Loading...
HomeMy WebLinkAbout090209_POA for High freeboard_20240808Facility Certified Operator Name. Ba County: oyoerrator o 1750 Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Structture 9 Structure 2 Structure 3 Structure 4 Structure 5 Structure a Laboon Name/identifier (ID): t Spillway (Yes or No): Level (inches): ((1 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. V/ Liquid level is within the 25 year24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section ill tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Oorntact and secuee approval from tree Division of Water Quality torior to traFnsfer ®f unseats= to a site not covered Bri the iFacilaty's cert%fried) animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: �6 110) aq 6 hereby certify that l have revliewed the inlarmation listed above and included within the attached Plan of Action, and to the beat of my knowledge and abiliity9 the informraation is accurate and correct, �( llJi t�lrtll "i1i t - Phone: l�I (0) Facility Owns imanager (print) Date: - I91aq Owner/Manager (signature) POA cover Page 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Billups Nursery line m = 115.6 lb PAN 2. Structure ID: line In = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN Ib PAN 6. Structure ID: — --line —m-- — n.lines1+2+3+4+5+6= 115.6 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_ o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Illacre) t. TOTAL PAN BALANCEFOR FIELD (Ibs.) column r x s u. application window' Un —1 lbermudagrass 12.60 75.00 945.0 March -Oct * uestimates on remain PAN - onIv oumped a few times on bermuda 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 945.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 115.6 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 945.0 lb. PAN y. Overall PAN balance (w - x) _ -829 lb. PAN ymust showas a deficit. If line y does not show as a deficit, list course of action here including pump and haul, 1pulation, herd reduction, etc. Forpump & haul and herd red uction options, recalculate new PAN based on new nation. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN bale in and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide nation regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: will begin pumping as soon as field conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER RU T 1. Structure Name/ldenti ier (ID): Billups Nursery 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 24.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 26.0 inches c. line b - line a (inches in red zone) = 2.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 56376 ft� e. line c/12 x line d x 7.48 gallons/ft3 70282 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 4 687 ft3 h. current herd # 6400 certified herd # 6400 actual waste produced = current herd # x line g = 46887 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 9/15J23 m. ((lines e + k}11000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 30976 ft3 37521 ft3 143845 gallons 0.54 Ibs/1000 gal. 115.6 Ibs. PAN PoA (30 Day) 2/21/00