Loading...
HomeMy WebLinkAboutNCC242540_Site Plan or Location Map_20240820 TECHNICAL REVIEW COMMITTEE (TRC) COVER SHEET Check as Appropriate: City of Greensboro IV \ (Revised July 1, 2020) Water Resources Department F City of Greensboro LANDSCAPE,TREE CONSERVATION APPROVAL AND INSPECTION: COLLECTION SYSTEM EXTENSION PERMIT APPROVAL au HUFFiNE MILL RD Mailing Address: PO Box 3136, Greensboro NC 27402-3136 To request an inspection or a pre-construction meeting contact the �� Office Address: 300 W Washington Street, Room UG-10 City Arborist at 336-373-2150 -n Greensboro NC r Project Origin: City Private Pi Questions? Please contact Rachel McCook at Rachel.McCook©greensboro-nc.gov 3 A LANDSCAPE PLAN (which depicts the plant types and locations) must be 2 or submitted to the Planning Department for review and approval WITHIN 90 DAYS OF Type of Project: City Owned Privately Owned T 336 373 7784 RECEIVING A BUILDING PERMIT. The Landscape Plan must be approved before rn TYPE: FEBPLAN REVIEW installation of plant material. Portions Public and Privately Owned a Site Plan Nonresidential $1400+$20 per 1000 sf gross floor area ;3 V SITE A Site Plan Multifamily $1400+$25 per unit The required LANDSCAPE PLANT MATERIAL must be installed and inspected PRIOR Per Article 21 of Chapter 143 of the North Carolina General o Preliminary Subdivision $1400+$40 per lot to receiving a Certificate of Occupancy. Statues, as Amended, and Other Laws, Rules and Regulations, o Revisions to Approved Plan $260+the per lot, square footage or unit fee Permission is hereby granted by the City of Greensboro, a delegated > ;0 applied to anyincrease The required TREE PROTECTION FENCING must be installed and inspected PRIOR m Pp to land disturbance. A permitting authority approved by the North Carolina Environmental "Site Specific Development Plan Approval to Obtain a Zoning Vested Right": Management Commission, for the construction and operation of the p Applicable review fee above + $1140 if site is < 1 acre; + $1335 if acre to collection system depicted on these plans and throughout the The required TREE CONSERVATION & REFORESTATION AREAS(s) must be inspected> 5 acres; or $1525 if 5 acres or more. permitting PRIOR to receiving a Certificate of Occupancy. process. Landscape/Tree Conservation fees are payable prior to scheduling for TRC action. Landscape Plan if submitted separately:$40 Tree Land Disturbance Permit:$40 WATERSHED APPROVAL AND INSPECTION City of Greensboro and its staff are not responsible for errors in guRLiNGTotA RD Tree/Land calculations, drawings or statements, or finding and correcting VICINITY MAP NO SCALE Tree Protection/Landscaping Inspection or Reinspection:$70 each (Questions? Contact Water Resources Engineering at 336-373-2055) any errors or deficiencies submitted by applicants or their consultants, Please go to http&//secure.greeneboro-nc.gov/plerxQbad/ and disclaim any liability for errors, in accordance with North Carolina I (Construction Plans Review Stamps) boo to submit a plan for review. X A FINAL PLAT dedicating the DMUE and access easements must be recorded General Statute 130A-26.2. Any person who knowingly makes any false Q rn Review turn around forget is 10 working days, for each cycle. PRIOR to receiving a Certificate of Occupancy. statement, representation, or certification in any application or design W eL o Construction of the WATER QUALITY DEVICE (2 BIO-CELLS, 1 SANDFILTER, & 1 POND) documents shall be guilty of a Class 2 misdemeanor, which may include Please use Design Review Checklist to ensure your plan is complete: > z - : ,';',-- must ? must be complete and the a fine not to exceed $10,000 per violation. W j Ci ce MM�� htto://www.areensboro-nc.gov/home/showdocument.aspx.documentid=7661 IX <Z �o X "Engineer's Certification of Completion sent to the Water Resources Department W p z-N ..o W Project Summary(Completed by Design Agent): PRIOR to receiving n Certificate of Occupnncy W (1 1 viz o OF Any sediment that enters the Pond during the construction must be removed Permittee shall be responsible for adherence to all conditions of the City of - V/ A R o w 3 a o Site Street Addresses(All): 168 FLEMINGFIELD ROAD PRIOR to issuance of a Certification of Occupancy. tL,'S Q N Greensboro Water Resources Department as Checked. W W o x-v� o FLEMINGFIELD RESERVE Wastewater Collection System Extension Master Permit (Public) N I j o O L.Project Name: FLOODPLAIN APPROVAL v z _ u =T Z N W g PRELIMINARY PLAN (Questions? Contact Water Resources En ineering IL at 336-373-2055) IL w z Q 0 C.Project Description: Individual Wastewater Collection System Extension Permit (Private) Iv V LL o g p z o® Elevation Certification Required Z W 2 n z w c9 `"_ D.Type(s)of PIM Site Plan Group Development Plan TRC Lite: Flood lain Development Permit Required Win -In cc z Ngz p p q Any significant changes (size, type, connections, length, alignment, etc) to 5 ,,S'l Preliminary Subdivision X Site Specific Plan(Zoning Vested Right) J =N LAND ACOUISI11ON AND DEVELOPMENT SERVICES,LLC that approved on the these plans or permitting documents shall be reviewed IL v o m3m E.Owner/Appkant and approved by the City of Greensboro prior to Construction. (55 dmichaels.windsorcompanies.com (336)207-8003 AIRPORT AIR OPERATION AREA ALTERNATIVE STORMWATER CONTROL: = 6 3 Email Phone dew (Questions? Contact Water Resources Engineering at 336-373-2055) WATER 2.156 L.F. X$1.50= $ 3.234.00 a F.Design Agent HUGH CREED ASSOCIATES,INC,PAApproved by: ;Cityof Greensboro hcaahu This development is within 5 statute miles of Piedmont Triad International PP SEWER 2159 L.F. x$1.50= $ 3.238.50 Email ghereedassociates.com Phone (336)275 9826 Airport air operation area. For such projects, according to Session Law G.Also Report Commends to 2012-200, the NCDEQ North Carolina Best Management Practice Manual COG Permit # WRCS00: Approval Date: RDWY. 1.535 L.F. X$1.50= $ 2.302.50 Ernuil Phone provides acceptable alternative Stormwater control measures other than wet TOTAL $ 8.775.00 ponds or those that promote standing water. The design engineer has reviewed H.Tract Acres 32.436±Ac I. Zoning District: R-5 ,i Zoning Overlay: these alternatives. ® ROADWAY TO BE PRIVATELY INSP T K.Watershed: S.BUFFALO CR. L.Current Use: SF ( � u11NGFIELD ROAD) M.Proposed Use: SUBDIVISION SOIL EROSION CONTROL: _ DATE FEE(S)RECEIVED BY CITY OF GREENSBORO N.Parking Required: N/A Proposed (Questions? Con fact Erosion Control Officer at 336-373-2030) Completion of this Statement is required with submittal of Engineering CITY OF GREENSBORO REQUIREMENTS FOR ISSUANCE OF"FINAL CO' I.3 �`�' 99 Watershed Pond Construction or Surety/ Improvement Guarantee Required Construction Drawings SUBMIT COPY OF RECORDED OPERATION AND MAINTENANCE AGREEMENT. O.i of Lots Now: Proposed p q AGREEMENT MUST REFERENCE OPERATION AND MAINTENANCE PLAN FOR SGM** FINANCIAL RESPONSIBILITY ACKNOWLEDGMENT(Engineering Conslrucflon) 2. SUBMIT COPY OF RECORDED EASEMENT PLAT. P.Multifamily Development:#of Units Total: N/A - PLAT MUST REFERENCE OPERATION AND MAINTENANCE AGREEMENT FOR 5CM** WATER RESOURCES CONSTRUCTION APPROVAL: B. SUBMIT SIGNED AND SEALED ENGINEER'S CERTIFICATION. By typo-Apartments Townhomes Condominiums 4. SUBMIT SURVEYED ILT"OF 5GM. IS to provide a one-year warranty 5. FINAL INSPECTION TO BE PERFORMED PERFORMED BY CITY OF GREENSBORO Open Space(Reel Projects)Required N/A Proposed (Questions? Contact Water Resources Engineering at 336 373 2055) to guarantee the public improvement from failure due to faulty workmanship WATER RESOURCES DEPARTMENT R.Non-Res'l Gross Floor Area(GFA),by et *Permit application fees required before construction plans are released. or materials. Once the project is complete, this individual or corporation will Existing -To Be Demolished Water System* be required to sign a notarized agreement. Upon completion and return of this agreement, they will receive a final acceptance letter and the year This Watershed Plan and/or Site Plan,Preliminary +Proposed = Total Resulting GFA State Water Permit Required warranty will begin. The City of Greensboro will not release bonds or accept Subdivision,Group Development was APPROVED by the S.Built-Upon Area(BUA),by sf/ac and X of lot: public infrastructure for maintenance without a final inspection. Technical Review Committee on . Existing 24,827 SF -To Be Demolished 24,827 SF Outside City - Utility Agreement and Annexation Petition Required 441,259 SF Sanitary Sewer System* TRC approval represents the maximum possible development of the site. +Proposes = Total Resulting BUA 441,259SF/10.130AC. Other approvals (including Construction Plans Review) could T.Wtibuiding(s)besprinked? 1-:= No X 31.23X State Water Sewer System Permit Required Signature of Financial Responsibility (Individual or Corporation) reduce the amount of development possible on this site. U.BiAc*g occupancy code under the Building Code N/A Outside City - Utility Agreement and Annexation Petition Required Address: Conformance with this Approved Plan is your respon*Wty. Any change in land use, lot lines, building location, Stormwater Management/Watershed Information: Telephone: parking, drives, utility lines, landscaping, etc. must Stormwater Control/Improvements(s): 2 BIO-CELLS,1 POND,AND 1 SANDFILTER ENGINEERING CONSTRUCTION APPROVAL: be resubmitted for review and approval PRIOR to such Maximum Amount of BUA Allowed Per Stormwater (Questions? Contact Development Services/Engineering at 336-373-2052) change being made. POND#1 BIO-CELL#2 SAND FILTER#3 BIO-CELL#4 *Engineering Inspection Fees required before construction plans are released. Per Land Development Ordinance Sections 30 4 15.8 and MAX.BUA=4.599 AC.MAX.BUA=0.808 AC.MAX.BUA=0.977 AC.MAX.BUA=3.179 AC. P DA=8.318 AC DA=1.482 AC DA=1.871 AC DA=6.639 AC Utility Construction Plan Approval Required* 30-4-17.5, in general this Approval expires in 2 years. Control Design:(55.3X BUA) (54.5%BUA) (52 2%BUA) (47.9X BUA) Site Plans: Approval also expires if construction or Pavement Cut Permit May be Required* Revision to Plan in Process development activity is begun and then discontinued for a Distance to Nearest Floodway: )2000 FEET Revision Summary Revision Date Revised by period greater than 180 days. Roadway Construction Plans Required* Preliminary Subdivision: Approval also expires if a final plat On-site soil types(s): EnB,EnC,EnD,Ch,Wh _ is not recorded within 2 years, or if there is a lapse of more Storm Sewer System - Permit Required to tie into Storm Sewer System than 2 years between the recordings of phases or section. Hydrology groups(s): TYPE C - Driveway Culvert Inspection Required This Approval covers site design only.Separate application, review, Amount of site to be disturbed: 22.15±Ac. approval and/or permits are required for signs, construction TRANSPORTATION APPROVAL:(Questions? Contact COOT at 336-373-GDOT) plans, building plans, final plats or anything other than site EXISTING BUILT-UPON AREA ON SITE,PRIOR TO DEVELOPMENT: 24,821 SF(0.510 AC) design. PROPOSED BUILT-UPON AREA NOT TREATED BY BIO-CELLS: 10.130 AG-F.563 AG = 0.561 AC) Driveway permit issued? Number g DRAINAGE AREA AND BUILT-UPON AREA ALLOCATION CHART: BIO-DELL *Do Not Issue Building Permit until any required Driveway Permit has been issued. I EROS CONT 2023-1131 ON-SITE DA OFF-SITE DA TOTAL DA "TOTAL BUA %BUA MAX DA MAX BUA Revision to Approved Plan (Tracking IF) TRC#2022-0610 POND#1 8.318 AG. 0 AG. 8.318 AG. 4.5GG AG. 55.3% 8.318 AG. 4.59G AG. X City of Greensboro Driveway Permit Required Revision Summary Revision Date Approved (Clerk of the TRC) (Date) (Tracking #*) BIO-DELL#2 1.482 AG. 0 AG. 1.482 AG. 0.808 AG. 54.5% 1.482 AG. 0.808 AG. X N.C. Department of Transportation Driveway Permit Required by/Date *Agent: Add Case # Prior to Resubmittal SND FLTR#3 1.811 AG. 0 AG. 1.811 AG. 0.911 AG. 52.2% 1.811 AG. 0..111 AG. BIO-CELL#4 0.404 AG. 0.235 AG. 6.63G AG. 3.119 AG. 41.9% 6.639 AG. 3.11G AG. SUBDMSION APPROVAL: (Clerk of the TRC) (Date of Approval of TOTALS 18.015 AG. 0.235 AG. 18.310 AG. .1.563 AG. 52.23% 18.310 AG. .1.563 AG. A Final Plat Must Be Recorded Prior to TRC Approval of this Submittal or Minor Revision or *(ALL BOA 15 Prior to Issuance of a Building Permit (PB: Pg: ) I Re-approval) ONSITE)