` PROJECT NUMBER: 2019 3 HANDLE THE STORM WATER ARE CONSTRUCTED. THE CA CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE (D DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 0 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN cA cA US 401 (FAYETTEVILLE ROAD) cA \ L DRAWING SCALE SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR `-� 60' PUBLIC R W `n N TO IMPLEMENTATION OF THE CHANGE. 0 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR - HORIZONTAL: 1"=30' o MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. DATE RELEASED *DO NOT COMPACT THE BOTTOM ® �F THE BASIN.U PMENT HAL� MECHANICAL BE USED �9 / -moo EQLONG BASIN BOTTOM. \ LO AUGUST 20, 2024 T 2Q 2J / 30 0 15 GRAPHIC SCALE 120 **CONTRACTOR IS RESPONSIBLE FOR ? PROVIDING POST CONSTRUCTION 2�2 S6 > INFILTRATION TESTING AT BOTTOM N s6 Know what's below. OF BASIN. ONE TEST MINIMUM. IN FEET SHEET NUMBER SIDE SLOPES OF BASIN ARE 3:1 ( ) CaII before dI FROM THE TOP OF BASIN TO THE N Y g INVERT OF THE BASIN AND ARE TO 1 inch = 30 ft. OU . BE SEEDED WITHIN 7 DAYS. -30 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1 -800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED '