Loading...
HomeMy WebLinkAboutSW3240702_Supplement-EZ Form_20240801 SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION � f 1 Project Name Performance Precast 2 Project Area(ac) 13.891 (Property Area 14.614 ac) 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 30'wide buffers for Intermittent and Perennial Streams 8 Will the vegetated setback remain vegetated? Yes _ If BUA is proposed in the setback,does it meet 9 NCAC 02H.1003(4)(c-d)? N/A Is streambank stabilization proposed on this 10 project? No !NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 0 13 Wet Pond 1 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting(RWH) 0 18 Green Roof 0 19 Level Spreader-Filter Strip(LS-FS) 0 20 Disconnected Impervious Surface(DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Kate Underwood,PhD,PE 28 Organization: Daylight Engineering 29 Street address: PO Box 1804 30 City,State,Zip: Concord,NC 28026-1804 31 Phone number(s): 980-234-7500 32 Email: kate@daylighteng.com Certification Statement: I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true, accurate,and complete;and that the engineering plans,specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. DI ` %%1 I 11 I I' () SEAL Signature of Designer n 7 033470 O7. G0.1GINti-o? ;, ////ry£w. 4) '//i111111111 ° Date DRAINAGE AREAS I Is this a high density project?[_ Yes 2 If so, number of drainage areas/SCMs 1 3 Does this project have low density areas? No 4 If so, number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No CLICK TO LOAD FORM DRAINAGE AREA INFORMATION I Entire Site I (Wet Pond) 4 Type of SCM n/a Wet Pond 5 Total drainage area (sq ft) 508,040 418,496 6 Onsite drainage area (sq ft) 508,040 418,496 7 Offsite drainage area (sq ft) 0 0 8 Total BUA in project(sq ft) 317,324 317,324 New BUA on subdivided lots (subject to 9 permitting) (sq ft) 0 0 New BUA not on subdivided lots (subject to _ 10 permitting) (sf) 317,324 317,324 11 Offsite BUA(sq ft) 0 0 12 Breakdown of new BUA not on subdivided lots: 317,324 317,324 - Parking (sq ft) 9,116 9,116 - Sidewalk(sq ft) 6,172 6,172 - Roof(sq ft) 39,770 39,770 - Roadway(sq ft) 0 0 - Future (sq ft) 0 0 - Other, please specify in the comment box below (sq ft) 262,266 262,266 New infiltrating permeable pavement on 13 subdivided lots (sq ft) n/a n/a New infiltrating permeable pavement not on 14 subdivided lots (sq ft) n/a n/a Existing BUA that will remain (not subject to 15 permitting) (sq ft) n/a n/a 16 Existing BUA that is already permitted (sq ft) n/a n/a 17 Existing BUA that will be removed (sq ft) n/a n/a 18 Percent BUA 62.46% 75.82% 19 Design storm (inches) 1 1 20 Design volume of SCM (cu ft) n/a 25,543 —Simple Method 21 1Calculation method for design volume n/a Runoff Volume ADDITIONAL INFORMATION 22 Please use this space to provide any additional information about The 262,266 sf of"Other" impervious area consists of the gravel lot, wash out pit, batch plant, concrete driveway entrance, and concrete slab around the building bay door entrances. WET POND 1 Drainage area number 1 2 Minimum required treatment volume (cu ft) 25543 cf GENERAL MDC FROM 02H .1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes 4 Is the SCM located away from contaminated soils? n/a 5 What are the side slopes of the SCM (H:V)? 3:1 Does the SCM have retaining walls, gabion walls or other 6 No engineered side slopes? 7 Are the inlets, outlets, and receiving stream protected from Yes erosion (10-year storm)? _ 8 Is there an overflow or bypass for inflow volume in excess of the Yes design volume? Drawdown Orifice 9 What is the method for dewatering the SCM for maintenance? & Pumping out bottom 2.5' of pond 10 If applicable, will the SCM be cleaned out after construction? _ Yes 11 Does the maintenance access comply with General MDC (8)? _ Yes 12 Does the drainage easement comply with General MDC (9)? Yes _ 13 If the SCM is on a single family lot, does (will?) the plat comply N/A with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC Yes (11)? 15 Is there an O&M Plan that complies with General MDC (12)? Yes 16 Does the SCM follow the device specific MDC? Yes 17 Was the SCM desi ned b an NC licensed rofessional? Yes WET POND MDC FROM 02H .1053 SA/DA and 18 Sizing method used Average Depth Method 19 Has a stage/storage table been provided in the calculations? Yes 20 Elevation of the excavated main pool depth (bottom of sediment 641.00 removal) (fmsl) _ 21 Elevation of the main pool bottom (top of sediment removal) 642.00 (fmsl) _ 22 Elevation of the bottom of the vegetated shelf(fmsl) 648.00 23 Elevation of the permanent pool (fmsl) 648.00 _ 24 Elevation of the top of the vegetated shelf(fmsl) 649.00 25 Elevation of the temporary pool (fmsl) 649.50 26 Surface area of the main permanent pool (square feet) 11365 27 Volume of the main permanent pool (cubic feet) 44801 cf 28 Average depth of the main pool (feet) 3.94 ft 29 Average depth equation used Equation 2 30 If using equation 3, main pool perimeter (feet) n/a 31 If using equation 3, width of submerged veg. shelf(feet) n/a 32 Volume of the forebay (cubic feet) 7953 cf 33 Is this 15-20% of the volume in the main pool? Yes (15.1%) _ 34 Clean-out depth for forebay (inches) 42 35 Design volume of SCM (cu ft) 26150 cf _ 36 Is the outlet an orifice or a weir? _ Orifice 37 If orifice, orifice diameter(inches) 2 in 38 If weir, weir height (inches) 18 in 39 If weir, weir length (inches) 180 in 40 Drawdown time for the temporary pool (days) 4.08 41 Are the inlet(s) and outlet located in a manner that avoids short- Yes _ circuiting? 42 Are berms or baffles provided to improve the flow path? Yes 43 Depth of forebay at entrance (inches) 42 in 44 Depth of forebay at exit (inches) 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes 46 Width of the vegetated shelf(feet) 6 47 Slope of vegetated shelf(H:V) _ 6:1 48 Does the orifice drawdown from below the top surface of the Yes permanent pool? Does the pond minimize impacts to the receiving channel from 49 the 1-yr, 24-hr storm? Yes 50 Are fountains proposed? (If Y, please provide documentation that No MDC(9) is met.) 51 Is a trash rack or other device provided to protect the outlet Yes system? 52 Are the dam and embankment planted in non-clumping turf Yes grass? 53 Species of turf that will be used on the dam and embankment n/a 54 Has a planting plan been provided for the vegetated shelf? Yes ADDITIONAL INFORMATION No Please use this space to provide any additional information about 55 the wet pond(s):