Loading...
HomeMy WebLinkAboutSW6230603_O&M Agreement/Plan_20240816 Operation & Maintenance Agreement Project Name: Aberdeen US 15-501 Dollar General Project Location: Hoke County, NC Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s)on this project include (check all that apply&corressanding O&M sheets will be added automaticall : Infiltration Basin Quantity: I Location(s): southeast corner Infiltration Trench Quantity:- Location(s): Bioretention Cell Quantity:- Location(s): Wet Pond Quantity:- Location(s): Stormwater Wetland Quantity:- Location(s): Permeable Pavement Quantity: Location(s): Sand Filter Quantity:- Location(s): Rainwater Harvesting Quantity:_ Location(s): Green Roof Quantity:- Location(s): Level Spreader- Filter Strip Quantity:- Location(s): Proprietary System Quantity:_ Location(s): Treatment Swale Quantity: 1 Location(s): southern side of .ro•ert Dry Pond Quantity:_ Location(s): Disconnected Impervious Surface Present: No Location(s): User Defined SCM Present: No Location(s): Low Density Present: No Type: I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Jamie S Encinosa Title & Organization: EVP of Operations -Rhetson Companies, Inc Street address: 2075 Juniper Lake Road City, state, zip: West End, NC 28376 Phone number(s): 910-944-0881 Email: permits@rhetson.com Signature: (elam Date: l 1, c o` - ON-£'SC.cTh , a Notary Public for the State of N prAkn Cox E t nn, County of 1-� �,r rn��t" , do hereby certify that AVU��� S , E-fr n oSet,, personally appeared before me this 5" day of c_ and acknowledge the due execution of the Operations and Mai ance A reement . J Witness my hand and official seal, %' D. Oz °. 0o ‘4. I. € +v ,y ,,,AU B to OLj Seal My commission expires t \ I 0 I- a oa—4— STOR M-EZ 1/5/2023 Version 1.5 O&M Agreement Page 1 of 1 infiltration Basin Maintenance Requirements Important operation and maintenance procedures _ The drainage area will be carefully managed to reduce the sediment load to the infiltration b No portion of the infiltration basin will be fertilized after the initial fertilization that is required to establish the - vegetation. Lime may be allowed if vegetation is planted on the surface of the infiltration basin and a soil test shows that it is needed. - The vegetation in and around the basin will be maintained at a height of four to six inches After the infiltration basin is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches(or 1.5 inches if in a Coastal County). Records of operation and maintenance shall be kept in a known set location and shall be available upon request ection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire infiltration Trash/debris is basin present. Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, and/or erosive gullies plant ground cover and water until it is established. The grass filter strip have formed. Provide lime and a one-time fertilizer application. or other pretreatment Sediment has Search for the source of the sediment and remedy the area accumulated to a problem if possible. Remove the sediment and depth of greater than dispose of it in a location where it will not cause three inches. impacts to streams or the SCM. Unclog the conveyance and dispose of any sediment The structure is in a location where it will not cause impacts to The flow diversion clogged. p structure (if streams or the SCM. applicable) The structure is Make any necessary repairs or replace if damage is damaged. too much for repair. The inlet pipe is Unclog the pipe and dispose of any sediment in a clogged (if location where it will not cause impacts to streams or The inlet pipe is cracked or otherwise Repair or replace the pipe. damaged(if applicable) The inlet device Erosion is occurring in Regrade the swale if necessary and provide erosion the swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future erosion problems. Stone verge is Remove sediment and clogged stone and replace clogged or covered in with clean stone. sediment(if applicable) More than four inches Search for the source of the sediment and remedy the of sediment has problem if possible. Remove the sediment and accumulated. dispose of it in a location where it will not cause impacts to streams or the SCM. Erosion of the basin Provide additional erosion protection such as The basin surface has occurred reinforced turf matting or riprap if needed to prevent or riprap is displaced. future erosion problems. Water is standing Replace the top few inches of soil to see if this more than three days corrects the standing water problem. If not, consult an after a storm event. appropriate professional for a more extensive repair. Infiltration Basin Maintenance Requirements;(continued). SCM element: Potential problem: How to remediate the problem: Shrubs or trees are growing on the Remove shrubs and trees immediately. embankment. The embankment An annual inspection by an appropriate professional shows Make needed repairs immediately. that the embankment needs repair. Clogging has Clean out the outlet device and dispose of sediment in a location where it will not cause impacts to occurred. The outlet device streams or the SCM. The outlet device is Repair or replace the outlet device. damaged Erosion or other signs of damage have Repair the damage and improve the flow dissipation occurred at the outlet. structure. The receiving water Discharges from the infiltration basin are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water. Treatment Swale Maintenance Requirements Important operation and maintenance procedures: The drainage area of the grassed swale will be carefully managed to reduce the sediment load to the grassed swale. After the initial fertilization to establish the grass in the swale, fertilizer will not be applied to the treatment swale. The grassed swale will be inspected quarterly. Records of operation and maintenance shall be kept in a known set location and shall be available upon request. .ection activities shall be performed as follows.Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: Trash/debris is present Remove the trash/debris. Regrade the soil if necessary to remove the gully, re- Areas of bare soil sod (or plant with other appropriate species)and water and/or erosive gullies until established. Provide lime and a one-time have formed. fertilizer application. Sediment covers the grass at the bottom of Remove sediment and dispose in an area that will not the swale. impact streams or SCMs. Re-sod if necessary. The entire length of Vegetation is too short Maintain grassed vegetation such that the swale or the swale vegetated area does not erode during the peak flow or too long. from the 10-year storm Determine the source of the problem: soils, Grass is dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if necessary. Remove the trees and woody vegetation from the Trees and/or other woody vegetation are present in treatment swale, regrade the treatment swale if necessary the treatment swale and re-establish grass as shown on the approved plans Clogging has Clean out the outlet device. Dispose of the sediment occurred. of site. The outlet device (if applicable) The outlet device is damaged Repair or replace the outlet device. Erosion or other signs of damage have Repair the damage and improve the flow dissipation occurred at the outlet. structure. The receiving water Discharges from the treatment swale are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receiving water.