HomeMy WebLinkAbout090099_POA High Freeboard_20240809PLAN OF ACTION (POA) FOR HIGH FREEBOARD A7 ANIMAL FACILITIES
i_ County:
LiU (Q
Facility Namec I, FIY11skev :
'U-- t
CertilleldOperator Name.
V t
Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways, and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons vdth spillways. . .
operator o
Structure 1 Structure 2 Structure 3 Structure 4 Structure 6 Structure 6
Lagoon Name/identifier((D):_ i _ y
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges.
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day
Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected in section III tables. Included within this plan Is a list of the
proposed sites with related facility number(s), number acres and receiving crop information.
Contact and secure approval frond the Diivision of Water Quality arlor to transfer of waste --
to a site not covered in the ffacllity's certified animal waste management plan.
Operation will be partially or fully depopulated.
- attach a complete schedule with corresponding animal units and dates for depopulation
- if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: ffl to l a�
i Thereby certify that i have reviewed the information listed above and included within the attached [plan
of Action, and to the best of my knowledge and ability, the Information is accurate and eorreet.
In
i(TO W 1?i111[DDS Phone: (9(0)ZW4
facility Owne Manager (print)
Date: .
S 19 1 4
aclllty OwnertManager (signature)
PoA Cover Paaa 2121100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Billup Finishing
line In = 73.5 lb PAN
2.
Structure ID:
line m =
lb PAN
3.
Structure ID:
line m =
lb PAN
4.
Structure ID:
line m =
lb PAN
5.
Structure ID:
line in =
lb PAN
Structure -ID:---
6
- ---- line hif -
Ib PAN- - --
n.lines 1+2+3+4+5+6=
73.5 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract#
p. field #
q. crop
r. acres
s. ransimng IRR-2
PAN balance
(Ibla e)
t. TOTAL PAN
BALANCEFOR
FIELD (Ibs.)
miumn rxs
u.applicajwwindvx'
1566
1
bermuda
6.02
50.00
301.0
March -Oct
1566
3
bermuda
2.47
50.00
123.5
March -Oct
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 424.5 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w.
Total PAN to be land applied (line n from section II) =
73.5 lb.
PAN
x.
Crop's remaining PAN balance (line v from section III) =
424.5 lb.
PAN
y.
Overall PAN balance (w -x) =
-351 lb.
PAN
y must showas a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
rpulation,herd reduclion,etc. Forpump&haulandherd reduction options, recalculate newPANbasedonnew
nation. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balan
and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
nation regarding the herd population and lagoon freeboard levels at the receiving facility.
NARRATIVE:
will begin pumping as soon as field conditions allow.
PoA (30 Day) 2121/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
1. Structure Name/identifier (ID):
113111up Finishing
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 16.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 3.0 inches
d. top of dike surface area according to design
urea at below structural freeboard elevation) 47280 ft2
e. line c/12 x line d x 7.48 gallons/ft3 88414 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 52748.7 ft3
h. current herd # 1600 certified herd # 1600
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
1. current waste analysis dated 9/15/23
m. ((lines e + kY1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
52749 ft3
Oft3
27580 ft3
100143 gallons
0.39 Ibs/1000 gal.
73.5 Ibs. PAN
PoA (30 Day) 2/21 /00