Loading...
HomeMy WebLinkAbout090040_POA High Free board_20240808'LAVA OF ACTPON (G ON FOR MGM FREEBOARD AT ANNAL FACUTES Facility Number-. county: Facility Name l� � 14 A)A % .. Certified operator Name: platu 17—4/� iG -,j DS1v ��tGlC+���S Operator# IL' 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways, Structure 1 Lagoon Name/Identifier (ID): Spillway (yes or No): Level (inches): 2. Check all applicable items �— Structure 2 Structure 3 Structure 4 Structure s Structure a Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to Pumped and hauled is reflected in section III tables. Included within this plan is a list of the Proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality 2ri2r to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - freeboard levels and herd population for the receiving facility if animals are to be moved to another permitted facility, provide facility number, lagoon 3. Earliest possible date to begin land application of waste:�� I hereby certify that I have reviewed the information listed above and included within the attached; Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. 1 b5 I�itQar� ��� ' �L(P 'ZUjI'2• Facalaty 4r/Manager (print) tludeenPhone: d (signature) Date. - Cover Page 2121100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): A & H Hog Farm.9-40 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design 12.0 inches 19.0 inches 7.0 inches 102856 ft2 448795 gallons 180 days 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = 121058 ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 6/26/24 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) �ft3 62270 ft3 228549 gallons 1.88 Ibs/1000 gal. 1273.4 Ibs. PAN PoA (30 Day) 2/21/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 0 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: n.lines 1+2+3+4+5+6= o. line n / 27154 = line I = 227243 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 227243 gallons 8.37 acre-inct III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD' 2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type S. crop t. acres u. remaining IRR-2 PAN balance (Iblacre) v. maximum application rate (in/hr) W. maximum application amount 3235 1 NoA bermuda hay 7.65 227.00 0.5 1 3235 2 NoA bermuda hay 11.34 290.00 0.5 1 x. total acres available during 5 day draw down (sum of column Q = 18.99 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE PoA (5 Day) 2/21/00 Y. line o = 0.44 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation Fields are drying out and pumping asfield conditions allow. 2. Date and amount of last rainfall event? DATE: 08/09/24 AMOUNT:-Dinches - Dates of last waste application event per field - last week 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at approprate seasonal i.e. winter application rates within 5 da ? Pumping asfields dryout. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to fields dryout, will try to pump. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD 1. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): I A&HHog Farm 2. Current liquid volume in structural freeboard a. current liquid level according to marker 9.0 inches b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during drawdown period f. temporary storage period according to structural design 12.0 inches 3.0 inches 102856 ft2 192341 gallons ,a 01 days g. volume of waste produced according to structural design 121058 ft3 h. current herd # 3672 certified herd # 3672 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down 1. total volume to be land applied line e + line k = 121058 ft3 �ft3 14175 ft3 28098 gallons 220439 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21 /00