Loading...
HomeMy WebLinkAboutSW6230603_Design Calculations_20240816 (6) Aberdeen US 15-501 DG Infiltration Basin SCS curve number Hydraulic Soil Group: A Area SCS CN Building(sf) 10,640 98 Sidewalk(sf) 98 Pavement(sf) 23,377 98 Pond(sf) 98 Open space(sf) 28,801 69 Offsite-open space(sf) 69 Offsite-impervious(sf) 3,734 98 Total(sf) 66552 85 Total(ac) 1.53 Rational Coefficient Pre-development Post-development Area C Area C Building(sf) 0.95 Building(sf) 10,640 0.95 Sidewalk(sf) 0.95 Sidewalk(sf) 0.95 Pavement(sf) 0.95 Pavement(sf) 23,377 0.95 Open space(sf) 62,818 0.30 Pond(sf) 0.95 Offsite-open space(sf) 2,709 0.40 Open space(sf) 28,801 0.30 Offsite-impervious(sf) 1,025 0.95 Offsite-open space(sf) 0.30 Offsite-impervious(sf) 3,734 0.95 Total(sf) 66552 0.31 Total(ac) 1.53 Total(sf) 66552 0.67 Total(ac) 1.53 1938-Runnoff coefficient calcs.xls Printed 8/16/2024