Loading...
HomeMy WebLinkAboutSW6080602_Supplement-EZ Form_20240730 SUPPLEMENT-EZ COVER PAGE FORM$LQADEr PROJECT INFORMATION 1 Project Name Project Gain Larkspur 2 Project Area(ac) 8 3 Coastal Wetland Area(ac) 0 4 Surface Water Area(ac) 0 5 Is this project High or Low Density? High 6 Does this project use an off-site SCM? No COMPLIANCE WITH 02H.1003(4) 7 Width of vegetated setbacks provided(feet) 0 8 Will the vegetated setback remain vegetated? N/A 9 II BUA is proposed in the setback,does it meet NCAC 02H.1003(4)(c-d)? N/A 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 12 Bioretention Cell 13 Wet Pond _ 2 14 Stormwater Wetland 15 Permeable Pavement --- 16 Sand Filter 17 Rainwater Harvesting(RWH) 18 Green Roof 19 Level Spreader-Fitter Strip(LS-FS) 20 Disconnected Impervious Surface(DIS) _ 21 Treatment Swale _ 22 Dry Pond 23 StormFilter 24 Silva Cell _ 25 Bayfitter 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: William Akin,PE 28 Organization: _ Civil Consultants,Inc 29 Street address: 3708 Lyckan Parkway,Suite 201 30 City,State,Zip: Durham,NC 27707 31 Phone number(s): 919-490-1645 32 Email: randy.akin@civil-consultants.com Certification Statement I certify,under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision;that the information provided in the form is,to the best of my knowledge and belief,true,accurate,and complete;and that the engineering plans, specifications,operation and maintenance agreements and other supporting information are consistent with the information provided here. t7eslpner 00111 n7 frll�.rr, SEp�l_ i = Signature of Designer 045959 j s ''„,„/Aaili ll"►�t,_ `,, Date DRAINAGE AREAS 1 Is this a high density project? Yes 2 If so,number of drainage areas/SCMs 2 3 Does this project have low density areas? No 4 If so,number of low density drainage areas 0 Is all/part of this project subject to previous rule 5 versions? No o r, EHAC,tu DRAINAGE AREA INFORMATION Entire Site 1 2 4 Type of SCM Wet Pond Wet Pond 5 Total drainage area(sq ft) _ 159817 ~-175893 6 Onsite drainage area(sq ft) _ _ _ 159817 175893 7 Offsite drainage area(sq ft) _ - 0 0 8 Total BUA in project(sq ft) 127313 sf 110643 sf_ New BUA on subdivided lots(subject to 9 permitting)(sq ft) sf sf New BUA not on subdivided lots(subject to 10 permitting)(sf) 127313 sf 110643 sf 11 Offsite BUA(sq ft) sf sf 12 Breakdown of new BUA not on subdivided lots: -Parking(sq ft) 82854 sf 49958 sf -Sidewalk(sq ft) 4459 sf 1081 sf -Roof(sq ft) 59604 sf -Roadway lsq ft) —7-Future(sq ft) -Other,please specify in the comment box below(sq ft) New infiltrating permeable pavement on 13 subdivided lots(sq ft) sf sf New infiltrating permeable pavement not on 14 subdivided lots(sq ft) sf sf Existing BUA that will remain(not subject to 15 permitting)(sq ft) sf sf 16 Existing BUA that is already permitted(sq ft) sf sf 17 Existing BUA that will be removed(sq ft) sf sf 18 Percent BUA 80% 63% 19 Design storm(inches) 1.0 in 1.0 in 20 Design volume of SCM(cu ft) 10214 cf 9031 cf 21 Calculation method for design volume SA/DA SA/DA ADDITIONAL INFORMATION Please use this space to provide any additional information about the 22 drainage area(s): WET POND Drainage area number I 1 I 2 2 Minimum required treatment volume(cu ft) 10214 d 9031 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build-out? Yes Yes 4 Is the SCM located away from contaminated sods? Yes Yes 5 What are the side slopes of the SCM(H:V)? _ 3:1 3:1 6 Does the SCM have retaining walls,gabion walls or other No No engineered side slopes? 7 Are the inlets,outlets,and receiving stream protected from erosion Yes Yes (10-year storm)? 8 Is there an overflow or bypass for inflow volume in excess of the Yes Yes design volume? 9 What is the method for dewatering the SCM for maintenance? Pump(preferred) Pump(preferred)_ 10 If applicable,will the SCM be cleaned out after construction? Yes Yes , 11 Does the maintenance access comply with General MDC(8)? Yes Yes 12 Does the drainage easement comply with General MDC(9)? Yes Yes 13 If the SCM is on a single family lot,does(will?)the plat comply with N/A N/A General MDC(10)? ____ 14 Is there an O&M Agreement that complies with General MDC(11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC(12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed px an NC licensed professional? Yes Yes WET POND MDC FROM 02H.1053 18 Sizing method used SA/DA SA/DA 19lHas a stage/storage table been provided in the calculations? Yes Yes Elevation of the excavated main pool depth(bottom of sediment20 181 78 182.00 removal)(fmsl) 21 Elevation of the main pool bottom(top of sediment removal)(fmsl) 182.78 183.00 22 Elevation of the bottom of the vegetated shelf(fmsl) 185.28 186.00 23 Elevation of the permanent pool(fmsl) 185.58 186.31 24 Elevation of the top of the vegetated shell(frnsl) 185.88 186.61 25 Elevation of the temporary pool(fmsl) 189.78 187.75 26 Surface area of the main permanent pool(square feet) 4990 6200 27 Volume of the main permanent pool(cubic feet) 13441 d 17613 cf 281Average depth of the main pool(feet) 3.50 ft 2.84 ft 29 Average depth equation used Equation 2 Equation 2 30 If using equation 3,main pool perimeter(feet) 31 If using equation 3,width of submerged veg.shelf(feet) 32 Volume of the forebay(cubic feet) 2494 d 3115 d 33 Is this 15-20%of the volume in the main pool? Yes Yes 34 Clean-out depth for forebay(inches) 12 in 12 in 35 Design volume of SCM(cu ft) 31086 d 17896 d 36 Is the outlet an orifice or a weir? Orifice Orifice 37 If orifice,orifice diameter(inches) 1 in 1 in 38 If weir.weir height(inches) 39 If weir.weir length(inches) 40 Drawdown time for the temporary pool(days) 2.88 2.22 41 Are the inlet(s)and outlet located in a manner that avoids short- Yes Yes circuiting? 42 Are berms or baffles provided to improve the flow path? Yes Yes 43 Depth of forebay at entrance(inches) 48 in 48 in 44 Depth of forebay at exit(inches) 48 in 48 in 45 Does water flow out of the forebay in a non-erosive manner? Yes Yes 46 Width of the vegetated shelf(feet) 6 ft 6 ft 47 Slope of vegetated shell(H:V) 10:1 10:1 a6 Does the orifice drawdown from below the top surface of the No No permanent pool? 49 Does the pond minimize impacts to the receiving channel from the I. Yes Yes yr,24-hr storm? 50 Are fountains proposed?(If Y,please provide documentation that No No MOC(9)is met.) 51 Is a trash rack or other device provided to protect the outlet system? Yes Yes 52 Are the dam and embankment planted in non-clumping turf grass? Yes Yes 53 Species of turf that will be used on the darn and embankment 54 Has a planting plan been provided for the vegetated shelf? Yes Yes ADDITIONAL INFORMATION Please use this space to provide any additional information about 55 the wet pond(s): Wet Pond 1 Drains drainage area B:Wetpond 2 draings drainage area A Wet Pond 1 3 8:40 AM 6/11/2024