HomeMy WebLinkAbout990012_Plan of Action_20240816 PLAN OF ACTION(PoA)for HIGH WASTE LEVELS
IN STRUCT ORES AT ANIMAL FACILITIES
Facility Number 'N /-�JJ . Coanty:#"1lC1
Facility Name:'/s- y
CcrtitkdUperalorName: L — operator Phone N: 33�'ICcf J9
Dale the Wnh Level wan taitaay reported to DWR:
'ass--.r� ��-Ja
DWRC— 'N—
�6`��.
C.. t Sbaation
I. List the current waste level(s)as measured from the waste level in the legao./Amage pond to
the lowest point on the top of the data for structures wirhant spillways;and from the waste level'in
the structure in the bottom of the spillway for s"tama with spillways.Also,list the quantity of
man
waste,in inches,above the imt®liquid mark(also called"start pump').
Stmcture 1 Structure 2 Structure 3 Structure 4
Structure Name/ID: ^7 s.fC n�fY
Spillway(yes or no): 'Vo v
�rh rt
Waste tzval'(inches): AV
r, �y
Above Mavmmn Liquid Mark°(inches):D ^,/l 11
Is Dam Slumping or Seeping(yes or no): 4A) 'V U �J NV
Contributing Factors
2. Brief summary(date,type,and amount)of precipitation events contributing to high waste level:
b-45 ,4 71 <4w/ owt
Fes/0, �� wr t`rovit� y�rh
3 Date and quantity of most recent waste application event: t7� G 7D Ib' 0 S-0,3 UtJU cJ
4. Per the Certified Animal Waste Management Plan(CAWMP),how is animal waste land-applied
at your facility(e.g.solid spreader,irrigation,honey wagon,slurry truck)?
Evaluation of Waste Nia�tagement Sys�
5. If applicable,have the cattle lot and hams been inspected for leaking drinkers?Have repairs
been completed?
�GS
6. If applicable,is there enough guttering on the bans to exclude fresh water from the waste
structure?If not,when are installation or repairs to be made? AZS
qq
7. if applicable,is the diversion ditch around the waste structure functioning properly and
excluding all fresh water from the structure? // QQ ♦ / /
/ � G,nJ1/
rero:'r1 d-M-..,1,,-. f`r-^ G�.rn� f4, Sfv
S. Describe all methods employed to contain the waste or to exclude it from surface waters(e.g.
berm.,ditch,retention hole,alternate application method,removal of cattle to pasture):
ove, /-//,f b'1 nit 'V"R car./ d 11
Proposed Strateav
9. Describe moisture conditions in the field(e.g.standing water,application equipment mars down
in field,"tratficabibTy"across the soil,soils able to absorb application without ronoff,application
fields frozen and/or snow covered): '' II p
10. Given optimum soil and weather conditions,what is the earliest possible date that land
application could eomme tce7
�a
f-
it. Do you have a waste analysis obtained within 60 days of application?
12. List the proposed receiving crop(s),application window(s),and total acreage.Do all the
proposed fields have an available PAN balance with which to receive additional anunal waste?
SZ/1G, ,/ A Ile; �.1A OX?" 1-5 1//mot./b,,,,A, 7r ,Y4,-w aI
11 Is waste to be pumped and hauled to an off-site location not included in the CAWMP?If so, G-113
list the volume and PAN content of the waste to be hauled as well as the proposed site(s)with their
related facility number,number of acres,receiving crop information,etc.Contact and secure
approval from the Division of Water Resources prior to transfer of waste to a site not covered in
the facility's certified animal waste management plan.
I hereby certifi'that I have reviewed the information listed above,and to the best of my knowledge
and ability,the ion is accurate and curnv:t.
Phone:
Facility Owner/Manager(print)
Date:
Faelllty Owner/Manager
(signature)
High Waste Level POA Form-Aug2018