Loading...
HomeMy WebLinkAboutNCC242503_Site Plan or Location Map_20240816 SINGLE LOT SITE-SPECIFIC EROSION CONTROL PLAN 0 o Q w¢ I I PROJECT DATA: 1 , I \ 1 L. . PROJECT ADDRESS: 7965 WEXFORD WATERS LANE - - - - / O o WAKE FOREST,NC 27587 WEXFORD WOODS LN / • I.- \ \ 2. PROJECT LOCATION: LAT 35'59'41*N LONG 78'32'581W //��^ Z 3 D R/W PARCEL ID NO: 1831372292 / \[) 0 c%� - - - - - - - -� j - - 3. CONSULTANT.• JOHN E O ISNBY,PE ENGINEERING w a 919-624-0997-M 0 /� WEXFZig _.p 910-791-1551-0 S sir RD WA R LANE 910-791-1501-F LICENSE f/C-2710 V �0-1 50' UBLIC RIGHT OF-WA johDOcsd-eD9lneering.com ENGINEERING - - - _ _ _ '� LAND PLANNING SITE WEXFORD WATERS LN - i - -.... ,- A? 4. PROPERTY OWNER: HALCYON NDIANA AVENUE,SUITEA JQ PER. 'AIN IC{ ® rn� - „ \ WINSTON SALEM,NC 27106 COMMERCIAL/RESIDENTIAL 0� - - _�� ��A 0 .P - \ P.O. BOX 1250 WEXFORD FOREST LN - _ �� �� -- - \ 5. PROJECT ZONING: R-40W,RESIDENTIAL WENDELL, NC 27591 AILESBURY RD �P� `* ®� 1,�;.=� \ 6. DIs�NRBED AREA =0.60 AC CEL AREA =0.72 AC (910)791-4441 ire1 10 a �''.. , 44 C WAIN-W � `�' `� �o SF \ \ \ i'` LOCATION MAP m� ,cad; ' ,�� ;r �i ,,a> o� o gni 1"= 2000' % � , •, / PLAN NOTES: E °'ri- aA��If�iyy �f4`r \ I. THIS MAP IS NOT FOR CONVEYANCE OR SALES - ► a / 2. PROPERTY LINES ARE FROM A LAND SURVEY PERFORMED BY/ � 43-SULLI0 EXECUTIECIRCLE/la 3. PROPERTY LINE BEARINGS ON THIS MAP ARE BASED ON NC STATE PLANE GRID NCRIH.4. EXISTING GROUND CONTOURS ARE FROM BFPO MAP FORW£XFORD RESERVE SUBDIVISION BY JOHN W.HARRIS PE CONSULTING ENGINEERS INC.VT � 5112 BUR OAK CIRCLEORALEIGH,NC 27612-(919)789-0744 DRIVE . / 5. HOME KILL BE BUILT ON LOT BY HALCYON HOMES LLC. W Tax s I/ / I/ 6. HOUSE WILL BE SERVED BY ON-SITE WELL AND SEPTIC; THE OS i �l/ , �/} EXISTING PRIMARY AND REPAIR SEPTIC AREAS WILL NOT BE �� / ! DISTURBED. �. (CONSTRUCTION SEQUENCE 2.i, '' A\ 1. SCHEDULE PRE-CONSTRUCTION CONFERENCE AND OBTAIN F� \ LAND DISTURBANCE PERMIT AND NOBCE TO PROCEED. m ;. / 2 INSTALL CONSTRUCTION ENTRANCE,ONLY DISTURBING WHAT ,. o. ILi / IS REWIRED TO INSTALL FABRIC AND STONE./ 3 INSTALL PERIMETER SILT FENCE AND SILT FENCE OUTLETS I.- a � /1/ / 4. CALL ENVIRCNMENTAL CONSULTANT FCR ONSITE INSPECTION� / I ^\ TC OBTAIN CERTIFICATE OF COMPLIANCE a_ m 5 PREPARE FOUNDA BONS AND DRIVEWAY CORRIDOR. o p �� , z ��SPETIC TAN sF 6. CONSTRUCT WALLS,HOUSE GARAGE,DECKS PATIOS STEPS " �� W I-" i'° O/ AND SIDEWALKS w �o $H �� / 7. SEED AND MULCH DISTURBED AREAS ACCORDING TO THE g' L W z m 4 PUMP TANK E- / REQUIRED STABILIZATION TIMELINES AND SOIL STABILIZATION a z o n GUIDELINES 3 -"+-m'^m^ / 8 INSTALL SITE LANDSCAPING. Q h � `x¢a °�'. YON HOME, LLC / \ 9. WHEN CONSTRUCTION IS COMPLETE AND ALL AREAS ARE o °p p8 PIN: 1:. 1372292 / STABILIZED COMPLETELY CALL ENVIRONMENTAL o 1- uY Z WB-1943" PG-1516 / GRADING SPECIFICATIONS: CONSULTANT FOR AN INSPECTION. W OJ -3 3'a BM-2022 'G-191 ar 10. IF SIZE IS APPROVED,REMOVE SILT FENCE,SEDIMENT ORD RESE' PHA 2 / REF.NC E&SC PLANNING AND DESIGN MANUAL(6.02) BASINS ETC.,AND SEED OUT OR STABILIZE ANY RESULTING ZONING: R 40W / / 1. CONSTRUCT AND MAINTAIN ALL EROSION AND SEDIMENTATION BARE AREAS ,,tpMCh'III / CONTROL PRACTICES AND MEASURES IN ACCORDANCE WIN THE 11. WHEN VEGETATION HAS BECOME ESTABLISHED,CALL FOR A p�.\N•„••••RO 0 APPROVED SEDIMENTATION CONTROL PLAN AND FINAL SITE INSPECTION BY THE ENVIRONMENTAL ,p Q-;•FEsF / CONSTRUCTION SCHEDULE CONSULTANT.OBTAIN A CERTIFICATE OF COMPLETION. o•:�o CM 2. REMOVE GOOD TOPSOIL FROM AREAS TO BE GRADED AND ` ¢ E FILLED,AND PRESERVE IT FOR USE IN FINISHING THE GRADING 032721 i / 3. OF LL SCARIFY AREASL AREAS TO BE TOPSOILED TO A MINIMUM DEPTH OF 2 �i y.He I•N 6 ,, M / INCHES BEFORE PLACING TOPSOIL(PRACTICE 6.04,TOPSOILING). ,�i vza�ii.OG�l,, 4. CLEAR AND GRUB AREAS TO BE FILLED TO REMOVE TREES, VEGETATION,ROOTS OR OTHER OBJECTIONABLE MATERIAL THAT 11 WOULD AFFECT THE PLANNED STABILITY OF THE FILL li / / 5. ENSURE THAT FILL MATERIAL IS FREE OF BRUSH,RUBBISH, i I ROCKS LOGS STUMPS,BUILDING DEBRIS AND OTHER (SOIL STABILIZATION NOTES Q••�� MATERIALS INAPPROPRIATE FOR CONSTRUCTING STABLE FILLS. PRIMARY&REPAIR:;•RC AREA k / 6. PLACE ALL FILL IN LAYERS NOT TO EXCEED 9 INCHES IN 1. SOIL STABILIZATION TIMEFRAMES o l THICKNESS,AND COMPACT THE LAYERS AS REWIRED TO / 84 REDUCE EROSION,SLIPPAGE,SETTLEMENT,OR OTHER RELATED SITE AREA DESCRIPTION STABILIZATION RMEPRAME EXCEPTIONS >- / PROBLEMS DITCHES A DDQSSEAIES 7 DAYS NONE / 7. DO NOT INCORPORATE FROZEN MATERIAL OR SOFT,MUCKY,OR SLOPES HIGH plwTY OHM 7DAYS NONE C , /� 8 DIHIN NOT PLACE Y FILL ON A FROZEN FOUNDATION,DUE TO LE MATERIALS INTO FILL SLOPES SLOPES STEEPER IHAx 11 7 DAYS IF SLOPES AND ARE NOT TUB THAOR LESS AN!MOTH ESC PLAN LEGEND ss POSSIBLE SUBSIDENCE AND SLIPPAGE 14 DAIS ARE ALLOWED 9. KEEP DIVERSIONS AND OTHER WATER CONVEYANCE MEASURES SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN ---- ENDING BOUNDARY l 50 FT M LENGDI FREE OF SEDIMENT DURING ALL PHASES OF DEVELOPMENT. - - - LMTS OF CONSTRUCTION/ \ / 10. HANDLE SEEPS OR SPRINGS ENCOUNTERED DURING AIL OMER AREAS IxCH SLOPES 14 DAYS NONE EXCEPT FOR PERIMETER AND FLATTER DIAN 4:1 HOW ZONES DISTURBANCE zg � CONSTRUCTION IN ACCORDANCE WIN APPROVED METHODS ENDING cRLIERr 11. (PRACTICE PERMANENTLYISTABILIZE ALL GRADED AREAS IMMEDIATELY 2 THIS PLAN IS TO BE UTILIZED AND REVIEWED ONLY IN CONJUNCTION cE//// tCRISmUCnaN ENITANCE _"--- I -IL ® / AFTER FINAL GRADING IS COMPLETED ON EACH AREA IN THE WITH THE WRITTEN NARRATIVE,WHICH IS AN INTEGRAL PART OF THIS i EROSION AND SEDIMENT CONTROL PLAN. Y GRADING PLAN.APPLY TEMPORARY STABILIZATION 3. ALL FINISHED SLOPES SHALL BE 3:1 OR FLATTER. a --X MEASURES ON ALL GRADED AREAS WHEN WORK IS TO BE sF x�x SKr FEvaystr FENCE OUTLET0 �- � -�- INTERRUPTED OR DELAYED FOR 30 WORKING DAYS OR LONGER. 4. NO WETLANDS EXIST WITHIN LIMITS OF DISTURBANCE. W sF \�" 12. ENSURE THAT TOPSOIL STOCKPILES,BORROW AREAS AND 5. SEE STABILIZATION GUIDELINES ce PROPOSED CULVERT SPOIL AREAS ARE ADEQUATELY PROTECTED FROM EROSION O c WATTLE WITH TEMPORARY AND FINAL STABILIZATION MEASURES INCLUDING SEDIMENT FENCING AND TEMPORARY SEEDING AS NECESSARY. ;., O : UP.,.,.; sm.ROCK CHECK DAM 39s i 13. MAINTENANCE:PERIODICALLY CHECK ALL GRADED AREAS AND _ _ THE SUPPORTING EROSION AND / Pc ® \-----______ -'''--� PRACTICESESPECIALLYAFTER HEAVYI RAINFALLSPROMPTLY PERMaAE1Lr ROCK CHECK DAM q4 REMOVE ALL SEDIMENT FROM DIVERSIONS AND OTHER WATER-DISPOSAL PRACTICES IF WASHOUTS OR BREAKS sK sEn/MENr eA.ml SUMMER OCCUR,REPAIR THEM IMMEDIATELY PROMPT MAINTENANCE OF d SMALL ERODED AREAS BEFORE THEY BECOME SIGNIFICANT Z iP 0 ROCK INLET PROTECTION ---/ / GULLIES IS AN ESSENTIAL PART OF AN EFFECTIVE EROSION ,yam \ AND SEDIMENTATION CONTROL PLAN. w PP i E ROCK PIPE C ET PROIECMW 5, \ / \_,-� K j f EROSION AND SEDIMENT CONTROLDATE. 7/11/2024 TD MVP.PIPE TP �o- TREE PROTECTION/SAFETY ffN[Y / APPROVED PLAN HERE SCALE 1'=2D' 7 7 VERT.SCALE:N/A 393_/ DATE rD -� TEEN.DIVERSION ` / PERMIT NO. S- DRAWN BY. RBS O //� Wake County Environmental Services CHECKED BY: JFO S- O // TEMP EC MATTING Sedimentation&Erosion Control PROJECT NO.: LOT 85 PM :�JI PERMANENrSOL /\ �3ex-�\ 91N9 856-7400 SIGNATURE ^'.O 1::.!!� RONFO7CEMENT MATTING / li MENTAL CONSUL IANT .,...{,,.....,. Shrot Na OF J