HomeMy WebLinkAboutNCC232254_Annual Fee NOD Letter (2024 Fee)_20240816ROY COOPER
Govamor
ELIZABEIH S. BISER
Srecretruy
WILLIAM E. TOBY VINSON, JR
Intern" Dtrector
8/16/2024
Southern Benedictine Society of North Carolina, Inc.
Attn: Kerry O'Leary
1000 Belmont Mount Holly Road
Belmont, NC 28012
a
NORTH CAROLINA
EnWonmenta( Qual ty
Subject: Notice of Deficiency - Failure to Pay Annual Fee
Invoice No. NCC232254-2024
Dear Permittee:
You are receiving a Notice of Deficiency because the annual fee of $120 for coverage under NPDES General Stormwater Permit
NCG010000 for Construction Activities has not been paid as required by N.C. General Statute 143-215.3D(a)(4). The annual fee
was billed on 7/1/2024 and was due on 8/1/2024. The annual fee applies to the following construction site:
Belmont Abbey Multipurpose Track and Field
100 Belmont Mt. Holly Road, Belmont, NC
Gaston County
Certificate of Coverage No. NCC232254
NC Reference No. NCG01-2023-2254
If the project was closed out prior to the invoice due date, please request a Notice of Termination. Follow the instructions on the
NPDES Construction Program website (deq.nc.gov/NCG01). If the project was not closed out or sold prior to the invoice due date,
please pay the permit fee using the Stormwater ePayment website (deq.nc.gov/SW-ePayments).
Failure to address this deficiency within 30 calendar days could result in the issuance of a Notice of Violation and potential civil
penalty assessment of up to $25,000 per day for failing to maintain permit coverage. If you have any questions or concerns,
please contact Kieu Tran at kieu.tran@deq.nc.gov.
Sincerely,
William E. Vinson, Jr., PE, CPESC, CPM
Interim Director
Division of Energy, Mineral, and Land Resources
D_E Q� Nrnlh Cara7ina Deparlmenl of Cnvroament:J Qwlily Drvisirr ul Cnrryy. Mineral urwl Lancf Frsorrccs
Sl2 Nur R, Salisbury Slrrel I Iol2 Mail Se s,ceCmter 0.ak iyh. Nurlh Caroline Tiboo I612