HomeMy WebLinkAboutSW3240704_Supplement-EZ Form_20240805 SUPPLEMENT-EZ COVER PAGE
LOAD SUPPLEMENT FORMS
PROJECT INFORMATION
1 Project Name Hidden Estates
2 Project Area(ac) 12.06
3 Coastal Wetland Area(ac) 0
4 Surface Water Area(ac) 0
5 Is this project High or Low Density? Low
6 Does this project use an off-site SCM? No
COMPLIANCE WITH 02H.1003(4)
7 Width of vegetated setbacks provided(feet) 15
8 Will the vegetated setback remain vegetated? Yes
9 If BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A
10 Is streambank stabilization proposed on this project? No
NUMBER AND TYPE OF SCMs:
11 Infiltration System
12 Bioretention Cell
13 Wet Pond
14 Stormwater Wetland
15 Permeable Pavement
16 Sand Filter
17 Rainwater Harvesting(RWH)
18 Green Roof
19 Level Spreader-Filter Strip(LS-FS)
20 Disconnected Impervious Surface(DIS)
21 Treatment Swale 2
22 Dry Pond
23 StormFilter
24 Silva Cell
25 Bayfilter
26 Filterra
LOAD SUPPLEMENT FORMS
DESIGNER CERTIFICATION
27 Name and Title: Nathan Wright,PE
28 Organization: Thomas&Hutton
29 Street address: 1020 Euclid Avenue
30 City,State,Zip: Charlotte,NC 28203
31 Phone number(s): 980-201-5528
32 Email: wright.nathan@tandh.com
Certification Statement:
I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the
information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans,
specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here.
Designer
1011III11two
( C\ ( '% tuof0 THOMAS •
& HUTTON _ esigner
SEAL _ = ENGINEERING
050698 CO.
05-13-2024 - • No. F-0871
•
�9 `Z` ��` ii ATE OF AuI"
�NN WR`G���`� ��'���mnnnm111�� 05-13-2024
Seal Date
DRAINAGE AREAS
1 Is this a high density project? No
2 If so,number of drainage areas/SCMs _ 0
3 Does this project have low density areas? _ Yes
4 If so,number of low density drainage areas _ 1
Is all/part of this project subject to previous rule
5 versions? No
FORMS LOADED
DRAINAGE AREA INFORMATION Entire Site LD 1
4 Type of SCM N/A N/A
5 Total drainage area(sq ft) 525334 _ 525334
6 Onsite drainage area(sq ft) 65597 65597
7 Offsite drainage area(sq ft) 7143 7143
8 Total BUA in project(sq ft) 67150 sf 67150 sf
New BUA on subdivided lots(subject to
9 permitting)(sq ft) 50000 sf 50000 sf
New BUA not on subdivided lots(subject to
10 permitting)(sf) 17150 sf 17150 sf
11 Offsite BUA(sq ft) N/A N/A
12 Breakdown of new BUA not on subdivided lots:
-Parking(sq ft) N/A N/A
-Sidewalk(sq ft) N/A N/A
-Roof(sq ft) N/A N/A
-Roadway(sq ft) N/A N/A
-Future(sq ft) N/A N/A
-Other,please specify in the comment box
below(sq ft) N/A N/A
New infiltrating permeable pavement on
13 subdivided lots(sq ft) N/A N/A
New infiltrating permeable pavement not on
14 subdivided lots(sq ft) N/A N/A
Existing BUA that will remain(not subject to
15 permitting)(sq ft) N/A N/A
16 Existing BUA that is already permitted(sq ft) N/A N/A
17 Existing BUA that will be removed(sq ft) N/A N/A
18 Percent BUA 13% 13%
19 Design storm(inches) N/A N/A
20 Design volume of SCM(cu ft) N/A N/A
21 Calculation method for design volume N/A N/A
ADDITIONAL INFORMATION
Please use this space to provide any additional information about the
22 drainage area(s):
LOW DENSITY
DESIGN REQUIREMENTS FOR LOW DENSITY PROJECTS FROM 02H.1003(11
1 Is project below density thresholds set forth in the applicable stormwater rule? Yes
2 Does project maximize dispersed flow and minimize channelization of flow? Yes
3 Has the use of piping been minimized per.1003(2)(c)? Yes
4 Side slopes of the vegetated conveyances(H:V) 5:1,3:1
5 Maximum velocity in the vegetated conveyances during the 10-year storm? 4.06
6 Are curb outlet swales proposed? No
7 Maximum longitudinal slope of curb outlet swale(s)(%)
8 Bottom width of curb outlet swale(s)(feet)
9 Maximum side slope of curb outlet swale(s)(H:V)
10 Minimum length of curb outlet swale(s)(feet) _
11 Are treatment swales used instead of curb outlet swales?
12 Is stormwater released at the edge of the setback as dispersed flow? Yes
13 Have stormwater outlets been designed to prevent downslope erosion? Yes
14 Are variations to rule.1003 proposed? No
ADDITIONAL INFORMATION
15 Please use this space to provide any additional information about this low density project:
Drainage Pervious
Swale BUA Q Slope Vano. V,m„i Flow depth
# Area area
(ac) (cfs) (%) (fps) (fps) (ft)
(ac) (ac)
1 0.91 0.16 0.75 0.60 4.56 4.45 5.00 4.06 0.53
2 0.34 0.11 0.23 0.60 1.70 4.55 5.00 3.28 0.36
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
2