Loading...
HomeMy WebLinkAboutSW6231203_Plansheet - SCM Detail_20240813 GEOTEXTILE FABRIC EL — 164.5' UNDER RIP RAP � TEMPORARY DRAINAGE \ — EL = 163.5' (TOP OF ROCK) TEMPORARY DRAINAGE zo CHANNEL #3 o TEMPORARY ■.� \ o\ CHANNEL #1, z � � � � SKIMMER BASIN #1 � 6"� CLASS B � \ \ \ \ '� c> c, COMPACTED > RIP RAP 6 DIAMETER RIP RAP FILL OD v SLOPE ° o o > APRONS AT AREAS OF o 3: 1 15, ��� z CONCENTRATED FLOW ` �. �. �� - D EL = 160.0 COMPACTED g'> o o m NATIVE SOIL 50 WETLAND AND STREAM BUFFER; NATIVE SOIL TO REMAIN UNDISTURBED \1 A EMBANKMENT SPILLWAY CROSS SECTION EL — 164.5 \ \ BAFFLES , ° , s COMPACTED COMPACTED LO \ ,6" DIAMETER RIP RAP FILL FILL N O � \ \ \ �. � I ' ° + \ APRONS AT AREAS OF s� \ M t / \ \ CONCENTRATED FLOW SCH 40 PVC 4" 0 IMMER a \ 2.00" OR ICE EL = 163.5' PI W Y 0 BA FLES o � \ (TOP OF ROCK) M; z 6"0 CLASS B RIP RAP \\ c \ EMBANKMENT SPILLWAY PROFILE VIEW DISTURBANCE \ \ SPILLW Y s / LIMIT AND SILT 26 � j 1 's O o FENCE ALONG ` 60 'sue m 50 OFFSET DISTURBANCE ' 'a° SKIMMER BASIN #1 FROM WETLANDS \ ' LIMIT AND SILT °� EMBANKMENT SPILLWAY DETAILS SPILLWAY FENCE ALONG 50 OFFSET \ N.T.S. 'a TEMPORARY DRAINAGE FROM WETLANDS INSTALL CULVERT rn CHANNEL #3 \\V OUTLET PROTECTION AT SKIMMER PIPE OUTLET INSTALL CULVERT \ (SEE SHEET CG502 FOR �5 \ ° a a , GEONDERI RIP RAPLE � OUTLET PROTECTION AT � EL = 161.5 .��'t •�••"""�••.. � '� SKIMMER PIPE OUTLET / � DETAILS) � , � �5/ � I — EL = 160.5 (TOP OF ROCK) \ �6 (SEE SHEET CG502 FOR SIL FENCE < TEMPORARY DETAILS OUT ET SKIMMER BASIN 6"� CLASS B 056748 SILT FENCE \ � 01 COMPACTED ✓ ��, z RIP RAP � s Z OUTLET ° \ FILL '�. ................G1NE...• ° SLOPE •9•.FN � ' I � 3: 1 � �i G�i TEMPORARY DRAINAGE� CHANNEL #2 EL 157.0 COMPACTED o NATIVE SOIL C o8 2023 SCH 40 PVC 4" � KIMME � O / � (1.25" 0 IFICE) �� °o � ' NATIVE SOIL M CN CN CN C N N N N N N O O O O O O LLI N N N N N N EMBANKMENT SPILLWAY CROSS SECTION o " 00 / N N \ \ MPORARY DRAINAGE / O N O O 00 O CHANNEL #4 � o EL\ 161.5 c� zz zzzz \ \ \ \ \ \ ) J J J J J J wI I \ / ofq \ \ J N $� 50' WETLAND AND STREAM BUFFER; � \ COMPACTED COMPACTED �`' 0 0 o TO REMAIN UNDISTURBEDJ� �l C14 N 30 15 7.5 0 30 30 15 7.5 0 30 FILL FILL N O O \� o r� 0000 = O O 1 -30' 1 -30' EL 160.5r o \ - - = Pi W Y �, (TOP OF ROCK) z z z SKIMMER BASIN #1 PLAN VIEW SKIMMER BASIN #2 PLAN VIEW 6"0 CLASS B RIP RAP z o M o 0 O 0 o 0 0 C/) N � � � SCALE: 1" = 30' SCALE: 1" = 30' EMBANKMENT/SPILLWAY PROFILE VIEW of 0 < N O O O SKIMMER BASIN #2 o w cn o EMBANKMENT/SPILLWAY DETAILS Inw J w w Q U Q Q u- w � � V) O SKIMMER BASIN #1 DETAILS SKIMMER BASIN #2 DETAILS N.T.S. w DESCRIPTION # DESCRIPTION # DESCRIPTION # DESCRIPTION # � � z Z z z BOTTOM ELEVATION 160.0 SURFACE AREA (FT )2 3432 BOTTOM ELEVATION 157.0' SURFACE AREA (FT )2 5435 USE COIR FIBER z BAFFLES POOL ELEVATION 163.0' STORAGE VOLUME (FT )3 7306 POOL ELEVATION 160.0' STORAGE VOLUME (FT )3 20958 EMERGENCY SPILLWAY OUTLET PIPE LENGTH EMERGENCY SPILLWAY OUTLET PIPE LENGTH SUPPORT POST, ELEVATION 163.5 SCHEDULE 40 PVC BARREL 40.0 ELEVATION 160.5 SCHEDULE 40 PVC BARREL 49.0 SUPPORT ROPE TO 24 INTO BOTTOM 00 1645 WIRE TO PREVENT OR SIDE STAKE TO SUPPORT TOP OF BANK ' OUTLET PIPE INLET INVERT ELEV. � TOP OF BANK 1615� OUTLET PIPE INLET INVERT ELEV. � SAGGING7 WIRE � . . . . ELEVATION @ SKIMMER DEWATERING DEVICE 160 ELEVATION @ SKIMMER DEWATERING DEVICE 157 � J OUTLET PIPE OUTLET INVERT ELEV. OUTLET PIPE OUTLET INVERT ELEV. Q Z U) SIDE SLOPE RATIO 3H: 1 V @ LOW END 158.5 SIDE SLOPE RATIO 3H: 1 V @ LOW END 156.5 N Q SKIMMER ORIFICE PLATE 0 SKIMMER ORIFICE PLATE 0 ~ Q SPILLWAY WIDTH 9.0 1.25 SPILLWAY WIDTH 25.0 2.00 0? < W FOR 3 DAY DRAW DOWN FOR 3 DAY DRAW DOWN m N I z COIR MESH, STAPLED OR W H TRENCHED INTO BOTTOM OR SIDE N J Q ~*MAINTENANCE* J � 00 INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REPAIRS w J w IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF THE BAFFLES a C� COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT z DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN z AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE o CONTRIBUTING DRAINAGE HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND a- 0 UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE AND STABILIZE IT. DRAWN BY: REA BAFFLE DETAIL CHECKED BY: LRH APPROVED BY: LRH N.T.S. DATE: 08/04/2023 SCALE: I AS SHOWN REFERENCES FILE NUMBER: 12548SCG CONSTRUCTION SEQUENCE, LEGEND, AND NOTES..................CGO02 SHEET: CG400