Loading...
HomeMy WebLinkAboutSW6240706_Response To Comments_20240801 Jacob Dooley From: Peck, Kaitlin <kaitlin.peck@deq.nc.gov> Sent: Thursday,June 13, 2024 11:13 AM To: zach@veritas-rp.com;Jacob Dooley Cc: Farkas,Jim J;Joyner, Melissa; svc_post_construction_stormwater Subject: Dunn Commercial; Dunn, Harnett County CAUTION:This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and know the content is safe. Good Morning, We received your application for a new post-construction stormwater permit on 6/4/24. At this time,the submission is not administratively complete and cannot be accepted for review in its current condition. Please provide the following submittal items within 30 calendar days (by close of business on 7/13/24) so that we may accept the project and begin the review process, otherwise, the project will be returned as administratively incomplete.The sooner these items come in, the sooner they can go off to their technical review. • 2x hard copies of the Application with the following corrections made (These items are required per 15A NCAC 02H .1042(2)(a) and per Section VI, 1 of the Application): • Section III, 1—The purchaser is listed as "VRPRE, LLC" however,the purchase and sales agreement indicates that the purchaser is "VERDUC/DUNN, LLC". Please revise as needed. • 1x hard copy of official documentation showing that the Applicant is in good standing with the NC Secretary of State and showing the title and position information for the signing official (These items are required per 15A NCAC 02H .1040(1), .1042(2)(b), and per Section VI, 11 of the Application). • 1x hard copy of official documentation showing that the owner organization (Four W. Inc.) is in good standing with the Secretary of State and showing the title and position information for the signing official (These items are required per 15A NCAC 02H .1040(1) and per Section VI, 11 of the Application). • 2x signed &sealed hard copies of a plan sheet showing the following corrected additions: • Wetland delineation or a note on the plans stating that there are no wetlands located on-site.This item is required per 15A NCAC 02H .1042(2)(g)(iii) &Section VI, 8m of the Application. Please also list the name of the individual that made this determination in a note on the plans. NOTE:This is an administrative completeness review, not a detailed engineering review,there may be other issues that may be brough up during the engineering review. If these items are received within the stipulated timeframe,we can accept the project and begin the review process. Once accepted, reviews under the standard permitting process can take up to 90 calendar days per statute (one of our two reviewer positions is currently vacant). Hard copies should be mailed to the following address: i For USPS: Jim Farkas 1612 Mail Service Center Raleigh, NC 27699-1612 For FedEx/UPS: Jim Farkas 512 N. Salisbury Street, Office 640E Raleigh, NC 27604 If you have any questions, please contact Kaitlin Peck at post-construction@nc.deq.gov or at (919) 707-9209. Thank you, Kaitlin Peck Environmental Specialist Post-Construction Stormwater Permitting Group North Carolina Department of Environmental Quality postconstruction@deq.nc.gov 11.11)1E Q NORTH CAROLINA Department of Environmental Quality Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized state official. 2