Loading...
HomeMy WebLinkAbout090041_Routine Inspection_20240801for Visit: oRoutine O O Referral Date of Visit: / Arrival Time: Departure Time: D, tJpj� Farm Name: (� L//, /� Z e-(" COwner Name: -! Fez a, .Z- /-C Mailing Address: Physical Address: Facility Contact: YSJ91t'C�hTitle: �r Onsite Representative: Certified Operator: //1 Back-up Operator: Location of Farm: Latitude: Owner Email: Phone: Assistance O Other O Denied Access Phone: Integrator: J Region: / 4 Certification Number: 1a/,/)1(�, Certification Number: Longitude: Dischar¢es and Stream Impacts 1. Is any discharge observed from any part of the operation? ❑ Yes fVo ❑ NA ❑ NE Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? ❑ Yes ❑ No ❑ NA ❑ Yes ❑ No ❑ NA ❑ NE ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes E�No ❑ NA ❑ NE Page I of 3 511212020 Continued Facili Number: Date of Inspection: e Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes Vo ❑ NA ❑ NE LLr- a. If yes, is waste level into the structural freeboard? ❑ Yes ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): -� Observed Freeboard (in): t� 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes AE No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes 0 No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes -®' No ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [3 No ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes _0 No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes jallo ❑ NA ❑ NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes J:aNo ❑ NA ❑ NE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): �, �fcU lcot �t✓ O 13. Soil Type(s): 14. Do the receiving crops differ from t ose designated in the CAWMP? ❑ YesiETNo ❑ NA ❑ NE 15. Does the receiving crop and/or land application site need improvement? ❑ Yes _4. !r No ❑ NA ❑ NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes Q-No ❑ NA ❑ NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes -❑ No ❑ NA ❑ NE 18. Is there a lack of properly operating waste application equipment? ❑ Yes �No ❑ NA ❑ NE Required Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? ❑ Yes .0'No ❑ NA ❑ NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check ❑ Yes E'No ❑ NA ❑ NE the appropriate box. ❑WUP ❑Checklists ❑Design ❑Maps ❑ Lease Agreements ❑Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. EKes ❑ No ❑ NA ❑ NE ❑ Waste Application ❑ Weekly Freeboard _,elVaste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ,Monthly and V Rainfall Inspections ,Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes 0'No ❑ NA ❑ NE 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes _j2rNo ❑ NA ❑ NE Page 2 of 3 511212020 Continued Facili Number: jDate of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes e[j No ❑ NA ❑ NE 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �No ❑ NA ❑ NE the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail to provide documentation of an actively certified operator in charge? ❑ Yes -2'No ❑ NA ❑ NE 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes �No ❑ NA ❑ NE Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document []Yes JEJ-No ❑ NA ❑ NE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes .f�fNo ❑ NA ❑ NE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes -EfNo ❑ NA ❑ NE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes Ea"No ❑ NA ❑ NE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes qEj'�o ❑ NA ❑ NE 33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes E�'No ❑ NA ❑ NE 34. Does the facility require a follow-up visit by the same agency? ❑ Yes E3/No ❑ NA ❑ NE 14Zhark A) Xele Reviewer/Inspector Name: Reviewer/Inspector Signature: Page 3 of 3 Phone: (q10 Date: ( t/OIL/ 511212020 racmty NO, O /�_ Time In Cy F&cir„2 Time Out Farm Name / Owner Integrato° — Operator • Site Rep, Back-up _ ) No. No. HOC Circfe: General or NPDES FREEBOAMW. vesign Sludge Survey Observed 1 % Calibration/GPM Crop Yield Rain Gauge V ynn 1 o Waste Transfers I Rain Breaker Soil Test Wettable Acres PLAT _ Weekly Freeboard ._(Z!:� Daily Rainfall --f_�-.. 1-in inspections Spray/Freeboar Drop Weather Codes 120 min inspections Waste Analyses, Date Nitrogen (N) Date , Nitrogen (N) -.Za I_1g3 Dace xz,/ III �l /