HomeMy WebLinkAbout20110677 Ver 3_More Info Received_20240815 (5)Staff Review Form
NORTH CAROJNA
Environmental Quality
Updated September4, 2020
Staff Review
Does this application have all the attachments needed to accept it into the review process? *
Yes No
ID#*
20110677
Version* 3
Does this project involve maintenance dredging funded by the Shallow Draft Navigation Channel Dredging and
Aquatic Weed Fund or involve the distribution or transmission of energy or fuel, including natural gas, diesel,
petroleum, or electricity?*
Yes No
Is this project a public transportation project? *
Yes No
Reviewer List: * Sue Homewood:Sue.Homewood
Select Reviewing Office: * Central Office - (919) 707-9000
Does this project require a request for payment to be sent? *
Yes
No
Project Submittal Form
Please note: fields marked with a red asterisk * below are required. You will not be able to submit the form until all
mandatory questions are answered.
Project Type: *
For the Record Only (Courtesy Copy)
New Project
Modification/New Project with Existing ID
More Information Response
Other Agency Comments
Pre -Application Submittal
Re-Issuance\Renewal Request
Stream or Buffer Appeal
Is this supplemental information that needs to be sent to the Corps? *
Yes No
Project Contact Information
Name:
Kim Williams
Who is submitting the information?
Email Address: kim.williams@davey.com
Project Information
Existing ID #:
11-0677
20170001 (no dashes)
Project Name: Mid -Atlantic Industrial Project
Is this a public transportation project?
Yes
No
Existing Version:
3
Is the project located within a NC DCM Area of Environmental Concern (AEC)?
Yes No Unknown
Is this project connected with ARPA funding?
Yes No
County (ies)
Brunswick
Please upload all files that need to be submited.
Click the upload button or drag and drop files here to attach document
Impacts Rev 8-15-24.pdf 126.78KB
Overall Impact Map - 2024-08-14.pdf 6.03MB
Only pdf or kmz files are accepted.
Describe the attachments or
comments:
Attached is the revised site plan for the Mid -Atlantic Industrial Project and an updated table of impacts. The site
plan removes the non -jurisdictional wetlands, adds a very small amount of additional wetland impact (Wetland
Impact #5) needed for a sediment basin and stormwater pipes, and adds additional jurisdictional ditch impacts
needed for the EAM footprint, drainage improvements, access roads, and Hwy 74/76 improvements. Impacts
are now 5.62 acres of jurisdictional wetlands and 3.09 acres of jurisdictional ditches.
Sign and Submit
By checking the box and signing box below, I certify that:
• I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the
best of my knowledge and belief.
• I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401
certification request within the applicable reasonable period of time.
• I agree that submission of this online form is a "transaction" subject to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General
Statutes (the "Uniform Electronic Transactions Act");
• I understand that an electronic signature has the same legal effect and can be enforced in the same way as a
written signature; AND
• I intend to electronically sign and submit the online form.
Signature:
Submittal Date: 8/15/2024
Is filled in automatically.