Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
SW3231005_Design Calculations_20240820
SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name DKOTA-Salisbury 2 Project Area(ac) 3.46 3 Coastal Wetland Area(ac) na 4 Surface Water Area(ac) 0.28 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4)7 Width of vegetated setbacks provided(feet) 30 8 Will the vegetated setback remain vegetated? Yes 9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No (NUMBER AND TYPE OF SCMs:11 Infiltration System 12 Bioretention Cell 13 Wet Pond 14 Stormwater Wetland 15 Permeable Pavement 16 Sand Filter 1 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Filter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) 21 Treatment Swale 22 Dry Pond 23 StormFilter 24 Silva Cell 25 Bayfilter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Kevin Caldwell,President 28 Organization: Geoscience Group 29 Street address: 500 K Clanton Road 30 City,State,Zip: Charlotte,NC 28217 31 Phone number(s): 704.941.2252 32 Email: kcaldwell@geosciencegroup.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. Designer Signature of Designer 8.13.24 Seal Date SAND FILTER 1 Drainage area number 1 2 Minimum required treatment volume(cu ft) 3402 sf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yet,' 4 Is the SCM located away from contaminated soils? Yes 5 What are the side slopes of the SCM(H:V)? Does the SCM have retaining walls,gabion walls or other 6 engineered side slopes? No 7 Are the inlets,outlets,and receiving stream protected from erosion Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? _ 9 What is the method for dewatering the SCM for maintenance? _ Pump(preferred) 10 If applicable,will the SCM be cleaned out after construction? Yes 11 Does the maintenance access comply with General MDC(8)? Yes 12 Does the drainage easement comply with General MDC(9)? Yes If the SCM is on a single family lot,does(will?)the plat comply with 13 N/A General MDC(10)? 14 Is there an O&M Agreement that complies with General MDC(11)? Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes SAND FILTER MDC FROM 02H.1056 18'SHWT elevation(fmsl) 754.7 19 Type of sand filter(open or closed) Closed 20 If closed,will the filter will be pre-cast or pour-in-place? milmli1111111m CMP 21 If closed,top of grate elevation(fmsl) 766.5 22 Is this sand filter designed to attenuate peak flows? Yes Sediment Chamber 23 Volume that can be retained in the sediment chamber(cubic feet) 1701 cf 24 Will there be a permanent pool in the sediment chamber? Yes 25 Bottom of the sediment chamber(fmsl) 756.54 26 Area of the sediment chamber(square feet) 577 sf 27 Physical depth of the sediment chamber(inches) 18 in 28 Ponding depth in the sediment chamber,above any permanent 71 in pool(inches) 29 Elevation of top of weir between chambers(fmsl) 757.75 Sand Chamber 30 Volume that can be retained in the sand chamber(cubic feet) 1701 cf 31 Bottom of the sand chamber(fmsl) 756.25 32 Area of the sand chamber(square feet) 577 sf 33 Physical depth of the sand chamber(inches) 18 in 34 Ponding depth in the sand chamber,above the sand surface 18 in (inches) 35 Elevation of the bypass device(fmsl) 759.21 36 Type of bypass device orifice 37 Mechanism for distributing flow over the sand surface baffle weir 38 Sand specification for sand chamber ASTM C-33 39 Depth above underdrain pipe(inches) 12 in 40 Will the media be maintained to drain at least two inches per hour at Yes the sand surface? 41 Is at least one clean-out pipe provided at the low point of each Yes underdrain line? 42 Will clean-out pipes be capped? Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 43 the sand filter(s): Sand Filter 1 10:28 AM 8/13/2024 DRAINAGE AREAS 1 Is this a high density project? I Yes 2 If so,number of drainage areas/SCMs 1 Is all/part of this project subject to previous rule 3 versions? No FORMS LOADED DRAINAGE AREA INFORMATION Entire Site 1 4 Type of SCM sand filter 5 Total BUA in project(sq ft) 55763 sf New BUA on subdivided lots(subject to 6 permitting)(sq ft) New BUA outside of subdivided lots(subject to 7 permitting)(sf) 8 Offsite-total area(sq ft) 9 Offsite BUA(sq ft) 10 Breakdown of new BUA outside subdivided lots: -Parking(sq ft) -Sidewalk(sq ft) -Roof(sq ft) -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 11 subdivided lots(sq ft) New infiltrating permeable pavement outside of 12 subdivided lots(sq ft) Exisitng BUA that will remain(not subject to 13 permitting)(sq ft) 14 Existing BUA that is already permitted(sq ft) 15 Existing BUA that will be removed(sq ft) 16 Percent BUA 17 Design storm(inches) 18 Design volume of SCM(cu ft) 19 Calculation method for design volume ADDITIONAL INFORMATION Please use this space to provide any additional information about the 20 drainage area(s): DRAINACTAREA INFORMATION Entire Site 1 hype of SCM N/A SAND FILTER_ 5 Total BUA from project(sq ft) 55763 sf 6 1995 rules NA SL 2006-246 2008 rules 2017 rules New BUA on subdivided lots(subject to 7 permitting)(sq ft) NA 1995 rules SL 2006-246 2008 rules 2017 rules New BUA outside of subdivided lots(subject 8 to permitting)(sf) NA 1995 rules SL 2006-246 2008 rules 2017 rules 9 Offsite-total area(sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 10 Offsite BUA(sq ft) 1995 rules SL 2006-246 2008 rules 2017 rules 11 Design storm(inches) 1995 rules SL 2006-246 2008 rules 2017 rules 12 Breakdown of new BUA: -Parking(sq ft) 43423 sf -Sidewalk(sq ft) 2998 sf -Roof(sq ft) 9342 sf -Roadway(sq ft) -Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) New infiltrating permeable pavement outside of 14 subdivided lots(sq ft) Exisitng BUA that will remain(not subject to 15 permitting)(sq ft) 16 Existing BUA that is already permitted(sq ft) 17 Existing BUA that will be removed(sq ft) 18 Percent BUA 37% 19 Design volume of SCM(cu ft) 3402 cf 20 Calculation method for design volume SIMPLE ADDITIONAL INFORMATION Please use this space to provide any additional 21 information about the drainage area(s): THERE ARE NO"OFF-SITE"AREAS.THE ON SITE DA INFORMATION IS FOUND ON THE"STORMWATER PERMIT APPLICATION FORM". TOTAL PROPERTY AREA=3.74.TOTAL PROJECT AREA=3.46. PROJECT PERCENT OF IMPERVIOUS AREA=1.26/3.46=36.99 z z N rn QO/L'396 COM% COOKE COM% OCOME OQZ G co Nt M 158Z•OB .‹ ; �� .,\ '� 7 M1S SE o06 N i - ''''"Et::::4*If, CV cn NVZit,* \ . ;y , 4J CO cci '_.hi r \ Ath \ 4 • \V ,_,.4' CV** ,.L s, —e4 j U 't r ` Z 1 , `\ .• • N cn o 'llilk c ' g U) U f m ` cna H - 0 3 p $_ to a 1. K ca S' f''` t a o ! i 1 ,4 v ucv t t § i f° I _ a , `J, .•. - - sw- -r I • J r .r ,, oC. O 7ya5 Qu d` r % 7S y• PS 7 ` \ k:iy,rt- Z Z u▪ c• oV M.LE.6Z•08 c'2 MI£,.Z e06 �tt-5 00666E O04Lt6E OO5ZKE OObZSEE OOEL66E OO? % gli z z PI N .6'n P� 1 Project Narrative: SCM has been designed per current DEQ design guidelines and Rowan County criteria. The pre-developed site is predominately wooded. See accompanying soils report to identify soils and precipitation frequencies. Post- developed will be drives, truck court, auto parking and a building. Pre-Developed Area = 1.76 acres. Post- Developed area= 1.76 acres. Design hydraulics will incorporate TR-55 methodology to calculate the time of concentration for the pre-developed site. Post developed Tc is not calculated due to the fact that storm water runoff will travel on paved surfaces into the storm drain system which is typically less than 5 minutes, Tc post will be 5 minutes. Hydraulic calculations will use U.S. Army Corps of Engineers Hydraulic Engineering Center HEC-1 computer program. Design guidelines are as follows_ • Provide water quality for the 1st inch of runoff • Control the 1-Year 24 Hour post development peak flows to pre-developed levels. • 85% TSS removal. • Detention(pre< post) for 2, 10-year-24-hour storm. • Safely pass the 50 year-24-hour storm. Pre Developed Condition Area = 1.76 acres=0.0028 mil Predominant Soil Types: Sedgefield Hydrologic Soil Group C/D From Aerial photo imagery the site looks to be wooded. Woods, Fair: CN=73/C 79/D Curve Number=73 +79=76 2 Tc=40.37 min. Lag=(0.6)Tc=0.404 hrs. (see spreadsheet) Note: Rainfall data taken from NOAA Atlas 14—Salisbury (see attached) Results of HEC-1 Analysis (see Calculations) Storm Peak Flow (cfs) 1 —Year 24 Hour 1.065 2-Year 24 Hour 1.60 10-Year 24 Hour 3.03 50-Year 24 Hour 4.40 2 Sheet Flow Manning's n for sheet flow(table 3.1 TR-55) smooth surfaces(conc.,asphalt,gravel,or bare soil) 0.011 Head= 12.00 Fallow(no residue) 0.05 mannings: 0.4 Cultivated Soils P2= 3.12 in Residue cover<20% 0.06 Length= 300 ft Residue cover>20% 0.17 s=H/L= 0.040 ft/ft Eqn 3.3 TR55 Grass 0 grass raire p 0.15 .007 /11L �O.S Short Dense grass 0.24 Ti = Bermudagrass 0.41 V/7S0.4 2 Range 0.13 where: Tt=travel time(hrs.) Woods n=mannings roughness coefficient Light underbrush 0.4 L=flow length(ft.) Dense underbrush 0.8 P2=2-yr, 24 hr rainfall(in.) s=land slope(ft.ift/) Tt= 0.66 hr Shallow Concentrated Flow L= 110 ft h= 3 ft s= 0.027273 ft/ft V =16.134515 V= 2.66 fps T=U(3600V)= 0.01 hr. Compute travel time Tc=Tt1 +Tt2....Tn Tc= 0.673 hr.= 40.38 min. Lag= 0.404 \ \A‘ TP J, ( \ Ne% \ zA'," \ r/ 7 \ ,i. k , a r4,t ct, __,, \ .W \\ ( \ \ / \_ f\\, I. '�jj/� A\ \ � \ \ \ , \� \\\ \\' Iv� .� 1- \( —.11 \/ / \\I \ cpI __.Y \\ \4,%; , 0 \(;f1 \\)S / / ----- N ..---\,.. \ N„.... \ ROWAN COUNTY ,, iR , \ % •� PIN: 5658-02-86-0330 sy '// '\ ) \ t �n \ DB 951/PG x _ . / \ \ MB 9995 PG 6467 \ I USE:9995/PG - ` - \ \ J \ \ \ , \\ 2 ;~ ' - v /// / V v / \ \ V' i / N�\ \::' \/ - PREDA: 1 .76 AC / \ 4`'y�i \\ s •(//(A 7 '4. \\ \•)\ \ *s S 1.15,is. V44 /1 7 // Z' ,,'''. y d TC: 3p4' /‘,... -7/7/ ---- / V \ 7 / 7' t/7 / / / -.-- c• --d -7--- /17 \ ,s, \ --..._,. lio 9, .. ' \ \ \ \ /11/ — _____,N40'29*.19"r N i i '' ( // / / \ L \ 11/ \ \ NA5.94' (Tly A\ /,7//li v / !sirY \, \ /Lc f \ \ \ 144 y/4\ / 1// � / � \ \ \ :!:1,7,,,i7 \ _I I/ / /. 7 / 2,/,/ ''' \ / \ -----..:.15 — --7tt. ve,7 , / / 4. ---...._ ) )/11 / \ \• \ 7 \ \-') ( \ i __-/ L dk i ---- '----_,,, \,.. r ,,, � >" ,k • d \ a. �,, A / �oti cy r� \ 51. // ft`�L\C9A• 00,e r 1t.� VONIC.\.......ii V \ \ C2 .4, ,^ N41'06'• • MIL._ \ I�t O �—= v v0. 1v vet-—v �.. vtv v vrER —�' G ..�.�----CI- / c� F F — �i� `-�� —' -__ \ ROWAN COUNTY r �— _ ASPHALT mom \ \\ ��P TO ASPHALT PAMEIQrT G �— \� PIN: D 231/PG 7 5658-02-86-0330 1 _ n y — p _ _ _ _, _ T,03' MB 9995/PG 6467 '2 i�Teti \\� OGTFL 9S� CORPORATE CENTER DRIVE �~� ,-----\ G O'0 O I �2�!�B9s \\� °s��� (80' PUBLIC R/A) _ \ i ,iy9 USE:VACANT 1 ill\l' s 80.c'�, ® T PAS• \' \ \ sS3,, o R:\Drawings\2023 Projec s''\Dkota S�isbury\2203 v 1_SUMMIT CORP CEIR`ER_LOT 2_T0PO_012 "3_recover_recovel7rez ex.dwg,, 1:50 2 -- \ CO v N.- 0 0 co T. N N CD m p d cOfpa gyp $m e N Of N N YQ ` U) fa T a) a) f6 _ S r' m m m -t c0 N V y IN 3 C 0 a. O o p a U O U O U N a) = C 8Em0 E m aa)i -ov0iEv ` co N8. CD o, E faod E ai.- d aa)i a C - Um Z a C o m o c mv . CO fO o CO E CO aj a tU0- o to w N f9 vmi Q f/) E co co .O ron • O N O E m a) O a) •C a m U O N o 2 CD c co 04 Q 3 « o « LO m C d 'D CO TQ t N D — o 2 5 C r m t Q m canoe E o co@ �L m 0 ° m .... c � fmn � aI j .� y `°L E co m U CO `O .9.). Cp a N = Z aai 0 10 O m Q >, (11 co v 3o u o EE >•LL m m — c > C 0 m a _ ptCo � aZ c � - OLc . m a m U c v a)m ._a) a O O m Ce a 7 m U 0 N a C o 2 m L m N Q. o c m n @ m Z o v m m E c U O a) ''5 E U a) w J fl) N C.'C N m=_ Ofx L U .L.., 30 C L a p L .c .O p rt 7 E as U O a) y m O N O y Z y C y rn co w..p m o� �o ca; a03 a�i2mm CFI 7 up'i13 m � moo) E o :o> a '� c m m m O C O (n r 3 v U Co < 'N' co l0 O D d coa c U) m E E c aE -u) a) E - c O 3'H y = o U am yr E -o o) � m c�'N � � O a) o o m m m o a`) Z< 0-c) m L a z o O o •c W•O /drts co e m co U a) O > 7 >, CO y N t �0) c N -- E O O a m fp N m 1] p a N `m j y Y - m E o r o O a C r N O Z.U C O SSm m p m p (CO co.O U :E.� 0 7 O LP O N mC o E co L m 2 1-� wE_ om aE co 2aVCm 1- o cocn v).- Doi F- o ) 0 t r o >, Z a) c C c U o ca cm f0 � w 3 U C ca) o o IY o a f�D ... > ,n LO T. ?0.c2 0 cU la _ a. U C t m c f) N N O a am (CV) 0 Ny O o E. E fv o ec 0_ Z m mco y L' cc $ rpm 2 U U o z r y o ct 5 m 2 >>. m c = CIm t 1( 2 W ■ ■ A C I l 0 O U' 3 m W —I ro m II O eo Qcoco 'eTs P c 0 0 a ` a o m a) 2 E. 2 c le 0 co to < a m m 0 U 0 Z c < a m m U O 0 z C < a m m C •- .- m - � ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ o ■ ■ ■ ■ 0 y O W O cl m 7 to c00 O Z 0 DA Hydrologic Soil Group—Rowan County,North Carolina Dkota Salibury Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 Cecil sandy clay loam,2 B 6.9 8.5% to 8 percent slopes, moderately eroded ChA Chewaca loam,0 to 2 B/D 7.9 9.8% percent slopes, frequently flooded EnB Enon fine sandy loam,2 C ' 4.5 5.6% to 8 percent slopes 1EnC Enon fine sandy loam,8 ,C 1.4 1.7% to 15 percent slopes HeB Helena sandy loam, 1 to D 13.8 17.1% 6 percent slopes IrB Iredell loam,1 to 8 C/D 4.2 5.1% percent slopes PaC Pacolet sandy loam,8 to B 4.3 5.4% 15 percent slopes r _ SeB Sedgefield fine sandy C/D 36.2 44.7% loam,1 to 6 percent slopes VnB2 Vance sandy clay loam, C 1.7 2.0% 2 to 8 percent slopes, moderately eroded Totals for Area of Interest 80.8 100.0% USDA Natural Resources Web Soil Survey 8/21/2023 ZOITI Conservation Service National Cooperative Soil Survey Page 3 of 4 _ V V to O CO C? COCl ODis: N(V MO (00 NNI Mh OCD OO CO ,- M01 On N h H P. W CO•� N W i O W.i TO CO 7 rOD NN MN etO M tO ((O 000(oj O)COO 1-p) .ret - - C 1`m M C) tto co N c07 to O CO N e ^O N'7 H '7 �N SR V R6 CO 4to coO c �� O oOD � v- MOD CV cy •4 • ib o v in crn rrNaivv (ct: O3N. orcov- <A (O ,-- .- (V M co V to Co N a O) O - �....k. CO N CO 1N t M CO CO a-- ,sd •'a O V O O CD N N CO (.,) CO CO O m) O) n 00 et O m tC) ,' O ^ . r i ‘t M . N . O M pad V . N . OD -T O M . I` N •pN r0 rccl NOa Ma Mtq 00 r coN ^N .- OIc Oi .- ' N N C) M V 6 h CO to n.TS (O n co U)) co N co. M U CO tO OD ›, O T. V m- ,.., Onl � (,5 ti .- Mom) CO,S Mh tt� NO (O re Q W d C p n r N O . m � o1 o) . o; .; "Cr m n M O 09 O O N C7 W. tq m• M ° Q o m 0 N r oo rO r. N )- () N MC''.) �t(q et. �� tic o^ ao_ Di to O ea 'A co rn v . to (o M rn (D N a y• OL a0 ti W y m C) prO hp OD I` ' h N O O (O O (n O (n 00 to h .- 9 v `� N o co R 2 O O' M O N O CM (,y m co r) cr. a cc) to ,I, (O N h COO O 0 .. U } a t w M O CJ N to co 6 •Ni O CV •OS • CO •V •CS C (n d (6 Z g (n Q Z. C pN r23 rN NCO Nt0 MO MC) � O U/ O �O) Wit• t`1- CO o e- ,C o W Y �I ` 3 0 0 0 (v co (*i v v tri co 6. ti p « amco n $ _ t) w ' ZITCw2C9 a ` o H c NM >Ior., Eai Ce `) vI D Jet !.. NCO v 0 M Co m Z Zm o CO N G 3J (C W 8 IL m 0 N Vo C i M � N � cV oth co N(? co o � �u; CD (� �?� T.aoh 10 z c" al) p , ' Z c (A (0� ++ _ d N cD t` r(n .-Nb r• tO ..`) ..h (h°p O, N d N to" (c .- us C 4D <O .� O � O W to h C) h O O ('7 C) O M 7 C '� M W '�' O N 0 - = L. U) L to _ N- N- C'I N N C) V tf) CO (O> `+ y to r Q m m a� d 0 cri R o 0 (n NI H 11 0 L M N- CO Co N- 'Cr 'Cr CO N •p LID • dM p a V Mm (yCD ry ao v o o c0 r� o C „ r M r co co r o „ oo O • aj :w. V O Q O 00 4 sg N (V °I c? u? 9 (O N 'O t9 ° "' d r N Q)(O r • �i N (O . P. . M O � 00 . � � ti O ill = W L0 N to .-O rh N `� NO NO Mom �0° . u'1N m (O c « d w c Z o o 0 o to o (� to m V v Q MJ W l' 8 p It L Q v Z Z a 4' N. N (o co to o n v n to 0 0 Q = O to co O) (D v CO N h q O C) Z J (i d 0 MO V O I� M (ON ON MN Mt7 (O co '(t O6 N O) w O O m oa N O N. O) . N 4�; q O. r Is. p u? h it+"F •r'9 ,y O Q O CC° r o r d, r °R N O N N NCO M NCO tt V � h N *►� C. O O .r.. N.. v N.. ci (� v f t IL ai •� Oa) O) coV n N O) N CD N V' h N,� L 1n 7 F h V O (h r- m to O to O M '•.k,.Co' 0. N N O N O T.O t0 CO M o N 3 N t0 (,.) O(,.) N V 1l) O) `7 d r` O) 4 n0 6 v 6 o•a �;O) M 6 1�•v (".ch O• 6 O Y N = p� p� pNr r .- r V rCD rh N V4 CI CD (' LO BOO It N (V C) M C) ,O O O O Ow 1 h CO C LO N.) V N t[) N p M CD O) V CO O (O h CD OD C] e.O to O N g g r N O) to C) O t`c7 h to OO U) .1- M (O cb t.^ O.O M i (n t0 Cn N N " 6 r M? N 03 C 2 C t 0 O r F r N r C) r r n N .�- (V t() M O) C'! Cel co — O O c; E.), .... ... `. .r 0 =o c C C_ C_ C6. L L Q. Eil E E E E L .0 t L t Cc0 (0 m 0 In O N O O N M ID N N e V 0 r r 01 CO r� O n v :Zr:' of o 0 ..- a co d•N r•N •N CO m CMvL C CS I-C4 C)(,:) Na- IL)ap d c6 O ACV T CV �CO a- • N �• N C7 c CO E C v v v y O o T` r� m (D _7 N OD c a. e- r.. N cam M r m o N N aD N Op. N N CO I CO r cei I Q O N N r UN)• a- ^ N •O N ry� _O!a v .... �.. v .N•,. v C N O(a 10 E (A N IA (D Uj N a.N O CO CO CV f` O con co c; M ri 'U W • N N N V 00,1 ,- � 4o,... 40 Q) W 1` N ch a o O O O r) up ao In O .... v v v • v v w N 0 0 �C s 4 'cF N C) r) O) d .0 d C'V. (o` cD f• Its O a a n. N a)W O O• 1-el •O In O e-CO O N N• N a d .-. V N r N O CD j CO C O r 't O a 6 6 OD O a) E) CO c0' O)Oi ti N 1` ' OI N O c N 3 aoM �,_ r � a- M r0 N-6 co U a) C I,. W CA a C v v v N O(a V N =C U) CI CO CO O. C) C) r` N T 0 0 0I o;� nrMt-� 0Fj @at n- os rn i n ! ri i 6 ' m ' N co N d CC coto co ter.. c t = (tea a) wmE LL CT o�.0 a. CO CO O O vt 'O M CO el- Wr Q cn ON a� 0 i cc; co `� O �,..�•On c0v. �NQf� I a-0, a-N a c %g U) CD N co e•• r e- YCO 3(a R N N O a a 0)a) a) y N^ r) co O ID N Is- Cl CO C=2 2O CO C•1 "' 0(9 r) • ao °)CNI �`•, N m BCD a ` 3 GI a CD h CD (D CO CO (O OD cn 0,O O—N• T^• r d• 3 O C toC O. O In l0 a) O V n — t7 r) O N aD ,C) co c a N O• r1U• 0Ui c •f` Nof i!N 1, m E d E 1" O) (O N ; •r T i E .N 7 7 O O sf co IA m 1:t- •Qf OD r T-N y a) W E O R ri m d `•g v _ a m rn E �, T coN asOO Fri D r) CD CO N F....) N c 'y CO (aa Q ri v., .- a m I CD 0 1.r d a) 'n co vc 44 (co F8 oiy mac? y ccaa0 ri r) co r` a) r w c in Z o co''ia C E m 8 as —co coco co COCO CO a �, v m •Q V r> a,Y N t` V.r N el et CO 0 d D rn m 2 r Z co o a a CO > a T. T CO CO CO CO CoCO CO CO CO '0D D D ID 9i Di Di 7O O O : O U a a CO di o •1 C cu U O N O 0ocpoo 0 0 0 00 I I I I I I I I d y tO •" N U7 r N to r N in r 16 III I I I LI o C C C C d r O f7 OO i i T T d' If) r V) tD N in17 N I I I I I I I I O Aep-09 0 - cep-5ti .� . - /pep-O£ 0 . _ - /ep-OZ Ln - O in - Alep-Oi - l(ep-Z o V F - O 1.1 �-, - Ae 1 o , - Aep-c 0 - lcep-Z - o u 00 c y � - -1y-bZ ! _ o = in a,O ? •5) _ iy-Zio 0 7-1 v, O I.- ` N CEO U - i) y� 0 i to C to \ o m - y-Z 1 _ o N to a7 -a ' i - ww-09 ca X - - up-OE \ , Lin a • - up-Si - ww-0T si if1 0 in O U) O in O N N '-C rl N N ,-4 ri in 0 (ui) yndep uope1!d!JaJd (u!) q dap uogelid!Jaid HEC-1 INPUT LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 1 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 PH 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 IDS 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 IM 100 YEAR 18 KM 0 0 0.715 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK PRE 21 B . 0.0028 22 LS 76 23 UD 0.404 24 KC 21 25 SZ ***************************************** ***************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 21AUG23 TIME 14:25:16 * * (916) ***************************************** ***************** DKOTA SALISBURY PRE-DEVELOPED 1 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NM.TAT 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 C STARTING DATE ITINE 0000 STARTING TIME .,0 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTI:a 0559 ENDING TIME ICTNi 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AR?A Q TARE MITLES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION TION FEET FLOW CTILIC ?MET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *,:* *** *** *** . ** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 6 KK * RAIN x * * ************** 19 KO OUTPUT CC)".TTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT C PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IP?7CH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOC.?.OG 015r7 .01667 24.00000 *** *** *** *** *** *** •„ '•k *** *** *** *** k*k *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** 20 KK * PRE * * * ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISLV1 1 FIRST ORDINATE PUNCHED OR SAVED IS«V2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LC LOG .01657 .01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 O. 0. 0. .00 HYDROGRAPH AT PRE 1. 12.48 0. 0. 0. .00 *** NORMAL END OF HEC-1 *** Hydrograph Peak Flow Rate Peak Flow Total Volume Name (CFS) Date/Time x1000 (CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 1.065 Dec 01, 1900 12:30 5.449 HEC-1 INPUT LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 2 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 PH 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 K 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 7.K. 0 0 0.715 1.44 3.04 3.67 4.01 4.93 5.96 7.13 ?9 CO 21 20 :7K PRE 21 a 0.0028 22 LS 76 23 DD 0.404 24 ;3.0 21 25 ***************************************** ***************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 21AUG23 TIME 14:28:51 * * (916) * * * ***************************************** ***************** DKOTA SALISBURY PRE—DEVELOPED 2 YEAR — 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NM7N 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME • MO 130;) NUMBER OF HYDROGRAPH ORDINATES NDD:122E 2 0 ENDING DATE NDTUetr, 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TC^ .L TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AMA 3O ARE MILES PRECIPITAT'ON DEPTH INCHES LENGTH, ELMTATION .FEET FLOW CU IC .^EET PER SECOND STORAGE VOLUME ACRE—FEET SURFACE AREA ACRES TEMPERATUR DEGREES: FAHRENHEIT *** *** *** *** *** *** ;; ...; *** :t** *** ** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************** * 6 KK * RAIN * ************** 19 KO OUTPUT CONTROL 7Te`.F.IABM. IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL OSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH OUT 21 SAVE HYDROGRAPH ON THIS UNIT IS:'V1 1 FIRST ORDINATE PUNCHED OR SAVED ZSAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LI;R..:4OG .016(37 .01667 24.00000 *** *** *** *** *** *** ' k *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************r* * 20 KK * PRE *************;, 24 KO OUTPUT CONTROL VARIABL^S IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPZ:CH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISiV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LC',LOG .01,5.57 .01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 0. 0. 0. .00 HYDROGRAPH AT PRE 2. 12.48 0. 0. O. .00 *** NORMAL END OF HEC-1 -, * Hydrograph Peak Flow Rate Peak Flow I Total Volume Name (CFS) DateiTime I x1000 (CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 1.603 Dec 01, 1900 12:30 7.949 ....... . . _. ..____._.. HEC-1 INPUT LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 10 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 C.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 PH 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 XM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 `{C 21 20 iccc PRE 21 3 . 0.0028 22 LS 76 23 UT) 0.404 24 ;cc. 21 25 7,Z ***************************************** ***************** * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO * JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 22AUG23 TIME 07:45:18 * * (916) * * * ***************************************** ***************** DKOTA SALISBURI PRE-DEVELOPED 10 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMI.N 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 C STARTING DATE ITIME 0000 STARTING TIME :70 1800 NUMBER OF HYDROGRAPH ORDINATES NDD.= E 2 C ENDING DATE • NDT:_ME 0559 ENDING TIME ICE_:i 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TCTAL TIME BASE 29.93 HOURS ENGLISH UNITS DRAINAGE ARIA. SC'TARE MILES PRECIPITATION DEPTH INCHES LENGTH, .ELEVATION FEET FLOW CUEIC .TEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE .'4RrA ACRES TEMPERATURN DEGREES FAHF.ENHEIT *** *** *** *** *** *** :.::k *k* *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ***********k* 6 KK * RAIN * * ************** 19 KO OUTPUT CONTROL V2IRIAI3LEE IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE .I_PNCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS. V1 1 FIRST ORDINATE PUNCHED OR SAVED ISrV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LCGLOG .01657 .01667 24.00000 *** *** *** *** *** *** x 'k *** *** *** **.. **:, *.•* *** *** *** *** *** *** *** *** *** *** *** *** *** *** * * 20 KK * PRE ,, ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL O. HYDROGRAPH PLOT SCALE IP CH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS:W1 1 FIRST ORDINATE PUNCHED OR SAVED 18 V2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN Y..G'?LJG .016,C7 .01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 0. 0. 0. .00 HYDROGRAPH AT PRE 3. 12.47 1. 0. 0. .00 *** NORMAL END OF HEC-1 *** Hydrograph Peak Flow Rate Peak Flow Total Volume Name ICES) Date/Time x1000 (CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 3.025 Dec 01, 1900 12:29 15.427 HEC-1 INPUT LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID PRE-DEVELOPED 50 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 K! 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.1E 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 1:411K 50 YEAR 16 PH 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 :KM 100 YEAR 18 Kg. 0 0 0.71.6 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 21 20 PRE 21 3=. 0.0023 22 LS 76 23 DD 0.404 24 ;cr' 21 25 ?Z ***************************************** ***************** * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CO JUN 1998 * * HYDROLOGIC E * VERSION 4.1 * * 609 SE * * * DAVIS, CA * RUN DATE 22AUG23 TIME 07:46:33 * * (916) ***************************************** ***************** DKOTA SALISBURY PRE-DEVELOPED 50 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 TO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPHa TIME DATA NX7N 1 MSNUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME 7Q 1800 NUMBER OF HYDROGRAPH ORDINATES NDD`_TE 2 0 ENDING DATE NDTT+T: 0559 ENDING TIME ICE:. 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS T0'''AL TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AR"s SCTTARE MILES PRECIPITAT'_GN DEPTH IN(HE3 LENGTH, ELF;7 TION FLOW CL."'.IC .^'='ET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE A1t7A ACRES TEMPERATUn:? DEGREES FAH.RENHEIT *** *** *** *** *** *** *:. . *k* :Y** ** A** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * *************-c 6 KK * RAIN * ************** 19 KO OUTPUT CC)TTROL �;ARIABLE IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPI:TCH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS2,V1 1 FIRST ORDINATE PUNCHED OR SAVED 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN .LOGIOG 016;S7 .01667 24.00000 *** *** *** *** *** *** •. •k *** *** *** **:• **i: *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** * ************x.' * it 20 KK * PRE * .. ************k:r 24 KO OUTPUT CONTROL VARIABLES IP_PNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IP1:CH 0 PUNCH COMPUTED HYDROGRAPH TOUT 21 SAVE HYDROGRAPH ON THIS UNIT IS1W1 1 FIRST ORDINATE PUNCHED OR SAVED ISR.,.V2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LCA.: OG .0103•57 .01667 24.00000 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIM OPERATION STATION FLOW PEAK 6-HOUR 24-HOUR 72-HOUR AREA STAG HYDROGRAPH AT RAIN 0. .00 0. 0. 0. .00 HYDROGRAPH AT PRE 4. 12.47 1. 0. O. .00 *** NORMAL END OF HEC-1 *-,* Hydrograph Peak Flow Rate PeaK Flow Total Volume Name (CFS) Date/Time x1000 (CF) RAIN 0.0 Dec 01, 1900 00:01 0.0 PRE 4.395 Dec 01, 1900 12:29 24.305 3 Post Developed Using NCDEQ sand filter design guidelines. Drainage area= 1.76 acres (0.00275 mi2) Total Post BUA= 1.28 acres Curve Number= 98 Grassed Area= 0.48 acres Curve Number= 74 BUA = 1.28/1.76 = 72.7% Water Quality Volume Compute Runoff Volume Rv BUA 55,763 ft2 ( 1.28 ac.) % Impervious = 1.28/1.76 = 73% Rv= 0.05 +0.9Ia= 0.05 + 0.9(0.73) = 0.71 SAND FILTER MDC 3. SEDIMENT/SAND CHAMBER SIZING. The volume of water that can be stored in the sediment chamber and the sand chamber above the sand surface combined shall be 0.75 times the treatment volume. The elevation of bypass devices shall be set above the ponding depth associated with this volume. The bypass device may be designed to attenuate peak flows. The area required for a sand filter device is calculated similarly to many other SCMs: 1. Calculate the design volume. 2. Multiply the design volume by 0.75, a "discount" that is allowed because stormwater infiltrates so rapidly through the sand media that the stormwater is treated throughout the storm event. By the end of the storm, the runoff from the beginning of the storm has already been treated and has exited the sand filter. 3. Divide the discounted design volume by the ponding depth, this will be the minimum surface area of the sand filter. 4. If the sand filter is designed to attenuate peak flows, additional surface area may be added in the sediment chamber only. The sand filter must be designed so that 50% of the treatment volume can be stored in the sand chamber below the first bypass device. DV= 3630 x RD x Rv x A = 3630 x 1 x 0.71 x 1.76 =4,536 ft3 Apply 75% "discount" = 3,402 ft3 Ponding depth of 5.9', filter area= 3402/5.9' = Minimum Surface Area= 577 ft2 Use 128" x 83" elliptical CMP, with 9.9' x 58.25' = 577 ft2 sand filter Soils, open good Chewada B = 61 , Sedgefield C = 74 CN= (61 + 74 )/2 = 67.5 CNW = [(1.28 x 98) + (0.48 x 67.5)] / 1.76= 89.68 4 Depth of Sand= 18" min. with 6"perforated underdrain Store 50% of Treatment volume before first bypass device = 3402/2 = 1701 ft3 SAND FILTER MDC 2. TWO CHAMBER SYSTEM. The sand filter shall include a sediment chamber and a sand chamber. Storage volume in each chamber shall be equivalent. Sand chamber Volume=( 58.25' x 10.6 ft2) = 617 ft3 Sand Filter @ 757.75 Volume is 2459.2 ft3+ 3402 ft3 = 5861.2 ft3 From Stage-Storage, by interpolation,volume is available @ 759.21 set first orifice Storm Pre-Devlp. Post- Routed Stage Comments (cfs) Devlp.(cfs) ' (cfs) Elev. (ft.) 1"-6 Hour na 1.104 0.034 758.42 1- Year 24 1.065 4.726 0.600 759.78 Post< Pre Hour OK 2-Year 24 Hour 1.60 7.184 1.151 760.64 Post< Pre OK 10-Year 24 Hour 3.03 10.167 2.034 763.01 Post< Pre & below top of pipe(763.69) OK 50-Year 24 Hour 4.40 12.447 9.504 764.26 WSE < Top OCS OK 5 Stage-Discharge 1. Sand filter Depth Area K 1.50 577.00 3.5 2. Orifice Dia.(in) Elev 6.00 759.21 A= 0.1963 sf. Head Measured from 759.46 3. Orifice Dia.(in) Elev 0.00 0.00 A= 0. sf. Head Measured from 0.00 4.Weir Length Elev 4.00 ft. 763.69 5.Weir Length Elev 0.00 ft. 0.00 Stage 1.Sand 2. Orifice 3. Orifice 4.Weir 5.Weir Total Flow Filter Box 756.25 0.000 0.00 0 00 0.00 0.00 0.000 757.75 0 023 0.00 0.00 0.00 0 00 0 023 758.00 0 027 0.00 0 00 0.00 0.00 0.027 759.21 0 046 0.00 0.00 0.00 0.00 0.046 760.00 0.058 0.75 0.00 0.00 0.00 0.811 761.00 0 074 1.27 0.00 0.00 0.00 1.345 762.00 0.090 1.63 0.00 0.00 0.00 1.722 763.00 0 105 1.93 0.00 0.00 0.00 2.032 763.69 0.116 2.11 0 00 0.00 0.00 2.222 764.78 0 133 2 36 0 00 13 66 0.00 16 151 0.00 -11784 000 000 000 000 -11784 Basic Orifice Equation Basic Weir Equation Q = CAJ2gh QC .LH3 `� C = 3.0 g = 32 .2 ft /see 2 6 763.69 AREA=2.4 SF(60.5) 763 AREA=6.6 SF(58.1) 762 AREA=8.5 SF(51.5) 761 AREA=9.7 SF(43.0) 760 AREA=10.2 SF(33.3) 759 AREA=10.1 SF(23.1) 758 ARFA=2_39 SF(13 0i 757.75 -AREA-1 Q;6: SF:'• `p. • • '' .. : .•, 756. 128 " x83 " NOMINAL PIPE ARCH SAND FILTER 8712 SQ.IN 60.501,0 SQUARE FT. 10'-3 7 Stage-Storage Underground Sand Filter Pipe = 128 x 83 Length Pipe(feet)= 116 Sand Elevation 757.75 Downstream Invert= 756.25 Pipe Slope(ft/ft)= 0 Area Volume-pipe 1 Volume-pipe 2 Total Volume Total Volume Elevation (ft'") (ft3) (ft3) (sq-ft) (ac-ft) 756.25 0 0.0 0.0 0 0 757.75 10.6 1,229.6 1229.6 2.459.2 0.06 758 13.0 1.508.0 1.508.0 3.016.0 0.07 759 23.1 2,679.6 2,679.6 5.359.2 0.12 760 33.3 3,862.8 3,862.8 7.725.6 0.18 761 43.0 4,988.0 4,988.0 9,976.0 0.23 762 51.5 5,974.0 5.974.0 11.948.0 0.27 763 58.1 6.739.6 6.739.6 13.479.2 0.31 763.69 60.5 7,018.0 7,018.0 14,036.0 0.32 8 Results of HEC-1 Analysis HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 9 9 10 1 ID DAKOTA SALISBURY 2 ID 1 INCH, 6 HOUR STORM ROUTED ONLY THROUGH SAND FILTER 3 ID GEOSCIENCE GROUP, INC. 4 IT 4 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK POST 8 PB 1 9 PI 0 0.003 0.003 0.003 0.003 0.003 0.003 0.004 0.004 0.004 10 PI 0.004 0.004 0.004 0.004 0.004 0.005 0.005 0.005 0.005 0.006 11 PI 0.007 0.007 0.007 0.008 0.008 0.009 0.009 0.01 0.011 0.012 12 PI 0.013 0.019 0.022 0.025 0.039 0.05 0.108 0.188 0.075 0.043 13 PI 0.028 0.023 0.02 0.014 0.012 0.011 0.01 0.009 0.009 0.008 14 PI 0.008 0.007 0.007 0.007 0.006 0.005 0.005 0.005 0.005 0.005 15 PI 0.004 0.004 0.004 0.004 0.04 0.004 0.004 0.004 0.003 0.003 16 PI 0.003 0.003 0.003 0 17 KK POST 18 KO 0 0 0 0 21 19 BA 0.0028 20 LS 0 89.68 21 UD 0.05 22 KK ROUTE 23 KO 21 24 RS 1 ELEV 757.75 25 SV 0 0.06 0.07 0.12 0.18 26 SE 756.25 757.75 758 759 760 27 SQ 0 0.023 0.027 0.046 0.058 28 SE 756.25 757.75 758 759.21 760 29 KM TOP PIPE 763.69 30 ST 763.69 1 3 1.5 31 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 12AUG24 TIME 14:09:31 * * (916) 756-1104 * * * ***************************************** *************************************** DAKOTA SALISBURY 1 INCH, 6 HOUR STORM ROUTED ONLY THROUGH SAND FILTER GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 4 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 6 0 ENDING DATE NDTIME 1316 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .07 HOURS 9 TOTAL TIME BASE 133.27 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 17 KK * POST * ************** 18 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .067 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 22 KK * ROUTE * ************** 23 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .067 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + POST 0. .00 0. 0. 0. .00 HYDROGRAPH AT + POST 1. 3.20 0. 0. 0. .00 ROUTED TO + ROUTE 0. 5.47 0. 0. 0. .00 + 758.42 6.07 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 763.69 763.69 STORAGE 0. 0. 0. OUTFLOW 0. 0. 0. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 10 1.00 758.42 .00 O. 0. .00 6.07 .00 *** NORMAL END OF HEC-1 *** 0 HydroPro for Windows- 1IN-6hr.ihl File Edit View Chart Run Options Help I ol�IolII 1� Input I Output Chart I Graph I Summary Table Data Table I HvdroaraohN Peak Flow Rate(C I Peak FlowDateffime Total Volumex1 POST 1 04 Dec 01. 1900 03:16 2 008 ROUTE 0 034 Dec 01, 1900 05:48 4 595 11 1-Inch Storm Summary Time Inflow Outflow (min.) (cfs) (cfs) Comment 0 0 0 4 0 0 023 S 0 0023 Omitted for Brevity 192 0 76S 0 023 196 1 04 0 024 Peak Inflow 200 0 S53 0 026 Omitted for Brevity 336 0 133 0 033 340 0 075 0 034 Peak Outflow 344 0 059 0 034 Omitted for Brevity 3S4 0 001 0 034 3SS 0 0 034 End Inflow 392 0 0 033 Omitted for Brevity 1996 0 0 015 2000 0 0 015 2004 0 0 015 Omitted for Brevity 2 996 0 0 009 3000 0 0 009 3004 0 0 009 Omitted for Brevity 3496 0 0 007 3500 0 0 007 3504 0 0 007 Omitted for Brevity 3996 0 0 005 4000 0 0 005 400-i 0 0 005 Omitted for Brevity 4012 0 0005 4016 0 0 005 4020 0 0 005 Omitted for Brevity 4:96 0 0 002 420C 0 0 002 4204 0 0 002 Omitted for Brevity 424S 0 0 001 4152 0 0 001 4256 0 0001 Omitted for Brevity 4316 0 0 4320 0 0 72 Hours 4324 0 0 12 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DAKOTA SALISBURY 2 ID 1 YEAR 24 HOUR STORM POST DEVELOPED 3 ID GEOSCIENCE GROUP, INC. 4 IT 3 0 0 3600 5 IN 5 0 0 6 IO 5 0 0 7 KK 8 PB 2.58 9 PI 0 0.001 0.001 0.001 0.0011 0.001 0.0011 0.001 0.0011 0.0011 10 PI 0.0011 0.0011 0.0011 0.0011 0.0012 0.0011 0.0012 0.0011 0.0012 0.0012 11 PI 0.0012 0.0012 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0013 0.0013 12 PI 0.0013 0.0013 0.0013 0.0013 0.0014 0.0013 0.0014 0.0014 0.0013 0.0014 13 PI 0.0014 0.0014 0.0014 0.0015 0.0015 0.0015 0.0015 0.0015 0.0015 0.0016 14 PI 0.0016 0.0016 0.0016 0.0017 0.0017 0.0016 0.0018 0.0017 0.0017 0.0018 15 PI 0.0018 0.0018 0.0018 0.0019 0.0019 0.0018 0.002 0.0019 0.0019 0.002 16 PI 0.002 0.002 0.002 0.0021 0.0021 0.0021 0.0021 0.0021 0.0021 0.0022 17 PI 0.0022 0.0022 0.0024 0.0024 0.0026 0.0026 0.0028 0.0029 0.0029 0.003 18 PI 0.0032 0.0032 0.0032 0.0032 0.0032 0.0032 0.0033 0.0034 0.0036 0.0038 19 PI 0.0039 0.0041 0.0044 0.0046 0.0048 0.0051 0.0054 0.0058 0.0062 0.0066 20 PI 0.007 0.0077 0.0086 0.0096 0.0106 0.0115 0.0238 0.0476 0.0764 0.1371 21 PI 0.0951 0.019 0.0166 0.0144 0.0122 0.0098 0.0084 0.008 0.0074 0.0068 22 PI 0.0064 0.006 0.0056 0.0054 0.0052 0.0048 0.0046 0.0044 0.0042 0.004 23 PI 0.0038 0.0037 0.0036 0.0035 0.0034 0.0034 0.0033 0.0033 0.0032 0.0031 24 PI 0.003 0.003 0.0029 0.0028 0.0027 0.0027 0.0026 0.0026 0.0025 0.0024 25 PI 0.0023 0.0023 0.0022 0.0023 0.0022 0.0022 0.0022 0.0021 0.0021 0.0021 26 PI 0.0021 0.002 0.002 0.002 0.0019 0.002 0.0019 0.0019 0.0018 0.0018 27 PI 0.0018 0.0018 0.0017 0.0018 0.0017 0.0017 0.0016 0.0017 0.0016 0.0016 28 PI 0.0015 0.0016 0.0015 0.0015 0.0015 0.0014 0.0014 0.0014 0.0013 0.0014 29 PI 0.0013 0.0013 0.0013 0.0013 0.0013 0.0012 0.0013 0.0013 0.0012 0.0013 30 PI 0.0012 0.0013 0.0012 0.0013 0.0012 0.0012 0.0013 0.0012 0.0012 0.0012 31 PI 0.0012 0.0012 0.0012 0.0012 0.0012 0.0011 0.0012 0.0012 0.0011 0.0012 32 PI 0.0011 0.0012 0.0011 0.0012 0.0011 0.0011 0.0012 0.0011 0.0011 0.0011 33 PI 0.0011 34 KK POST 35 KM POST DEVELOPED 36 KO 21 37 BA 0.0028 38 LS 0 89.68 39 UD 0.05 40 KO 21 41 KK ROUTE 42 RS 1 ELEV 757.75 43 SV 0 0.06 0.07 0.12 0.18 0.23 0.27 0.31 0.32 44 SE 756.25 757.75 758 759 760 761 762 763 763.69 45 SQ 0 0.023 0.027 0.046 0.811 1.345 1.722 2.032 2.222 16.151 46 SE 756.25 757.75 758 759.21 760 761 762 763 763.69 764.78 47 KO 21 48 ST 764.78 4 3 1.5 49 ZZ 1***************************************** *************************************** * * * * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 12AUG24 TIME 14:14:15 * * (916) 756-1104 * * * ***************************************** *************************************** DAKOTA SALISBURY 1 YEAR 24 HOUR STORM POST DEVELOPED GEOSCIENCE GROUP, INC. *** ERROR *** SPECIFIED START AND END DATES RESULT IN TOO MANY TIME PERIODS 6 IO OUTPUT CONTROL VARIABLES 13 IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 3 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 2000 NUMBER OF HYDROGRAPH ORDINATES NDDATE 5 0 ENDING DATE NDTIME 0357 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .05 HOURS TOTAL TIME BASE 99.95 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 34 KK * POST * * ************** 36 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 34 KK * POST * * ************** 40 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 41 KK * ROUTE * * ************** 47 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE 14 IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 2000 LAST ORDINATE PUNCHED OR SAVED TIMINT .050 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + 0. .00 0. 0. 0. .00 HYDROGRAPH AT + POST 5. 10.05 0. 0. 0. .00 ROUTED TO + ROUTE 1. 10.40 0. 0. 0. .00 + 759.78 10.40 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION ROUTE (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. 0. 0. OUTFLOW 0. 16. 16. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 759.78 .o0 0. 1. .00 10.40 .00 *** NORMAL END OF HEC-1 *** 0 HydroPro for Windows- 1YR.24Post.ihl File Edit View Chart Run Options Help J DIu1:IoIal j_tj ' lid Input I Output Chart I Graph I Summary Table Data Table I HvdroaraohN_. Peak Flow Rate(C I Peak FlowDateiTime [Total Volumexl I POST 4 726 Dec 01. 1900 10 06 10 26 ROUTE 0 6 Dec 01. 1900 1027 12 48 15 1 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 2 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 PH 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.06 0.07 0.12 0.18 0.23 0.27 0.31 0.32 29 SE 756.25 757.75 758 759 760 761 762 763 763.69 30 SQ 0 0.023 0.027 0.046 0.811 1.345 1.722 2.032 2.222 16.151 31 SE 756.25 757.75 758 759.21 760 761 762 763 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF OCS 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 12AUG24 TIME 14:43:50 * * (916) 756-1104 * * * ***************************************** *************************************** DKOTA SALISBURY POST-DEVELOPED 2 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS 16 ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 6 KK * RAIN * ************** 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 20 KK * POST * ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 25 KK * MAIN * * ************** 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 17 ************** * * 25 KK * MAIN * * * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 25 KK * MAIN * * * ************** 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + RAIN O. .00 0. O. 0. .00 HYDROGRAPH AT + POST 7. 12.07 1. O. 0. .00 ROUTED TO + MAIN 1. 12.38 0. O. 0. .00 + 760.64 12.40 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. O. 0. OUTFLOW 0. 16. 16. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 760.64 .o0 0. 1. .00 12.40 .00 *** NORMAL END OF HEC-1 *** 18 © HydroPro for Windows-6hrPost.ihl File Edit View Chart Run Options Help o Iritho(aI J J Input I Output Chart Graph II Summary Table Data Table I Hvdrooraohll Peak Flow Rate(C Peak FlowDate/Tme Total Volumexl... RAIN 0 0 Dec 01 1900 00 01 0.0 POST 7 184 Dec 01 1900 12 05 14.526 MAIN 1 151 Dec 01, 1900 12.24 12.043 19 1 HEC-1 INPUT PAGE 1 LINE ID 1 2 3 4 5 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 10 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 PH 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 KM 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.06 0.07 0.12 0.18 0.23 0.27 0.31 0.32 29 SE 756.25 757.75 758 759 760 761 762 763 763.69 30 SQ 0 0.023 0.027 0.046 0.811 1.345 1.722 2.032 2.222 16.151 31 SE 756.25 757.75 758 759.21 760 761 762 763 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF OCS 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 12AUG24 TIME 14:52:10 * * (916) 756-1104 * * * ***************************************** *************************************** DKOTA SALISBURY POST-DEVELOPED 10 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS 20 TOTAL TIME BASE 29.98 HOURS ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 6 KK * RAIN ************** 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** 20 KK * POST * * ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 25 KK * MAIN * * ************** 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 21 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 25 KK * MAIN * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 25 KK * MAIN * * * ************** 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + RAIN 0. .00 0. O. O. .00 HYDROGRAPH AT + POST 10. 12.07 1. O. 0. .00 ROUTED TO + MAIN 2. 12.38 1. O. 0. .00 + 763.01 12.38 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. 0. 0. OUTFLOW 0. 16. 16. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 763.01 .00 0. 2. .00 12.38 .00 *** NORMAL END OF HEC-1 *** 22 Q HydroPro for Windows-6hrPost.ihl File Edit View Chart Run Options Help D lcat'lolaI ' Al Input I Output Chad I Graph I Summary Table Data Table HvdrooraohN Peak Flow Rate(C... I Peak FlowDate/Tme Total Volumex1..j RAIL I 0 0 Dec 01. 1900 00:01 0.0 POST 10 167 Dec 01, 1900 12:05 23.747 MAIN 2 034 I Dec 01, 1900 12:24 20.852 23 1 HEC-1 INPUT PAGE LINE ID 1 2 3 4 5 6 7 8 9 10 1 ID DKOTA SALISBURY 2 ID POST-DEVELOPED 50 YEAR - 24 HOUR STORM 3 ID GEOSCIENCE GROUP, INC. 4 IT 1 0 0 1800 5 IO 5 0 0 6 KK RAIN 7 KM 1 YEAR 8 KM 0 0 0.384 0.767 1.31 1.51 1.61 1.95 2.29 2.73 9 KM 2 YEAR 10 KM 0 0 0.455 0.914 1.58 1.83 1.94 2.34 2.76 3.3 11 KM 10 YEAR 12 KM 0 0 0.583 1.18 2.23 2.61 2.79 3.38 4.01 4.8 13 KM 25 YEAR 14 KM 0 0 0.642 1.3 2.56 3.04 3.28 3.98 4.76 5.7 15 KM 50 YEAR 16 PH 0 0 0.681 1.37 2.8 3.36 3.65 4.45 5.35 6.41 17 KM 100 YEAR 18 KM 0 0 0.716 1.44 3.04 3.67 4.01 4.93 5.96 7.13 19 KO 21 20 KK POST 21 BA 0.0028 22 LS 89.68 23 UD 0.05 24 KO 21 25 KK MAIN 26 KO 21 27 RS 1 ELEV 757.75 28 SV 0 0.06 0.07 0.12 0.18 0.23 0.27 0.31 0.32 29 SE 756.25 757.75 758 759 760 761 762 763 763.69 30 SQ 0 0.023 0.027 0.046 0.811 1.345 1.722 2.032 2.222 16.151 31 SE 756.25 757.75 758 759.21 760 761 762 763 763.69 764.78 32 KO 21 33 KM INSIDE TOP LID OF OCS 34 ST 764.78 4 3 1.5 35 KO 21 36 ZZ 1***************************************** *************************************** * FLOOD HYDROGRAPH PACKAGE (HEC-1) * * U.S. ARMY CORPS OF ENGINEERS * JUN 1998 * * HYDROLOGIC ENGINEERING CENTER * VERSION 4.1 * * 609 SECOND STREET * * * DAVIS, CALIFORNIA 95616 * RUN DATE 12AUG24 TIME 15:07:09 * * (916) 756-1104 * * * ***************************************** *************************************** DKOTA SALISBURY POST-DEVELOPED 50 YEAR - 24 HOUR STORM GEOSCIENCE GROUP, INC. 5 IO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IT HYDROGRAPH TIME DATA NMIN 1 MINUTES IN COMPUTATION INTERVAL IDATE 1 0 STARTING DATE ITIME 0000 STARTING TIME NQ 1800 NUMBER OF HYDROGRAPH ORDINATES NDDATE 2 0 ENDING DATE NDTIME 0559 ENDING TIME ICENT 19 CENTURY MARK COMPUTATION INTERVAL .02 HOURS TOTAL TIME BASE 29.98 HOURS 24 ENGLISH UNITS DRAINAGE AREA SQUARE MILES PRECIPITATION DEPTH INCHES LENGTH, ELEVATION FEET FLOW CUBIC FEET PER SECOND STORAGE VOLUME ACRE-FEET SURFACE AREA ACRES TEMPERATURE DEGREES FAHRENHEIT *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 6 KK * RAIN * ************** 19 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 20 KK * POST * * ************** 24 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS VALUE EXCEEDS TABLE IN LOGLOG .01667 .01667 24.00000 *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * 25 KK * MAIN * * ************** 26 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** 25 ************** * * 25 KK * MAIN * ************** 32 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** *** ************** * * 25 KK * MAIN * * * ************** 35 KO OUTPUT CONTROL VARIABLES IPRNT 5 PRINT CONTROL IPLOT 0 PLOT CONTROL QSCAL 0. HYDROGRAPH PLOT SCALE IPNCH 0 PUNCH COMPUTED HYDROGRAPH IOUT 21 SAVE HYDROGRAPH ON THIS UNIT ISAV1 1 FIRST ORDINATE PUNCHED OR SAVED ISAV2 1800 LAST ORDINATE PUNCHED OR SAVED TIMINT .017 TIME INTERVAL IN HOURS 1 RUNOFF SUMMARY FLOW IN CUBIC FEET PER SECOND TIME IN HOURS, AREA IN SQUARE MILES PEAK TIME OF AVERAGE FLOW FOR MAXIMUM PERIOD BASIN MAXIMUM TIME OF OPERATION STATION FLOW PEAK AREA STAGE MAX STAGE + 6-HOUR 24-HOUR 72-HOUR HYDROGRAPH AT + RAIN 0. .00 0. O. O. .00 HYDROGRAPH AT + POST 12. 12.07 1. O. 0. .00 ROUTED TO + MAIN 10. 12.12 1. 0. 0. .00 + 764.26 12.12 1 SUMMARY OF DAM OVERTOPPING/BREACH ANALYSIS FOR STATION MAIN (PEAKS SHOWN ARE FOR INTERNAL TIME STEP USED DURING BREACH FORMATION) PLAN 1 INITIAL VALUE SPILLWAY CREST TOP OF DAM ELEVATION 757.75 764.78 764.78 STORAGE 0. O. 0. OUTFLOW 0. 16. 16. RATIO MAXIMUM MAXIMUM MAXIMUM MAXIMUM DURATION TIME OF TIME OF OF RESERVOIR DEPTH STORAGE OUTFLOW OVER TOP MAX OUTFLOW FAILURE PMF W.S.ELEV OVER DAM AC-FT CFS HOURS HOURS HOURS 1.00 764.26 .o0 0. 10. .00 12.12 .00 *** NORMAL END OF HEC-1 *** 26 0 HydroPro for Windows - 6hrPost.ihl File Edit View Chart Run Options Help J_o *0ld►1 J JJ Input I Output chart 1 Graph I Summary Table Data Table I HvdrooraohN Peak Flow Rate(C... ( Peak FlowDateRme [Total Volumex1... RAIN 0.0 Dec 01. 1900 00:01 0.0 POST 12.447 Dec 01, 1900 12:05 33.889 MAIN 9.504 Dec 01, 1900 12:08 31.305 27 Primary Spillway Deadman Calculations Unit Weight Concrete (lbs/ft3) = 145 Unit Weight Water(lbs/ft3) = 62.4 Invert Riser 756.20 Inside Control Box roof 763.75 Hydraulic Head (ft.) 7.55 Outside Dimension of Square Riser(ft.) 5.0 Area (ft2) 25 Factor of Safety 1.25 Bouyant Force (lbs.) 11,778 Bouyant Force with F.S.(lbs.) 14,722 Deadman Thickness (ft.) 2.0 Deadman Dimension - Square (ft.) 9.44 Use 9 ft. 28 Outlet Pipe Project Description Friction Method Manning Formula Solve For Full Raw Capacity Input Data Roughness Coefficient 0.012 Channel Slope 0.005 ft/ft Normal Depth 24.0 in Diameter 24.0 in Discharge 17.33 cfs Results Discharge 17.33 cfs Normal Depth 24.0 in Row Area 3.1 ft' Wetted Perimeter 6.3 ft Hydraulic Radius 6.0 in Top Width 0.00 ft Critical Depth 18.0 in Percent Full 100.0 Si, Critical Slope 0.006 ft/ft Velocity 5.52 ft/s Velocity Head 0.47 ft Specific Energy 2.47 ft Froude Number (N/A) Maximum Discharge 18.64 cfs Discharge Full 17.33 cfs Slope Full 0.005 ft/ft Raw Type Subcritical GVF Input Data Downstream Depth 0.0 in Length 0.0 ft Number Of Steps 0 GVF Output Data Upstream Depth 0.0 in Profile Description N/A Profile Headloss 0.00 ft Average End Depth Over Rise 0.0% Normal Depth Over Rise 0.0% Downstream Velocity 0.00 ft/s Upstream Velocity 0.00 ft/s Normal Depth 24.0 in Critical Depth 18.0 in Channel Slope 0.005 ft/ft Critical Slope 0.006 ft/ft Bereey Systems.Inc. Rao-sled Methods Sdtaa, itouM star llr6sed1 sn8 Center 110 03 00.031 9.1,2023 27 Sternal Company Orne Salle 200 W page 1 d I Watertown.CT 0679S USA.1-203.755-1666