HomeMy WebLinkAbout740118_Plan of Action Freeboard_20240814PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
Foxwood 74-118
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker 17.0 inches
b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches
c. line b - line a (inches in red zone) = 2.0 inches
d. top of dike surface area according to design
(area at below structural freeboard elevation) 261250 ft2
e. line c/12 x line d x 7.48 gallons/ft3 325692 gallons
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design 180 days
g. volume of waste produced according to structural design 100701 ft3
h. current herd # 7650 certified herd # 7920
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
97268 ft3
0 ft3
370025 ft3
582559 gallons
0.77 Ibs/1000 gal.
699.4 Ibs. PAN
PoA (30 Day) 2/21 /00
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Foxwood 74-118
line m=
699.4 lb PAN
2. Structure ID:
line m =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1+2+3+4+5+6= 699.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
O. tract#
p. field#
q. crop
r. acres
airing lRR-2
PAN balance
(Ib/acre)
[.TOTAL PAN
BALANCEFOR
FIELD(Ibs.)
mlumnrxs
u. applicaGan wintlow'
7 through 14
overseed
37.80
629.00
23776.2
Oct -Mar
'State cu nent crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 23776.2 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 699.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 23776.2 lb. PAN
y. Overall PAN balance (w -x) = -23077 lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
depopulation, herd reducton, etc. For pump& haul and herd reduction options, recalculate new PAN based on new
information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balan
table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide
information regarding the herd population and lagoon freeboard levels at the receiving facility.
Also included in this 30 day window istheopeningofthe bermudagrass window for application, which will add
PAN available.
Kaelyn Mohrfeld
Extension Agent
Agriculture, Livestock
Certified Technical Specialist
PoA (30 Day) 2/21 /00