HomeMy WebLinkAbout310086_Plan of Action_20240813PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 31-086 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18 inches b. designed 25 yr./24 hr. storm & structural freeboard 19 inches c. line b - line a (inches in red zone) = 1 inches d. top of dike surface area according to design _91650 ft2 (area at below structural freeboard elevation) e. line c x line d x 7.48 alg lons _ _54843 gallons 12 ft 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 g. volume of waste produced according to structural design 116042 h. actual waste produced = current herd # x line g = _103277_ certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated _05/20/2024_ m. (lines e + k) x line I = 1000 days ft3 ft3 ft3 53463 ft3 _195394 gallons 2.56_ Ib/1000 gal. 641 lb PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR.124 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2/21/00 1 1. structure ID: 2 line m = 641 lb PAN 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = 641 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BE APPLIES DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 3976 F2-P1 B 46.66 146 6812 Mar -Sept 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) = 6812 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE PoA (30 Day) 2/21/00 2 w. Total PAN to be land applied (line n from section II) = 641 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 6812 lb. PAN y. Overall PAN balance (w - x) _ <6171> lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: We are working to get the lagoon level back to acceptable freeboard as soil, crops and weather allows. PoA (30 Day) 2/21/00 3