HomeMy WebLinkAboutSW3240704_Plansheet - Misc. Detail_20240805 (2) a
1.25 LB./LINEAR FT.STEEL POSTS
TAMP SOIL BL FILTER FABRIC Mgk�M M
OVER Ma
r
/ ANKET ,o
c
HEAVY DUTY PLASTIC TIE
BACKFILL TRENCH WITH
FOR STEEL POSTS
ef
X�� COMPACTED EARTH
ROLL SOD IMMEDIATELY TO ACHIEVE FIRM CONTACT WITH THE SOIL.
�xx\\������� SODDING - LAY SOD IN A STAGGERED PATTERN. BUTT THE
a ������������� STRIPS TIGHTLY AGAINST EACH OTHER. DO NOT LEAVE SPACES AND WATER TO A DEPTH OF 4" AS NEEDED WATER WELL AS SOON AS THE SOD IS LAID.
DO NOT OVERLAP. A SHARPENED MASON'S TROWEL IS A HANDY F
TOOL FOR TUCKING DOWN THE ENDS AND TRIMMING PIECES. MOW WHEN THE SOD IS ESTABLISHED - IN 2 - 3 WEEKS, SET THE MOWER HIGH (211-311)
M �� �� A„
z �xx�� SHOOTS OR GRASS BLADES/ -
�� GRASS SHOULD BE GREEN� �12 �j �j � � ° BUTTING - ANGLED ENDS AND HEALTHY
V�\/ USE EITHER FLAT-BOTTOM BURY FABRIC
CORRECT CAUSED BY THE AUTOMATIC SOD
OR V-BOTTOM TRENCH
CUTTER LY BE MATCHED SHOWN BELOW
THATCH - GRASS z
INGS
> AND DEAD LEAVES,LUPPTO /2" THICK
�� � RooT zoNE - SOIL AND ROOTS SILT FENCE INSTALLATION
INCORRECT
SHOULD BE I/2" TO 3/4" THICK, WITH FILTER FABRIC FILTER FABRIC
��� �� DENSE ROOT MAT FOR STRENGTH
MIN. 4" SPECIFICATIONS
OVERLAP V� V� o
� ���' SOD INSTALLATION EARTH
OF-z EARTHCOMPACTED z
H �X��y I. IF FEASIBLE, SOD SHOULD NOT BE LAID IN EXCESSIVELY WET 5. AS SODDING IS COMPLETED, SOD SHOULD BE ROLLED OR TAMPED zTt
OR DRY WEATHER TO PROVIDE FIRM CONTACT BETWEEN ROOTS AND SOIL. 00 N RUNOFF 0
2. DURING PERIODS OF HIGH TEMPERATURE, OR IF THE SOIL IS DRY, 6. AFTER ROLLING, SOD SHOULD BE IRRIGATED TO A DEPTH RUNS - i-
ef THE SOIL SHOULD BE LIGHTLY IRRIGATED IMMEDIATELY PRIOR SUFFICIENT THAT THE UNDERSIDE OF THE SOD PAD AND THE Z Z -
��A TO LAYING THE SOD. SOIL 4" BELOW THE SOD IS THOROUGHLY WET. �_ Z m
3. THE FIRST ROW OF SOD SHOULD BE LAID IN A STRAIGHT LINE ESTABLISHMENT AND MAINTENANCE OF SOD - a10 Z a0 Z
WITH SUBSEQUENT ROWS PLACED PARALLEL TO AND BUTTING -� -� ff
TIGHTLY AGAINST EACH OTHER. JOINTS SHOULD BE STAGGERED I. DURING THE FIRST 3 - 4 WEEKS WATERING SHOULD BE PERFORMED - ` '
TO PROMOTE MORE UNIFORM GROWTH AND STRENGTH AND TO AS OFTEN AS NECESSARY TO MAINTAIN MOIST SOIL TO A DEPTH OF
ISOMETRIC VIEW ��A�����A REDUCE THE CHANCE OF WASHOUTS UNDERNEATH THE SOD. AT LEAST 4 INCHES FILTER
// CARE SHOULD BE EXERCISED TO INSURE THAT SOD IS NOT FABRIC NOTES: / / STRETCHED OR OVERLAPPED AND THAT ALL JOINTS ARE 2. THE FIRST MOWING SHOULD NOT BE ATTEMPTED UNTIL THE SOD IS 4-IN. FILTER FABRIC
I SLOPE SURFACE SHALL BE FREE OF ROCKS BUTTED TIGHT IN ORDER TO PREVENT VOIDS WHICH WOULD CAUSE FIRMLY ROOTED, USUALLY 2 - 3 WEEK. THE MOWER SHOULD BE SET
CLODS, STICKS AND GRASS MATS / BLANKETS 4' DRYING OF THE ROOTS. SMALL GAPS OR VOIDS REMAINING AFTER HIGH (2 -3 INCHES) FOR THE FIRST MOWING. NO MORE THAN 1/3
OF THE SHOOT (GRASS LEAF) SHOULD BE REMOVED IN ANY
THE SOD IS LAID SHOULD BE FILLED WITH TOPSOIL
SHALL HAVE GOOD SOIL CONTACT 2. APPLY PERMANENT SEEDING BEFORE PLACING °� 4 PLACEMENT SHOULD BEGIN AT THE LOWER END OF SLOPES MOWING. FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL
AND CHANNELS ON SLOPES 3:1 OR GREATER, OR WHEREVER
BLANKETS. EROSION MAY BE A PROBLEM, SOD SHOULD BE SECURED BY 3. FERTILIZER SHOULD BE APPLIED, AS NECESSARY, TO OBTAIN AND
3 LAY BLANKETS LOOSELY AND STAKE OR STAPLE 12" PEGGING OR OTHER APPROVED METHODS. SOD SHOULD BE MAINTAIN THE DESIRED GROWTH AND DENSITY LIME SHOULD BE WHEN AND WHERE TO USE IT:
TO MAINTAIN DIRECT CONTACT WITH THE SOIL. ������������ ����� �% INSTALLED WITH THE LENGTH PERPENDICULAR TO THE SLOPE ADDED, AS NEEDED, TO MAINTAIN PROPER pH. SOIL SHOULD BE SILT FENCE IS APPLICABLE IN AREAS:
DO NOT STRETCH ��� ��������������� � (ON THE CONTOUR). TESTED EVERY I - 2 YEARS TO DETERMINE FERTILIZER AND LIME
4 BLANKETS MATTING/BLANKETLL BE BIODEGRADABLE EROSION CONTROL �� � � � � �� /� REQUIREMENTS. OR OVERLAND FLOWPATH LENGTHTOTHE FENCE
I E WHERE THE MAXIMUMS SLOPE STEEPNESS S(NORMAL[PERPENDICULAR]TO FENCE LINE) IS2HAV.
5 ALL SLOPES 6:1 OR GREATER AND ALL SWALES SHALL BE SODDING DETAIL THAT DO NOT RECEIVE CONCENTRATED FLOWS GREATER THAN 0.5 CFS.
STABILIZED WITH MATTING/BLANKET.
6 CONTRACTOR RESPONSIBLE FOR MAINTENANCE, REPAIR NOT TO SCALE DO NOT PLACE SILT FENCE ACROSS CHANNELS OR USE IT ASAVELOCITY CONTROL BMP.
AND/OR REPLACEMENT AS REQUIRED THROUGHOUT
CONSTRUCTION. MATERIALS:
STEEL POSTS NO. REVISIONS BY DATE
EROSION CONTROL MATTING USE 48-INCH LONG STEEL POSTS THAT MEET THE FOLLOWING MINIMUM PHYSICAL REQUIREMENTS:
CONSTRUCTION SPECIFICATIONS: COMPOSED OF HIGH STRENGTH STEEL WITH MINIMUM YIELD STRENGTH OF 50,000 PSI.
HAVE A STANDARD"T"SECTION WITH A NOMINAL FACE WIDTH OF 1.38-INCHES AND NOMINAL"T"LENGTH OF 1.48-INCHES.
NOT TO SCALE I. PLACE STONE TO THE LINES AND DIMENSIONS SHOWN IN THE PLAN ON A FILTER WEIGH 1.25 POUNDS PER FOOT(t 8%).
1,5' 2. KEBP 1 TH OUN CEDAERON.STONE SECTION AT LEAST 9-INCHES BELOW NATURAL HAVE A SOIL STABILIZATION PLATE WITH A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES ATTACHED TO THE STEEL POSTS. ``'���O�CH C 4RO� i,�i ,,,,, \A CAR,,,/,,,,,
PAINTED WITH A WATER BASED BAKED ENAMEL PAINT. FESS/p' ti �� �� 0�7
GROUND LEVEL WHERE THE DAM ABUTS THE CHANNEL BANKS. `��� ?•Q�0 N4� 9 '�� `.�`�O //i9 �.�'
3. EXTEND STONE AT LEAST 1.5-FT BEYOND THE DITCH BANKS TO KEEP USE STEEL POSTS WITH A MINIMUM LENGTH OF 4-FEET,WEIGHING 1.25 POUNDS PER LINEAR FOOT(t 8%)WITH PROJECTIONS TO T H 0 M A S
A 9 OVERFLOW WATER FROM UNDERCUTTING THE DAM AS IT RE-ENTERS THE AID IN FASTENING THE FABRIC. EXCEPT WHEN HEAVY CLAY SOILS ARE PRESENT ON SITE,STEEL POSTS WILL HAVE A METAL SOIL _ C = & HUTTON
MIN. CHANNEL. STABILIZATION PLATE WELDED NEAR THE BOTTOM SUCH THAT WHEN THE POST IS DRIVEN TO THE PROPER DEPTH,THE PLATE WILL BE _ A _ _ ENGINEERING
4. SET SPACING BETWEEN DAMS TO ASSURE THAT THE ELEVATION AT THE TOP BELOW THE GROUND LEVEL FOR ADDED STABILITY. _ 050698 _ _ co
o0 o OF THE LOWER DAM IS THE SAME AS THE TOE ELEVATION OF THE UPPER DAM. THE SOIL PLATES SHOULD HAVE THE FOLLOWING CHARACTERISTICS: 05-93-2024F�/. No F-0871
O O00 00 5. PROTECT THE CHANNEL DOWNSTREAM FROM THE LOWEST CHECK DAM, BE COMPOSED OF MINIMUM 15 GAUGE STEEL. FNGI E� � -'�
0°0000 Oo O O°O CONSIDERING THAT WATER WILL FLOW OVER AND AROUND THE DAM. HAVE A MINIMUM CROSS SECTION AREA OF 17-SQUARE INCHES. �i���L '' .., NE ,.• ' 9TF' ��o
FILTER OOoa�O D00000 6. MAKE SURE THAT THE CHANNEL REACH ABOVE THE MOST UPSTREAM DAM GEOTEXTILE FILTER FABRIC: ���� �&AN11W `� �'' OF
FABRIC 00 IS STABLE.
7. ENSURE THAT CHANNEL APPURTENANCES, SUCH AS CULVERT ENTRANCES FILTER FABRIC IS:
BELOW CHECK DAMS, ARE NOT SUBJECT TO DAMAGE OR BLOCKAGE FROM COMPOSED OF FIBERS CONSISTING OF LONG CHAIN SYNTHETIC POLYMERS COMPOSED OF AT LEAST 85%BY WEIGHT OF POLYOLEFINS,
A DISPLACED STONES. POLYESTERS, OR POLYAMIDES.
FORMED INTO A NETWORK SUCH THAT THE FILAMENTS OR YARNS RETAIN DIMENSIONAL STABILITY RELATIVE TO EACH OTHER.
UPSTREAM APRON WIDTH 1,5' FREE OF ANY TREATMENT OR COATING WHICH MIGHT ADVERSELY ALTER ITS PHYSICAL PROPERTIES AFTER INSTALLATION.
(3 x PIPE DIA OR 5' MIN) MAINTENANCE: FREE OF DEFECTS OR FLAWS THAT SIGNIFICANTLY AFFECT ITS PHYSICAL AND/OR FILTERING PROPERTIES. T H O M AS
1. INSPECT CHECK DAMS AND CHANNELS FOR DAMAGE AFTER EACH RUNOFF CUT TO A MINIMUM WIDTH OF 36 INCHES.
CLASS B EROSION EVENT. &
1.5' EQUAL 1.5' WASHED STONE CONTROL STONE 2. ANTICIPATE SUBMERGENCE AND DEPOSITION ABOVE THE CHECK DAM AND USE ONLY FABRIC APPEARING ON SCDOT APPROVAL SHEET#34 MEETING THE REQUIREMENTS OF THE MOST CURRENT EDITION OF THE
(12 TOP LAYER) EROSION FROM FLOWS AROUND THE EDGES OF THE DAM. CORRECT ALL SCDOT STANDARD SPECIFICATIONS FOR HIGHWAY CONSTRUCTION. H U T T O N
MIN. MIN. INSTALLED AT DAMAGE IMMEDIATELY. IF SIGNIFICANT EROSION OCCURS BETWEEN DAMS,
UPSTREAM FACE x INSTALL A PROTECTIVE RIPRAP LINER IN THAT PORTION OF THE CHANNEL. INSTALLATION:
TOP OF SLOPE 00o Q w
EXCAVATE A TRENCH APPROXIMATELY 6-INCHES WIDE AND 6-INCHES DEEP WHEN PLACING FABRIC BY HAND. PLACE 12-INCHES OF GEOTEXTILE
FILTER °� � °p� <'.• � 3. REMOVE SEDIMENT ACCUMULATED BEHIND THE DAMS AS NEEDED TO PREVENT
o 0 o / m z 1020 Euclid Avenue
FABRIC INTO THE 6-INCH DEEP TRENCH EXTENDING THE REMAINING 6-INCHES TOWARDS THE UPSLOPE SIDE OF THE TRENCH. BACKFILL THE
DAMAGE TO CHANNEL VEGETATION, ALLOW THE CHANNEL TO DRAIN THROUGH Charlotte,NC 28203 L 980.201.5505
FABRIC o� o0O000 o0O0o0 TRENCH WITH SOIL OR GRAVEL AND COMPACT. BURY 12-INCHES OF FABRIC INTO THE GROUND WHEN PNEUMATICALLY INSTALLING SILT FENCE WITH
�o�OO O��o°OO THE STONE CHECK DAM AND PREVENT LARGE FLOWS FROM CARRYING SEDIMENT
O O O O N ® OVER THE DAM. ADD STONES TO DAMS AS NEEDED TO MAINTAIN DESIGN WEIGHT A SLICING METHOD. PURCHASE FABRIC IN CONTINUOUS ROLLS AND CUT TO THE LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE www.thomasandhutton.com
DRAINAGE PIPE AND CROSS SECTION. NECESSARY,WRAPPED THE FABRIC TOGETHER AT A SUPPORT POST WITH BOTH ENDS FASTENED TO THE POST,WITH A6-INCH MINIMUM OVERLAP.
O SECTION A-A INSTALL POSTS TO A MINIMUM DEPTH OF 24-INCHES. INSTALL POSTS A MINIMUM OF 1-TO 2-INCHES ABOVE THE FABRIC,WITH NO MORE THAN
3-FEET OF THE POST ABOVE THE GROUND. SPACE POSTS TO MAXIMUM 6-FEET CENTERS.ATTACH FABRIC TO WOOD POSTS USING STAPLES MADE
w_ OF HEAVY-DUTY WIRE AT LEAST 1-1/2-INCH LONG, SPACED A MAXIMUM OF 6-INCHES APART. STAPLE A 2-INCH WIDE LATHE OVER THE FILTER FABRIC
TO SECURELY FASTEN IT TO THE UPSLOPE SIDE OF WOODEN POSTS. ATTACH FABRIC TO THE STEEL POSTS USING HEAVY-DUTY PLASTIC TIES
> RIP RAP THAT ARE EVENLY SPACED AND PLACED IN A MANNER TO PREVENT SAGGING OR TEARING OF THE FABRIC. IN CALL CASES,TIES SHOULD BE EROSION CONTROL DETAILS
AFFIXED IN NO LESS THAN 4 PLACES. INSTALL THE FAHEN NECESSARY,THE
TEMPORARY GRAVEL CHECK DAM THE FENCE ABOVE GROUND MAYBE GREATER THAN 24RI CHESNA MII INT MUM DAL AREAS, EXTRA SILT FENCEOF 24-INCHES ABOVE THEOHEIGHT/MAYBE REQUIRED. THE PIOST HOEIGHT
O O WILL BE TWICE THE EXPOSED POST HEIGHT. POST SPACING WILL REMAIN THE SAME AND EXTRA HEIGHT FABRIC WILL BE 4-,5-, OR 6-FEET TALL.
NOT TO SCALE LOCATE SILT FENCE CHECKS EVERY 100 FEET MAXIMUM AND AT LOW POINTS. INSTALL THE FENCE PERPENDICULAR TO THE DIRECTION OF FLOW AND
FINISHED GRADE PLACE THE FENCE THE PROPER DISTANCE FROM THE TOE OF STEEP SLOPES TO PROVIDE SEDIMENT STORAGE AND ACCESS FOR MAINTENANCE AND
NOTE: MINIMUM CLEANOUT. HIDDEN ESTATES
DEPTH SHOULD INSPECTION AND MAINTENANCE:
EQUAL 2.25 TIMES CHECK FOR SEDIMENT BUILDUP AND FENCE INTEGRITY. CHECK WHERE RUNOFF HAS ERODED A CHANNEL BENEATH THE
THE d50 DOWNSTREAM APRON WIDTH _ FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED BY FENCE OVERTOPPING. IF THE FENCE FABRIC TEARS, BEGINS TO
(La + PIPE DIAMETER) DECOMPOSE, OR IN ANY WAY BECOMES INEFFECTIVE, REPLACE THE SECTION OF FENCE IMMEDIATELY. REMOVE SEDIMENT ACCUMULATED
ALONG THE FENCE WHEN IT REACHES 1/3 THE HEIGHT OF THE FENCE, ESPECIALLY IF HEAVY RAINS ARE EXPECTED. REMOVE TRAPPED
END VIEW 2-FT. MIN. LEVEL BOTTOM SEDIMENT FROM THE SITE OR STABILIZE IT ON SITE. REMOVE SILT FENCE WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED OR PROJECT LOCATION:
1-FT. MIN. AFTER TEMPORARY BEST MANAGEMENT PRACTICES(BMPS)ARE NO LONGER NEEDED. PERMANENTLY STABILIZE DISTURBED AREAS RESULTING WEDDINGTON, NC
12" (TYP) GRASS OR =111-I FROM FENCE REMOVAL.
STABLE LINING -III-III -
_ l-lil-'lii='iiil l-hill 111 11 llil iii=lil-11 l SILT FENCE
FINISHED GRADE -III-III- 1ilI-III-III= CLIENT/OWNER:
-_--_-_-- 1 1 1=1 I- NOT TO SCALE
----- - ENCOMPASS BUILDING GROUP
RIP RAP TO TOP 12:1 OR
1016 WAXHAW/INDIAN TRAIL RD.
OF SLOPE
INDIAN TRAIL, NC 28104
FLATTER 843-540-3025
TUCK UNDER SOIL - 1.5-FT. MIN.
12" MIN. TYPICAL DRAINAGE PIPE 2-FT. MIN.
-� TEMP. SEDIMENT
WIRE CLOTH
FENCE 8._0..
SWALE SPACING = 100-FT., 200-FT., OR 300-FT., DEPENDING ON SLOPE
SECTION 1 0 5 1
77
INSTALLATION: IS" - 20" WASHED
THE BOTTOM WIDTH SHOULD BE A MINIMUM OF 2-FEET,AND THE BOTTOM SHOULD BE LEVEL. THE DEPTH SHOULD BE A MINIMUM OF #57 STONE
ONE LAYER OF FILTER FABRIC 1.5-FEET AND THE SIDE SLOPES SHOULD BE 2H:1V OR FLATTER. THE MAXIMUM GRADE SHALL BE 5%,WITH POSITIVE DRAINAGE TO A GRAPHIC SCALE:
SHALL BE PLACED PRIOR TO La SUITABLE OUTLET. SLOPES SHALL BE STABILIZED IMMEDIATELY USING VEGETATION, SOD,AND EROSION CONTROL BLANKETS OR TURF I INCH = I FEET
PLACEMENT OF RIPRAP, MIRIFI REINFORCEMENT MATS TO PREVENT EROSION. THE UPSLOPE SIDE OF THE SWALE SHOULD PROVIDE POSITIVE DRAINAGE SO NO CONSTRUCTION SPECIFICATIONS:
I. CONSTRUCT STONE OUTLET AT LOW POINT IN SILT FENCE
140N OR EQUAL EROSION OCCURS AT THE OUTLET. PROVIDE ENERGY DISSIPATION MEASURES AS NECESSARY. SEDIMENT-LADEN RUNOFF SHALL BE
2. PROVIDE FEET O BREAK IN SILT FENCE.
DIRECTED TO A SEDIMENT TRAPPING FACILITY. 3 PLACE 8-FEET OF WIRE CLOTH ACROSS OPENING WITH
SECTION
ADDITIONAL STAKE PLACED IN THE CENTER OF THE
INSPECTION AND MAINTENANCE: OPENING (AT 4-FEET) DATUM: HORIZ.: NC83F VERT.: NC83F
DAMAGE CAUSED BY CONSTRUCTION TRAFFIC OR OTHER ACTIVITY MUST BE REPAIRED BEFORE THE END OF EACH WORKING DAY. 4. PLACE 18" - 20" OF WASHED #57 STONE ACROSS
RIP RAP OUTLET OPENING. JOB N0: 295890000
aTDa TEMPORARY DIVERSION DITCH OR SWALE STONE OUTLET DATE: 3/14/24
STABILIZATION STRUCTURE DRAWN: KSC
DESIGNED: KSC
NOT TO SCALE NOT TO SCALE NOT TO SCALE REVIEWED: MSK EC1s2
APPROVED: NEW
RR-OSS
SCALE: I" = I'