HomeMy WebLinkAboutSW4240703_Stormwater Narrative_20240730 STORMWATER CALCULATIONS FOR CANE CREEK PHASE 8 WAXWING DRIVE SNOW CAMP, NC 27349 ALAMANCE COUNTY BY: • BATEMAN CIVIL SURVEY COMPANY ENGINEER: Douglas B. Cooper, PE NCBELS # 32648 \� N CAR/f Digitally signed by � •t;' Douglas B Cooper �UU•. SA: / Date: 2024.05.20 32648 • = 14:07:38-04'00' O. I O4?0 24 2: 7:O8 eM ` May 12, 2023 ////4S B. GQ X BCSC 42,p 0." BATEMAN CIVIL SURVEY COMPANY 2524 Reliance Avenue Phone:919.577.1080 Apex, North Carolina 27539 info@batemancivilsurvey.com DATE: May 13, 2024 Project Data— This project is located on Waxwing Drive in Snow Camp, NC. The tract area is 44.1 AC. Parcel Pin No. is 9707-29-1282. The project will be served by public water and sanitary sewer via septic tanks owned and maintained by Aqua North Carolina, INC, and future property owners, respectively. The site is within the Cape Fear River Basin and is subject to quantity control of stormwater runoff. The site is currently vacant. The site generally drains from the north to south. There are two unnamed streams in the northside of the tract and Cane Creek flows through the southern portion of the tract. The streams are buffered 50 ft on either side of the top of bank. Wetlands have been identified and are localized to areas near the streams. Cane Creek is classified as WS-V; NSV by NCDEQ. FEMA has identified portions of this site as being within the Floodway, 100-yr floodplain and 500-yr floodplain. Fill is proposed within the floodplain and a permit was received through Alamance County to disturb the area. The soils onsite are Cullen clay foams, Riverview loam and state loan with Cullen clay loam being the dominant type. The soil is classified as B hydrologic group soil. Project Description— This project phase consists of a 48 single-family lot community and includes roads, sanitary sewer via septic tanks, public water, and storm drainage via roadside ditches along the roads. Land Disturbance and Change in Impervious— There is little to no impervious area on the site — a portion of the existing access gravel road that runs onsite will be removed. The proposed impervious coverage is 201,668 SF (4.63 AC), in addition to the impervious area in the right-of-way. Portions of the existing access gravel roads to the existing wells will remain. For the impervious breakdown refer to the Impervious Area Calculation section in this report. To complete construction of this project, a total of 9.84 acres will be disturbed. Once grading activities have ceased, the disturbed area will be repaired and seeded. The site will use erosion control practices including silt fence, temporary diversions, silt fence outlets, check dams, construction entrances, sediment basins to minimize on site erosion and prevent offsite sedimentation. Streams— There are existing streams onsite. The site generally drains towards the south and west. Cane Creek (16-28) runs through the southern portion of the property and is fed by unnamed tributaries. The streams on site are subject to a 50-ft riparian buffer. This section of Cane Creek is a Water Supply V (WS-V) stream, with a supplemental Nutrient Sensitive Waters (NSW) classification. The site current drains towards the streams by overland sheet flow. The proposed site will drain to three BMPs via a roadside ditches system. The BMPs will discharge upslope of the undisturbed stream buffer. Diffuse flow will be achieved before flow reaches the buffer. For areas where the rear of lots cannot be collected by the storm drainage system, roof leaders shall have stone dissipaters and dense vegetation that will maintain overland sheet flow into the buffer after construction. Bateman Civil Survey Company,PC Page 2 Impervious Area Calculation— The impervious areas for this project are as follows: Roads—72,076 sf Lots—113,373 sf Lots Impervious Contingency— 16,219 sf Total Onsite Impervious—201,668 sf(4.63 ac) Total tract area—44.1 ac Impervious percentage—4.63/44.1 = 10.49% Design Methodology and Calculation— Drainage areas were delineated for pre-development and post-development site conditions. The site was evaluated at 1 point of analysis. The drainage area was analyzed for ground cover including impervious areas, wooded areas and grassed/open area. For the purpose of the analysis because much of the project area soils are group B soils, the soils were assumed to be group B and ground cover was assumed to be in good condition. These assumptions were applied for both pre- and post-development site conditions. A time of concentration was calculated for each drainage area to the POA. A composite CN value was calculated for each drainage area based on the land cover. Most of the runoff from the project is captured and conveyed by ditch storm drainage system. The storm drainage system was modeled using Autodesk's Storm and Sanitary Analysis (SSA) program. The pipes are sized to convey a 10-year storm per the State's requirements. HydroCAD was used to route the design storms through the pond. The HydroCAD model analyses the pre-development peak discharge based on a composite CN and Tc. The post-development treated and untreated portions of the drainage areas are input separately and a CN and Tc is applied to each. The treated portion is routed through the proposed pond (including riser with outlet, orifices, weir, and emergency spillway). The treated and untreated portions are routed through a link to calculate the total peak discharge from the drainage area. The HydroCAD reports for each POA are included with this report. The peak runoff as calculated at each POA is summarized in the table below. Bateman Civil Survey Company,PC Page 3 Peak Runoff— PEAK RUN OFF-POA 1 DESIGN STORM PRE DEVELOPMENT(CFS) POST DEVELOPMENT(CFS) 1-YR 13.39 6.82 2-YR 25.28 13.56 5-YR 44.80 34.00 10-YR 60.46 56.83 100-YR 112.56 118.27 Appendix— • Permanent Ditch Calculations • Dry Pond Calculations • Outlet Protection Calculations • HydroCAD Report ,.„:„...„,.. (9::::::1-...:::::',....,•:.\ BC SC .•...„ BATEMAN CIVIL SURVEY COMPANY Bateman Civil Survey Company, PC Phone: 919.577.1080 2524 Reliance Ave Fax:919.577.1081 Apex, NC 27539 info@batemancivilsurvey.com PERMANENT DITCH CALCULATIONS PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS SWALE#1 BATEMAN CIVIL SURVEY COWAN PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 3.33(Acres) Ca = 0.50 3.33(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 12.25(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.025 (Manning's 'n') Slope= 0.059 (fUft) Z Required= 0.85 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.90 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 3.3 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 6.43(SF) Wetted Perimeter= 7.69(ft) R = 0.84(Dimensionless) Z Actual= 5.71 Greater than or Equal to: 0.85 (Required from Above Calculation) Velocity = 12.85(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 3.3 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.90 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#2 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.61 (Acres) Ca = 0.50 0.61 (Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 2.24(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.055 (fUft) Z Required= 0.21 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.90 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 3.1 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 6.43(SF) Wetted Perimeter= 7.69(ft) R = 0.84(Dimensionless) Z Actual= 5.71 Greater than or Equal to: 0.21 (Required from Above Calculation) Velocity = 9.40(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 3.1 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.90 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • Bcsc • i•��: SWALE#3 O•.:4:77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 6.72(Acres) Ca = 0.50 6.73(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 24.73(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.070 (fUft) Z Required= 2.07 M = 2 :1(Side-Slope) DIMENSIONS: Channel Depth= 3.00 (ft) Normal Depth as Calculated Flow Depth= 1.15 (ft) yn=0.444 Bottom Width= 0 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 5.0 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 2.65(SF) Wetted Perimeter= 5.14(ft) R = 0.51 (Dimensionless) Z Actual= 1.70 Greater than or Equal to: 2.07 (Required from Above Calculation) Velocity = 7.67(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 5.0 (OK) Top of Channel Width: 12.00 ft - Channel Depth: _ 3.00 ft Flow Depth: 1.15 ft Bottom of Channel Width: 0.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#4 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.76(Acres) Ca = 0.50 0.76(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 2.80(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.100 (fUft) Z Required= 0.20 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.50 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 3.1 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 4.75(SF) Wetted Perimeter= 5.16(ft) R = 0.92(Dimensionless) Z Actual= 4.49 Greater than or Equal to: 0.20 (Required from Above Calculation) Velocity = 13.51 (ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 3.1 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.50 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#5 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 7.06(Acres) Ca = 0.50 7.06(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 25.98(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.055 (fUft) Z Required= 2.45 M = 2 :1(Side-Slope) DIMENSIONS: Channel Depth= 3.00 (ft) Normal Depth as Calculated Flow Depth= 1.11 (ft) yn=0.444 Bottom Width= 0 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 3.8 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 2.46(SF) Wetted Perimeter= 4.96(ft) R = 0.50(Dimensionless) Z Actual= 1.54 Greater than or Equal to: 2.45 (Required from Above Calculation) Velocity = 6.64(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 3.8 (OK) Top of Channel Width: 12.00 ft - Channel Depth: _ 3.00 ft Flow Depth: 1.11 ft Bottom of Channel Width: 0.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#6 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.93(Acres) Ca = 0.50 0.93(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 3.42(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.066 (fUft) Z Required= 0.30 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 1.00 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 4.1 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 7.00(SF) Wetted Perimeter= 8.32(ft) R = 0.84(Dimensionless) Z Actual= 6.24 Greater than or Equal to: 0.30 (Required from Above Calculation) Velocity = 10.33(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 4.1 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 1.00 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#7 Oz• 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.50(Acres) Ca = 0.50 0.50(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 1.84(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.067 (fUft) Z Required= 0.16 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.80 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 3.3 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 5.92(SF) Wetted Perimeter= 7.06(ft) R = 0.84(Dimensionless) Z Actual= 5.26 Greater than or Equal to: 0.16 (Required from Above Calculation) Velocity = 10.39(ft/sec) CHANNEL SECTION Check: Lining: ERONET P300 8.00 (lb/SF)> 3.3 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.80 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#8 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 1.10(Acres) Ca = 0.50 1.10(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 4.05(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.050 (fUft) Z Required= 0.40 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.85 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 2.7 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 6.17(SF) Wetted Perimeter= 7.38(ft) R = 0.84(Dimensionless) Z Actual= 5.47 Greater than or Equal to: 0.40 (Required from Above Calculation) Velocity = 8.96(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 2.7 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.85 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS • BC SC • i•��: SWALE#9 O=h � 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.34(Acres) Ca = 0.50 0.34(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 1.25(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.034 (fUft) Z Required= 0.15 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.85 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 1.8 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 6.17(SF) Wetted Perimeter= 7.38(ft) R = 0.84(Dimensionless) Z Actual= 5.47 Greater than or Equal to: 0.15 (Required from Above Calculation) Velocity = 7.39(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 1.8 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.85 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS •� Bcsc • i•��: SWALE#10 Oh=* 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.48(Acres) Ca = 0.50 0.48(Ac.) Cb = 0.40 0.00(Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 1.77(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.034 (fUft) Z Required= 0.21 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.75 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 1.6 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 5.69(SF) Wetted Perimeter= 6.74(ft) R = 0.84(Dimensionless) Z Actual= 5.08 Greater than or Equal to: 0.21 (Required from Above Calculation) Velocity = 7.43(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 1.6 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.75 ft Bottom of Channel Width: 2.00 ft 1 PERMANENT DIVERSION DITCH TRACTIVE FORCE CALCULATIONS •� Bcsc • i•��: SWALE#11 �h=* 77' BATEMAN CIVIL SURVEY COMPANY PROJECT: CANE CREEK DATE:05.27.22 DESIGNED BY:WKB CHECKED BY:TSG CHANNEL FLOW DATA Area= 0.34(Acres) Ca = 0.50 0.33(Ac.) Cb = 0.40 0.01 (Ac.) (Existing Residential) C+oum= 0.50 Intensity= 7.36(Inches/Hr) Flow= 1.25(CFS) 10 Yr.Intensity=7.36(in/hr) (Ditch Design) CHANNEL DIMENSIONS&DESIGN CRITERIA LINING: N = 0.033 (Manning's 'n') Slope= 0.034 (fUft) Z Required= 0.15 M = 3 :1(Side-Slope) DIMENSIONS: Channel Depth= 2.00 (ft) Normal Depth as Calculated Flow Depth= 0.70 (ft) yn=0.444 Bottom Width= 2 (ft.) TRACTIVE FORCE: T=Y*D*S Tractive Force (lb./SF) Y =Weight of Water (62.4 lb./CF) D =Depth of Flow(ft) S =Longitudinal Slope(ft/ft) T (calculated)= 1.5 (lb/SF) Maximum Allowable Tractive Force Product Options for Lining: Tractive Force Resistance Straw Net Single Blanket 1.50 (lb/SF) Polyproplylene Turf Reinfoced Matting 2.25 (lb/SF) Coconut Turf Renforced Matting 3.70 (lb/SF) Class"B"Rip Rap 3.50 (lb/SF) Class"I"Rip Rap 5.00 (lb/SF) ERONET P300 8.00 (lb/SF) Z ACTUAL: Channel Flow Area= 5.47(SF) Wetted Perimeter= 6.43(ft) R = 0.85(Dimensionless) Z Actual= 4.91 Greater than or Equal to: 0.15 (Required from Above Calculation) Velocity = 7.48(ft/sec) CHANNEL SECTION Check: Lining:ERONET P300 8.00 (lb/SF)> 1.5 (OK) Top of Channel Width: 14.00 ft - Channel Depth: _ 2.00 ft Flow Depth: 0.70 ft Bottom of Channel Width: 2.00 ft 1 CANE CREEK Permanent Diversion Ditch Summary Index Table cnannei Depth of Channel Sideslope(M) Top Width Bottom Width Lining Flow Depth(D) Velocity SWALE#1 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.90 ft. 12.85 ft/sec SWALE#2 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.90 ft. 9.40 ft/sec SWALE#3 3.00 ft. 2 :1 12.00 ft. 0.00 ft. ERONET P300 1.15 ft. 7.67 ft/sec SWALE#4 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.50 ft. 13.51 ft/sec SWALE#5 3.00 ft. 2 :1 12.00 ft. 0.00 ft. ERONET P300 1.11 ft. 6.64 ft/sec SWALE#6 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 1.00 ft. 10.33 ft/sec SWALE#7 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.80 ft. 10.39 ft/sec SWALE#8 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.85 ft. 8.96 ft/sec SWALE#9 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.85 ft. 7.39 ft/sec SWALE#10 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.75 ft. 7.43 ft/sec SWALE#11 2.00 ft. 3 :1 14.00 ft. 2.00 ft. ERONET P300 0.70 ft. 7.48 ft/sec 1 "- !-..1i.. ig ::16..4 i::''.:;‘i\ BCSC , • •...„ BATEMAN CIVIL SURVEY COMPANY Bateman Civil Survey Company, PC Phone: 919.577.1080 2524 Reliance Ave Fax:919.577.1081 Apex, NC 27539 info@batemancivilsurvey.com DRY POND CALCULATIONS Up to 10 acres SEDIMENT BASIN SIZES(W/TEMPORARY SKIMMER) STRUCTURE DRAINAGE DENUDED SIZE(MINIMUM) WEIR CF/ac VOLUME VOLUME Surface Area Surface Area Top DETAIL AREA AREA WIDTH LENGTH DEPTH* LENGTH REQUIRED PROVIDED sqft/cfs Required Provided Elevation (AC) (AC) (FT) (FT) (FT) (FT)** (CF) (CF) (sf) (sf) SK-1 1.1 1.1 30 150 4.0 4 1800 1,998 10,125 325 1447 4500 455.5 Dry Pond 1 SK-2 2.3 2.0 105 105 4.0 4 1800 3,564 24,806 325 2932 11025 477.5 Dry Pond 2 SK-3 1.0 1.0 27 54 3.0 4 1800 1,872 2,187 325 1355 1458 502 SK-4 1.3 1.3 35 105 4.0 4 1800 2,250 8,269 325 1629 3675 483.5 Dry Pond 3 4 1800 0 0 325 0 0 *INCLUDES 1'OF FREE BOARD. **MINIMUM WEIR LENGTH =4' ***BASIN IS DYNAMIC WITH RAISING GRADES TOP ELEVATION IS INTIAL ELEVATION STRUCTURE FLOWS 435 W/RISER GIVEN: C: 0.5 Runoff Coefficient 325 W/O RISER I: IN/HR (25-YR STORM) H: 12 INCHES Cw: 3 L= Q/(Cw*H^(3/2)) STRUCTURE AREA Q(CFS) WEIR L(FT) SK-1 1.1 4.5 4 SK-2 2.3 9.0 4 SK-3 1.0 4.2 4 SK-4 1.3 5.0 4 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 0 0 0.0 0.0 0 Skimmer Sizing Actual Table 6.64a Head on orifice of various skimmer sizes Structure Volume Pipe Size Head Flow Qd Time Oriface Oriface Skimmer Size(in.) Head on Orifice(ft.) (CF) (in) (in) (cf/d) (days) (in) (In) 1.5 0.125 SK-1 10,125 2 0.167 3,375 3.0 1.89 1.5 2 0.167 SK-2 24,806 4 0.333 8,269 3.0 2.49 2.5 2.5 0.208 SK-3 2,187 2 0.167 729 3.0 0.88 1 SK-4 8,269 2.5 0.208 2,756 3.0 1.62 1.5 3 0.25 0 0 0 3.0 4 0.333 0 0 3.0 5 0.333 0 0 3.0 6 0.417 0 0 3.0 8 0.5 Notes: 1)Based on Qd=v/t 2)Draw down time to be 2-3 days 5/11/2023 STORMWATER DRY POND #1 SIZING CALCULATIONS Project Name Cane Creek Phase 8 Project Number 200375 Date April 26, 2023 3rd revision 2nd revision 1st revision Stormwater Wetland Drainage Area Data Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Total site area 194,128 square feet = 4.46 acres Drainage area to pond I Other Drainage Area Existing Proposed Change Existing Proposed Impervious areas [sf] [sf] [sf] [sf] [sf] On-site buildings 0 23,256 23,256 0 0 On-site streets/parking 0 17,212 17,212 0 0 On-site Sidewalk 0 0 0 0 0 On-site Equipment 0 0 0 0 0 Contingency (10%) 0 1,721 1,721 0 0 Total Impervious 0 42,189 42,189 0 0 Drainage area to pond Other Drainage Area Existing Proposed Change Existing Proposed Non-impervious areas [sf] [sf] [sf] [sf] [sf] On-site grass/landscape 0 151,939 151,939 0 0 On-site woods 194,128 0 -194,128 0 0 Total non-impervious 194,128 151,939 -42,189 0 0 Total Drainage Area 194,128 194,128 0 Percent Impervious 0.0 21.7 21.7 Notes: DRY POND 1.xls BMP Drainage Area Data Page 2 of 6 Printed 5/11/2023 9:16 AM Stormwater Wetland Runoff Volume Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Drainage area 194,128 square feet Impervious area 42,189 square feet Rainfall depth 1.00 inches Percent Impervious 21.7 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 3,973.0 cubic feet Notes: Required Surface Area: DA*43560*(1/100)= 4.46*43560*(1/100)= 1,942 sf DRY POND 1.xls Runoff Volume Calcs Page 3 of 6 Printed 5/11/2023 9:16 AM Stormwater Wetland Volume Calculations Stage-Storage Data for Pond -Temporary Pool Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Incremental Incremental Incremental Incremental Cumulative Cumulative Contour ID Stage Area Area Area Area volume volume volume volume [sq.ft.] [acres] [sq.ft.] [acres] [cu.ft] [acre-ft] [cu.ft] [acre-ft] 450 0 1,531.0 0.035 1,531.0 0.0 0.0 0.0 0.0 0.0 451 1 2,412.0 0.055 2,412.0 0.0 1,971.5 0.0 1,971.5 0.0 452 2 3,359.0 0.077 3,359.0 0.0 2,885.5 0.1 4,857.0 0.1 453 3 4,374.0 0.100 4,374.0 0.0 3,866.5 0.1 8,723.5 0.2 454 4 5,452.0 0.125 5,452.0 0.0 4,913.0 0.1 13,636.5 0.2 455 5 6,588.0 0.151 6,588.0 0.0 6,020.0 0.1 19,656.5 0.3 DRY POND 1.xls Stage Storage(Temp Pool) Page 4 of 6 Printed 5/11/2023 9:16 AM Stormwater Wetland Dewatering Time Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Water quality treatment volume 3,973 cubic feet Total treatment volume 7,892 cubic feet Maximum head of water above dewatering hole 1.25 feet Driving head 0.41 _feet Orifice coefficient 0.60 _ Diameter of each hole 1.25 _inches Number of holes 1 Cross sectional area of each hole = 0.009 square feet Cross sectional area of each hole = 1.2 square inches Cross sectional area of dewatering hole(s) = 0.009 square feet Cross sectional area of dewatering hole(s) = 1.2 square inches Dewatering time for water quality volume = 1.7 _days 41.9 hours Dewatering time for total volume = 3.5 days 83.2 hours Notes: Dewatering time formula: t (days) = V/ (Cd*A*Sqrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) STORMWATER DRY POND #2 SIZING CALCULATIONS Project Name Cane Creek Phase 8 Project Number 200375 Date April 26, 2023 3rd revision 2nd revision 1st revision Stormwater Wetland Drainage Area Data Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Total site area 599,083 square feet = 13.75 acres Drainage area to pond I Other Drainage Area Existing Proposed Change Existing Proposed Impervious areas [sf] [sf] [sf] [sf] [sf] On-site buildings 0 66,861 66,861 0 0 On-site streets/parking 0 25,809 25,809 0 0 On-site Sidewalk 0 0 0 0 0 On-site Equipment 0 0 0 0 0 Contingency (10%) 0 9,267 9,267 0 0 Total Impervious 0 101,937 101,937 0 0 Drainage area to pond Other Drainage Area Existing Proposed Change Existing Proposed Non-impervious areas [sf] [sf] [sf] [sf] [sf] On-site grass/landscape 0 497,146 497,146 0 0 On-site woods 599,083 0 -599,083 0 0 Total non-impervious 599,083 497,146 -101,937 0 0 Total Drainage Area 599,083 599,083 0 Percent Impervious 0.0 17.0 17.0 Notes: DRY POND 2.xls BMP Drainage Area Data Page 2 of 6 Printed 5/11/2023 9:17 AM Stormwater Wetland Runoff Volume Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Drainage area 599,083 square feet Impervious area 101,937 square feet Rainfall depth 1.00 inches Percent Impervious 17.0 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.20 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 10,141.5 cubic feet Notes: Required Surface Area: DA*43560*(1/100)= 13.75*43560*(1/100)= 5,990 sf DRY POND 2.xls Runoff Volume Calcs Page 3 of 6 Printed 5/11/2023 9:17 AM Stormwater Wetland Volume Calculations Stage-Storage Data for Pond -Temporary Pool Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Incremental Incremental Incremental Incremental Cumulative Cumulative Contour ID Stage Area Area Area Area volume volume volume volume [sq.ft.] [acres] [sq.ft.] [acres] [cu.ft] [acre-ft] [cu.ft] [acre-ft] 472 0 5,798.0 0.133 5,798.0 0.1 0.0 0.0 0.0 0.0 473 6,733.0 0.155 6,733.0 0.0 6,265.5 0.1 6,265.5 0.1 474 2 7,732.0 0.178 7,732.0 0.0 7,232.5 0.2 13,498.0 0.3 475 3 8,795.0 0.202 8,795.0 0.0 8,263.5 0.2 21,761.5 0.4 476 4 9,920.0 0.228 9,920.0 0.0 9,357.5 0.2 31,119.0 0.4 477 5 11,103.0 0.255 11,103.0 0.0 10,511.5 0.2 41,630.5 0.5 DRY POND 2.xls Stage Storage(Temp Pool) Page 4 of 6 Printed 5/11/2023 9:17 AM Stormwater Wetland Dewatering Time Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Water quality treatment volume 10,141 cubic feet Total treatment volume 7,892 cubic feet Maximum head of water above dewatering hole 1.25 feet Driving head 0.41 feet Orifice coefficient 0.60 Diameter of each hole 1.50 inches Number of holes 1 Cross sectional area of each hole = 0.012 square feet Cross sectional area of each hole = 1.8 square inches Cross sectional area of dewatering hole(s) = 0.012 square feet Cross sectional area of dewatering hole(s) = 1.8 square inches Dewatering time for water quality volume = 3.1 days 74.2 hours Dewatering time for total volume = 2.4 days 57.8 hours Notes: Dewatering time formula: t (days) = V/ (Cd*A*Sqrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) STORMWATER DRY POND #3 SIZING CALCULATIONS Project Name Cane Creek Phase 8 Project Number 200375 Date April 26, 2023 3rd revision 2nd revision 1st revision Stormwater Wetland Drainage Area Data Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Total site area 154,895 square feet = 3.56 acres Drainage area to pond I Other Drainage Area Existing Proposed Change Existing Proposed Impervious areas [sf] [sf] [sf] [sf] [sf] On-site buildings 0 1 23,256 23,256 0 0 On-site streets/parking 0 29,055 29,055 0 0 On-site Sidewalk 0 0 0 0 0 On-site Equipment 0 0 0 0 0 Contingency (10%) 0 5,231 5,231 0 0 Total Impervious 0 57,542 57,542 0 0 Drainage area to pond Other Drainage Area Existing Proposed Change Existing Proposed Non-impervious areas [sf] [sf] [sf] [sf] [sf] On-site grass/landscape 0 97,353 97,353 0 0 On-site woods 154,895 0 -154,895 0 0 Total non-impervious 154,895 97,353 -57,542 0 0 Total Drainage Area 154,895 154,895 0 Percent Impervious 0.0 37.1 37.1 Notes: DRY POND 3.xls BMP Drainage Area Data Page 2 of 6 Printed 5/11/2023 9:19 AM Stormwater Wetland Runoff Volume Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Drainage area 154,895 square feet Impervious area 57,542 square feet Rainfall depth 1.00 inches Percent Impervious 37.1 percent R(v)=0.05+0.009*(Percent impervious) Runoff coefficient - R(v) 0.38 in/in Runoff volume=(Design rainfall)*(R(v))*(Drainage area) Runoff volume 4,961.0 cubic feet Notes: Required Surface Area: DA*43560*(1/100)= 3.56*43560*(1/100)= 1,551 sf DRY POND 3.xls Runoff Volume Calcs Page 3 of 6 Printed 5/11/2023 9:19 AM Stormwater Wetland Volume Calculations Stage-Storage Data for Pond -Temporary Pool Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Incremental Incremental Incremental Incremental Cumulative Cumulative Contour ID Stage Area Area Area Area volume volume volume volume [sq.ft.] [acres] [sq.ft.] [acres] [cu.ft] [acre-ft] [cu.ft] [acre-ft] 478 0 1,366.0 0.031 1,366.0 0.0 0.0 0.0 0.0 0.0 479 1 2,123.0 0.049 2,123.0 0.0 1,744.5 0.0 1,744.5 0.0 480 2 2,982.0 0.068 2,982.0 0.0 2,552.5 0.1 4,297.0 0.1 481 3 3,922.0 0.090 3,922.0 0.0 3,452.0 0.1 7,749.0 0.1 482 4 4,925.0 0.113 4,925.0 0.0 4,423.5 0.1 12,172.5 0.2 483 5 4,985.0 0.114 4,985.0 0.0 4,955.0 0.1 17,127.5 0.2 DRY POND 3.xls Stage Storage(Temp Pool) Page 4 of 6 Printed 5/11/2023 9:19 AM Stormwater Wetland Dewatering Time Calculations Project Cane Creek Phase 8 Project No. 200375 Date April 26, 2023 Water quality treatment volume 4,961 cubic feet Total treatment volume 8,479 cubic feet Maximum head of water above dewatering hole 1.00 feet Driving head 0.33 feet Orifice coefficient 0.60 Diameter of each hole 1.25 inches Number of holes 1 Cross sectional area of each hole = 0.009 square feet Cross sectional area of each hole = 1.2 square inches Cross sectional area of dewatering hole(s) = 0.009 square feet Cross sectional area of dewatering hole(s) = 1.2 square inches Dewatering time for water quality volume = 2.4 days 58.5 hours Dewatering time for total volume = 4.2 days 99.9 hours Notes: Dewatering time formula: t (days) = V/ (Cd*A*Sqrt (2*32.2*H)*86,400) t = drawdown time V = treatment volume Cd = orifice coefficient A = cross sectional area of orifice H = driving head (1/3 max. head) ,.„:„...„,.. (9::::::1-...:::::',....,•:.\ BC SC .•...„ BATEMAN CIVIL SURVEY COMPANY Bateman Civil Survey Company, PC Phone: 919.577.1080 2524 Reliance Ave Fax:919.577.1081 Apex, NC 27539 info@batemancivilsurvey.com OUTLET PROTECTION CALCULATIONS OUTLET PROTECTION DATE: 04/20/2023 DESIGNED BY: DESIGN WKB PROJECT NAME: CANE CREEK PROJECT NO: CHECKED BY PROJECT LOCATION: ALAMANCE COUNTY, NC 200375 TSS Storm Outlet Structure Structure= SCM#1 Qio/Qfull = 0.25 Size= 15 in V/Vfull = 0.83 Qio= 1.26 cfs V= 3.4 fps Qfull = 4.95 cfs Vfull = 4.04 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAx = 6 in Riprap Class = A Apron Thickness = 12 in 3 Apron Length = 5.0 ft Apron Width = 3 x Dia = 4.0 ft Width at End=Width+length = 9.0 ft _e-g t-- Storm Outlet Structure Structure= SCM#2 Qio/Qfull = 0.81 Size= 30 in V/Vfull = 1.11 Qio= 24.85 cfs V= 6.9 fps Qfull = 30.64 cfs Vfull = 6.24 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 15.0 ft Apron Width = 3 x Dia = 8.0 ft Width at End=Width+length = 23.0 ft Length OUTLET PROTECTION DATE: 04/20/2023 DESIGNED BY: DESIGN WKB PROJECT NAME: CANE CREEK PROJECT NO: CHECKED BY PROJECT LOCATION: ALAMANCE COUNTY, NC 200375 TSS Storm Outlet Structure Structure= SCM#3 Qio/Qfull = 0.60 Size= 24 in V/Vfull = 1.05 Qio= 10.08 cfs V= 5.6 fps Qfull = 16.90 cfs Vfull = 5.38 fps From Fig. 8.06.b.1: Zone = 1 From Fig. 8.06.b.2: D50 = 4 in DMAx = 6 in Riprap Class = A = Apron Thickness = 12 in .4444444 3 Apron Length = 8.0 ft Apron Width = 3 x Dia = 6.0 ft Width at End=Width+length = 14.0 ft _e-g t-- Storm Outlet Structure Structure= TO SCM#1 Qio/Qfull = 0.84 Size= 18 in V/Vfull = 1.12 Qio= 9.86 cfs V= 7.4 fps Qfull = 11.77 cfs Vfull = 6.66 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in • Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 9.0 ft Apron Width = 3 x Dia = 5.0 ft Width at End=Width+length = 14.0 ft Length OUTLET PROTECTION DATE: 04/20/2023 DESIGNED BY: DESIGN WKB PROJECT NAME: CANE CREEK PROJECT NO: CHECKED BY PROJECT LOCATION: ALAMANCE COUNTY, NC 200375 TSS Storm Outlet Structure Structure= TO SCM#2 Qio/Qfull = 0.61 Size= 30 in V/Vfull = 1.05 Qio= 28.37 cfs V= 9.9 fps Qfull = 46.51 cfs Vfull = 9.47 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in Riprap Class = B = Apron Thickness = 22 in .4444444 3 Apron Length = 15.0 ft Apron Width = 3 x Dia = 8.0 ft Width at End=Width+length = 23.0 ft _e-g t-- Storm Outlet Structure Structure= TO SCM#3 Qio/Qfull = 1.01 Size= 18 in V/Vfull = 1.14 Qio= 10.64 cfs V= 6.8 fps Qfull = 10.49 cfs Vfull = 5.93 fps From Fig. 8.06.b.1: Zone = 2 From Fig. 8.06.b.2: D50 = 8 in DMAx = 12 in • Riprap Class = B Apron Thickness = 22 in 3 Apron Length = 9.0 ft Apron Width = 3 x Dia = 5.0 ft Width at End=Width+length = 14.0 ft Length ,.„:„...„,.. (9::::::1-,:::A\ BC SC .•...„ BATEMAN CIVIL SURVEY COMPANY Bateman Civil Survey Company, PC Phone: 919.577.1080 2524 Reliance Ave Fax:919.577.1081 Apex, NC 27539 info@batemancivilsurvey.com HYDROCAD ANALYSIS (10S) 1S ( 4S) 7S DA to MP 1 DA to bMP 2 Pre,P 1 : DA to MP 3 KI2S) It /2ND 5P 8P Untreated Pre-AP 1 BMP 1 BMP 2 /MP 3 13L Post-AP 1 (Subca) Reach on. Mril Routing Diagram for Cane Creek HydroCAD Prepared by{enter your company name here), Printed 5/13/2024 HydroCAD®10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 2 Project Notes Rainfall events imported from "NRCS-Rain.txt" for 6000 NC Alamance Copied 10 events from PF_Depth_English_PDS 24-hr S1 storm Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 3 Rainfall Events Listing (selected events) Event# Event Storm Type Curve Mode Duration B/B Depth AMC Name (hours) (inches) 1 1-yr PF_Depth_English_PDS 24-hr S1 1-yr Default 24.00 1 2.93 2 2 2-yr PF_Depth_English_PDS 24-hr S1 2-yr Default 24.00 1 3.54 2 3 10-yr PF_Depth_English_PDS 24-hr S1 10-yr Default 24.00 1 5.10 2 4 100-yr PF_Depth_English_PDS 24-hr S1 100-yr Default 24.00 1 7.49 2 Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 4 Area Listing (all nodes) Area CN Description (acres) (subcatchment-numbers) 24.695 55 forest (1S, 4S, 7S, 10S, 12S) 0.474 85 gravel (10S) 0.148 85 gravel road (12S) 56.705 69 lawn (1S, 4S, 7S, 10S, 12S) 1.656 98 road (1S, 4S, 7S) 2.670 98 roof (1S, 4S, 7S, 10S, 12S) 86.348 67 TOTAL AREA Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 5 Soil Listing (all nodes) Area Soil Subcatchment (acres) Group Numbers 0.000 HSG A 0.000 HSG B 0.000 HSG C 0.000 HSG D 86.348 Other 1S, 4S, 7S, 10S, 12S Soils are B group 86.348 TOTAL AREA Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 6 Ground Covers (all nodes) HSG-A HSG-B HSG-C HSG-D Other Total Ground Subcatchment (acres) (acres) (acres) (acres) (acres) (acres) Cover Numbers 0.000 0.000 0.000 0.000 24.695 24.695 forest 1 S, 4S, 7S, 10S, 12S 0.000 0.000 0.000 0.000 0.474 0.474 gravel 10S 0.000 0.000 0.000 0.000 0.148 0.148 gravel road 12S 0.000 0.000 0.000 0.000 56.705 56.705 lawn 1 S, 4S, 7S, 10S, 12S 0.000 0.000 0.000 0.000 1.656 1.656 road 1 S, 4S, 7S 0.000 0.000 0.000 0.000 2.670 2.670 roof 1 S, 4S, 7S, 10S, 12S 0.000 0.000 0.000 0.000 86.348 86.348 TOTAL AREA Cane Creek HydroCAD Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 7 Pipe Listing (all nodes) Line# Node In-Invert Out-Invert Length Slope n Width Diam/Height Inside-Fill Number (feet) (feet) (feet) (ft/ft) (inches) (inches) (inches) 1 2P 449.75 449.50 42.3 0.0059 0.012 0.0 15.0 0.0 2 5P 471.75 471.50 45.0 0.0056 0.012 0.0 30.0 0.0 3 8P 477.75 477.50 42.0 0.0060 0.012 0.0 24.0 0.0 Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 8 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: DA to BMP 1 Runoff Area=5.421 ac 19.79% Impervious Runoff Depth>0.78" Tc=12.6 min CN=74 Runoff=4.87 cfs 0.352 of Subcatchment4S: DA to BMP 2 Runoff Area=14.359 ac 13.87% Impervious Runoff Depth>0.73" Tc=12.2 min CN=73 Runoff=12.06 cfs 0.876 of Subcatchment7S: DA to BMP 3 Runoff Area=4.809 ac 16.49% Impervious Runoff Depth>0.73" Tc=15.6 min CN=73 Runoff=3.65 cfs 0.293 af Subcatchment 10S: Pre-AP 1 Runoff Area=43.185 ac 0.00% Impervious Runoff Depth>0.41" Tc=19.8 min CN=65 Runoff=13.39 cfs 1.482 of Subcatchment 12S: Untreated Runoff Area=18.574 ac 2.52% Impervious Runoff Depth>0.32" Tc=16.2 min CN=62 Runoff=4.07 cfs 0.491 af Pond 2P: BMP 1 Peak Elev=453.35' Storage=13,333 cf Inflow=4.87 cfs 0.352 af Primary=0.07 cfs 0.045 af Secondary=0.00 cfs 0.000 af Outflow=0.07 cfs 0.045 af Pond 5P: BMP 2 Peak Elev=474.25' Storage=15,478 cf Inflow=12.06 cfs 0.876 af Primary=3.31 cfs 0.699 af Secondary=0.00 cfs 0.000 af Outflow=3.31 cfs 0.699 af Pond 8P: BMP 3 Peak Elev=481.51' Storage=9,884 cf Inflow=3.65 cfs 0.293 af Primary=0.17 cfs 0.066 af Secondary=0.00 cfs 0.000 af Outflow=0.17 cfs 0.066 af Link 11 L: Pre-AP 1 Inflow=13.39 cfs 1.482 af Primary=13.39 cfs 1.482 af Link 13L: Post-AP 1 Inflow=6.82 cfs 1.301 af Primary=6.82 cfs 1.301 af Total Runoff Area = 86.348 ac Runoff Volume = 3.493 af Average Runoff Depth = 0.49" 94.99% Pervious = 82.022 ac 5.01% Impervious = 4.326 ac Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 1S: DA to BMP 1 Runoff = 4.87 cfs @ 12.15 hrs, Volume= 0.352 af, Depth> 0.78" Routed to Pond 2P : BMP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Area (ac) CN Description • 0.673 98 road • 0.400 98 roof • 3.868 69 lawn • 0.480 55 forest 5.421 74 Weighted Average 4.348 80.21% Pervious Area 1.073 19.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 Direct Entry, Subcatchment 1S: DA to BMP 1 Hydrograph ❑Runoff 5Y 4.87 cfs PF_Depth_English_PDS 24-hr S1 1-yr JI-- Rainfall=2.93" —i2unoif Area=5.421 ac - Runoff bfolume=0.352 af Runoff Depth>0.78" Tc'=12.6miin - • 3 - / CN=74 3 LL - 2Y 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment 4S: DA to BMP 2 Runoff = 12.06 cfs @ 12.15 hrs, Volume= 0.876 af, Depth> 0.73" Routed to Pond 5P : BMP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Area (ac) CN Description * 0.590 98 road * 1.401 98 roof * 12.120 69 lawn * 0.248 55 forest 14.359 73 Weighted Average 12.368 86.13% Pervious Area 1.991 13.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 Direct Entry, Subcatchment 4S: DA to BMP 2 Hydrograph / 4 _ - I — 13' ■Runoff 12.06 cfs I 11 12, PF epth_English_PDS 241hr S1 -yr 11" Rainfall=2.93" I - —lunoff Area14.359 ac- 10� J Runoff'folum�e=0.8 66 af 9= i Runoff Depth>0.73" 8_ I 1Tq=12.21min w - CN=73- IV LL 6- 5_ I 4-i, I I I111 I ' 3-' 2 # 1_� 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment 7S: DA to BMP 3 Runoff = 3.65 cfs @ 12.20 hrs, Volume= 0.293 af, Depth> 0.73" Routed to Pond 8P : BMP 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Area (ac) CN Description • 0.393 98 road • 0.400 98 roof • 3.822 69 lawn • 0.194 55 forest 4.809 73 Weighted Average 4.016 83.51% Pervious Area 0.793 16.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 Direct Entry, Subcatchment 7S: DA to BMP 3 Hydrograph 4� ❑Runoff 3.65 cfs PF_Depth_English_PDS 24-hr S1 1-yr JI-- Rainfall=2.93" unoif Area=4.80'9 ac - 3 Runoff Volume=0.293 af Runoff Depth>0.73" Tc=15.6 min w CN=73 2_ _ LL 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment 10S: Pre-AP 1 Runoff = 13.39 cfs @ 12.32 hrs, Volume= 1.482 af, Depth> 0.41" Routed to Link 11 L : Pre-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Area (ac) CN Description * 0.474 85 gravel * 0.001 98 roof * 29.205 69 lawn * 13.505 55 forest 43.185 65 Weighted Average 43.184 100.00% Pervious Area 0.001 0.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, Subcatchment 10S: Pre-AP 1 / Hydrograph 15- - ■Runoff 147 I 13.39 cfs � I I -PF-epfhd EnVish-PDS 24-hr S1 1-yr- 13_ -Rainfall=2.93"- 12� Iv -Runoff Area-43.185 ac- 11= Runoff'folumle=1.482 af_ 1137 Runoff Depth>0.41" 9�— 1 / Tq=19.81min 8� / CNT--65 0 7_ LL 6= _L - 1 1 V 5 -/ 4--/— t 3 ��• dp - 1= o i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment 12S: Untreated Runoff = 4.07 cfs @ 12.30 hrs, Volume= 0.491 af, Depth> 0.32" Routed to Link 13L : Post-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Area (ac) CN Description * 0.468 98 roof * 0.148 85 gravel road * 7.690 69 lawn * 10.268 55 forest 18.574 62 Weighted Average 18.106 97.48% Pervious Area 0.468 2.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 Direct Entry, Subcatchment 12S: Untreated Hydrograph Z. I 0 Runoff 4.07 cfs 4�h , PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" _ Runoff Area-18.574 ac — Runoff Volume=0.491 af 3_/ Runoff Depth>0.32" Tc=16.2 min _ CN=62 0 LL 2 / 1 0 / iiiii��l�A 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 14 Summary for Pond 2P: BMP 1 Inflow Area = 5.421 ac, 19.79% Impervious, Inflow Depth > 0.78" for 1-yr event Inflow = 4.87 cfs @ 12.15 hrs, Volume= 0.352 af Outflow = 0.07 cfs @ 20.00 hrs, Volume= 0.045 af, Atten= 99%, Lag= 470.9 min Primary = 0.07 cfs @ 20.00 hrs, Volume= 0.045 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 453.35' @ 20.00 hrs Surf.Area= 22,136 sf Storage= 13,333 cf Plug-Flow detention time= 245.4 min calculated for 0.045 af(13% of inflow) Center-of-Mass det. time= 146.3 min ( 964.7 - 818.4 ) Volume Invert Avail.Storage Storage Description #1 450.00' 69,657 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 450.00 1,531 0 0 451.00 2,412 1,972 1,972 452.00 3,359 2,886 4,857 453.00 4,374 3,867 8,724 454.00 55,452 29,913 38,637 455.00 6,588 31,020 69,657 Device Routing Invert Outlet Devices #1 Primary 449.75' 15.0" Round Culvert L= 42.3' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 449.75' /449.50' S= 0.0059 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 450.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 453.50' 36.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 454.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.07 cfs @ 20.00 hrs HW=453.35' (Free Discharge) 4-1=Culvert (Passes 0.07 cfs of 10.19 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 8.81 fps) 3=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=450.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 15 Pond 2P: BMP 1 Hydrograph I ❑Inflow 4.87 cfs ❑outflow ,r inflow Area=5.421 acSecondary E Sec 57 Peak Elev=453.35' / Storage=13,333 cf 4� I w 3Y / II o o LL 2� r . 0.07 cfs I 0.00 cfs , z"""" 0 !-«« ll�� � 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 16 Summary for Pond 5P: BMP 2 Inflow Area = 14.359 ac, 13.87% Impervious, Inflow Depth > 0.73" for 1-yr event Inflow = 12.06 cfs @ 12.15 hrs, Volume= 0.876 af Outflow = 3.31 cfs @ 12.69 hrs, Volume= 0.699 af, Atten= 73%, Lag= 32.7 min Primary = 3.31 cfs @ 12.69 hrs, Volume= 0.699 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 474.25' @ 12.69 hrs Surf.Area= 8,000 sf Storage= 15,478 cf Plug-Flow detention time= 105.5 min calculated for 0.696 af(80% of inflow) Center-of-Mass det. time= 49.7 min ( 870.2 - 820.4 ) Volume Invert Avail.Storage Storage Description #1 472.00' 41,631 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 472.00 5,798 0 0 473.00 6,733 6,266 6,266 474.00 7,732 7,233 13,498 475.00 8,795 8,264 21,762 476.00 9,920 9,358 31,119 477.00 11,103 10,512 41,631 Device Routing Invert Outlet Devices #1 Primary 471.75' 30.0" Round RCP Round 30" L= 45.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 471.75' /471.50' S= 0.0056 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 4.91 sf #2 Device 1 472.00' 1.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 473.00' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 474.30' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 474.75' 24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 475.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Secondary 476.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 17 Primary OutFlow Max=3.31 cfs © 12.69 hrs HW=474.25' (Free Discharge) 4-1=RCP_Round 30" (Passes 3.31 cfs of 22.25 cfs potential flow) —2=Orifice/Grate (Orifice Controls 0.09 cfs @ 7.22 fps) 3=Orifice/Grate (Orifice Controls 3.22 cfs @ 4.61 fps) —4=Orifice/Grate ( Controls 0.00 cfs) 5=Orifice/Grate ( Controls 0.00 cfs) —6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=472.00' (Free Discharge) 4-7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond 5P: BMP 2 Hydrograph _ I 12.06 cfs ❑Inflow Outflow laflbw Are =14.359 c - ❑Primary 13= / ❑Secondary 12 / H �1 Peak Elev�=474.25' - 11_ / / L ii [ -Storrap=J5,478 jcf 10/ / / 9V / t 6V / / — 0 " 41 rf 5 4/ / 3.31cfs 3L/ / / 2= 0.00«< ii 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 18 Summary for Pond 8P: BMP 3 Inflow Area = 4.809 ac, 16.49% Impervious, Inflow Depth > 0.73" for 1-yr event Inflow = 3.65 cfs @ 12.20 hrs, Volume= 0.293 af Outflow = 0.17 cfs @ 16.68 hrs, Volume= 0.066 af, Atten= 95%, Lag= 269.0 min Primary = 0.17 cfs @ 16.68 hrs, Volume= 0.066 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 481.51' @ 16.68 hrs Surf.Area= 4,434 sf Storage= 9,884 cf Plug-Flow detention time= 276.0 min calculated for 0.066 af(23% of inflow) Center-of-Mass det. time= 179.7 min ( 1,002.6 - 823.0 ) Volume Invert Avail.Storage Storage Description #1 478.00' 17,128 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 478.00 1,366 0 0 479.00 2,123 1,745 1,745 480.00 2,982 2,553 4,297 481.00 3,922 3,452 7,749 482.00 4,925 4,424 12,173 483.00 4,985 4,955 17,128 Device Routing Invert Outlet Devices #1 Primary 477.75' 24.0" Round RCP Round 24" L= 42.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 477.75' /477.50' S= 0.0060 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 478.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 481.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 482.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.12 cfs @ 16.68 hrs HW=481.51' (Free Discharge) 4-1=RCP_Round 24" (Passes 0.12 cfs of 25.13 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 9.02 fps) 3=Orifice/Grate (Weir Controls 0.04 cfs @ 0.34 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=478.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 19 Pond 8P: BMP 3 Hydrograph 3.65 cfs ❑Inflow ❑Outflow 0Inflow Area=4.809 ac ❑Prima ry 4 ❑Secondary It Peak Elev=481 .51' 1 rStorage=9,884 cf 3 4444 3 2- OP 0 LL / i 0.17 cfs 0.00 cfs . / ll�l�l������������lll�ll 0 v<<< ////////////// //////////// 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 20 Summary for Link 11 L: Pre-AP 1 Inflow Area = 43.185 ac, 0.00% Impervious, Inflow Depth > 0.41" for 1-yr event Inflow = 13.39 cfs @ 12.32 hrs, Volume= 1.482 af Primary = 13.39 cfs @ 12.32 hrs, Volume= 1.482 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Pre-AP 1 Hydrograph 15 / I 1 1A rf ❑Inflow ❑Primary 14 13.39 cfs Inflow Area=43.185 ac 13 �. 11 12 �// 10 A I -,L 4 o 8 /1 1 0 7 6 jot , 5 � -H + _L 1 _L _[ _ _ i 4 ' _ _ l_ _LI _L _I _ 3 2 At ZZ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 1-yr Rainfall=2.93" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 21 Summary for Link 13L: Post-AP 1 Inflow Area = 43.163 ac, 10.02% Impervious, Inflow Depth > 0.36" for 1-yr event Inflow = 6.82 cfs @ 12.48 hrs, Volume= 1.301 af Primary = 6.82 cfs @ 12.48 hrs, Volume= 1.301 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 13L: Post-AP 1 Hydrograph I R R7 rf ❑Inflow ❑Primary 7 6.82 cfs Inflow Area=43.163000 ac 6_ 5 4 o 3 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 22 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: DA to BMP 1 Runoff Area=5.421 ac 19.79% Impervious Runoff Depth>1.15" Tc=12.6 min CN=74 Runoff=7.41 cfs 0.521 af Subcatchment4S: DA to BMP 2 Runoff Area=14.359 ac 13.87% Impervious Runoff Depth>1.09" Tc=12.2 min CN=73 Runoff=18.66 cfs 1.310 of Subcatchment7S: DA to BMP 3 Runoff Area=4.809 ac 16.49% Impervious Runoff Depth>1.09" Tc=15.6 min CN=73 Runoff=5.65 cfs 0.438 af Subcatchment 10S: Pre-AP 1 Runoff Area=43.185 ac 0.00% Impervious Runoff Depth>0.68" Tc=19.8 min CN=65 Runoff=25.28 cfs 2.458 af Subcatchment 12S: Untreated Runoff Area=18.574 ac 2.52% Impervious Runoff Depth>0.56" Tc=16.2 min CN=62 Runoff=8.74 cfs 0.859 af Pond 2P: BMP 1 Peak Elev=453.55' Storage=18,843 cf Inflow=7.41 cfs 0.521 af Primary=0.20 cfs 0.088 af Secondary=0.00 cfs 0.000 af Outflow=0.20 cfs 0.088 af Pond 5P: BMP 2 Peak Elev=474.98' Storage=21,588 cf Inflow=18.66 cfs 1.310 af Primary=7.11 cfs 1.126 af Secondary=0.00 cfs 0.000 af Outflow=7.11 cfs 1.126 af Pond 8P: BMP 3 Peak Elev=481.61' Storage=10,309 cf Inflow=5.65 cfs 0.438 af Primary=1.43 cfs 0.211 af Secondary=0.00 cfs 0.000 af Outflow=1.43 cfs 0.211 af Link 11 L: Pre-AP 1 Inflow=25.28 cfs 2.458 af Primary=25.28 cfs 2.458 af Link 13L: Post-AP 1 Inflow=13.56 cfs 2.285 af Primary=13.56 cfs 2.285 af Total Runoff Area = 86.348 ac Runoff Volume = 5.585 af Average Runoff Depth = 0.78" 94.99% Pervious = 82.022 ac 5.01% Impervious = 4.326 ac Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 1S: DA to BMP 1 Runoff = 7.41 cfs @ 12.15 hrs, Volume= 0.521 af, Depth> 1.15" Routed to Pond 2P : BMP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Area (ac) CN Description • 0.673 98 road • 0.400 98 roof • 3.868 69 lawn • 0.480 55 forest 5.421 74 Weighted Average 4.348 80.21% Pervious Area 1.073 19.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 Direct Entry, Subcatchment 1S: DA to BMP 1 Hydrograph 8 0 Runoff 7.41 cfs —PF Depth=EnglishPLS-241hr-S1 2-yr 7Y L I Rai l= " Runoff Arel=fal5.4213.54 ac 6- Runoff Volume=0.521 of Runoff Depth>1.15" 5� fr TC=12.6Imin CN=74 4Y F F LL 3- 21/ 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment 4S: DA to BMP 2 Runoff = 18.66 cfs @ 12.14 hrs, Volume= 1.310 af, Depth> 1.09" Routed to Pond 5P : BMP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Area (ac) CN Description * 0.590 98 road * 1.401 98 roof * 12.120 69 lawn * 0.248 55 forest 14.359 73 Weighted Average 12.368 86.13% Pervious Area 1.991 13.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ _ 12.2 Direct Entry, Subcatchment 4S: DA to BMP 2 Hydrograph - 1 H — 20_ •Runoff 18.66 cfs II - 1 19 �P- 4 F epth l En-ish-PDS-241�S1*Tyr- 18 — — — ' — — — I lffaitfall= .54" 17=' 16= 0 - Runoff Area-14.3 9 ac 15 H H Ri.�noff Voium�--1.3lO af 14=! 0Runaff Depth>� g9" 13-' it Tq=1-2.2f min- 12 C173 11-� — - - 8 i I — 4 _ L fl 4- 1 gil , 1_' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment 7S: DA to BMP 3 Runoff = 5.65 cfs @ 12.19 hrs, Volume= 0.438 af, Depth> 1.09" Routed to Pond 8P : BMP 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Area (ac) CN Description • 0.393 98 road • 0.400 98 roof • 3.822 69 lawn • 0.194 55 forest 4.809 73 Weighted Average 4.016 83.51% Pervious Area 0.793 16.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 Direct Entry, Subcatchment 7S: DA to BMP 3 Hydrograph L 6� 5.65 cfs ❑Runoff PF_Depth_English_PDS 24-hr S1 2-yr T Runoff R Rainfall=3.54" unoff Area=4.809 ac Runoff 1.1olume=0.438 af 4=Z / Runoff-Depth>1.09" TC=15.6 min CN=73 3y -r LL 2-/ I � I 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment 10S: Pre-AP 1 Runoff = 25.28 cfs @ 12.28 hrs, Volume= 2.458 af, Depth> 0.68" Routed to Link 11 L : Pre-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Area (ac) CN Description * 0.474 85 gravel * 0.001 98 roof * 29.205 69 lawn * 13.505 55 forest 43.185 65 Weighted Average 43.184 100.00% Pervious Area 0.001 0.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 19.8 Direct Entry, Subcatchment 10S: Pre-AP 1 Hydrograph 28/ _ •Runoff 26_/— 25.28 cfs -PF_Depth_English_PDS 24-hr S1 2-yr- 24_ Rainfall= .54" 22= Runoff Area-43.1 85 ac 20-/ Runoff goluma=2.458 af 18- ' Runoff-Depth> 8"- Tt4=-1-9.8tmin in 16-/ CN=65 3 14 LL 12- 4 / - 10-' - 4 1 ; 2 a 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 27 Summary for Subcatchment 12S: Untreated Runoff = 8.74 cfs @ 12.24 hrs, Volume= 0.859 af, Depth> 0.56" Routed to Link 13L : Post-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Area (ac) CN Description * 0.468 98 roof * 0.148 85 gravel road * 7.690 69 lawn * 10.268 55 forest 18.574 62 Weighted Average 18.106 97.48% Pervious Area 0.468 2.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) _ 16.2 Direct Entry, Subcatchment 12S: Untreated Hydrograph ■Runoff 8.74 cfs -I I ,/ PF_Depth_Englih_PDS 241hr S112-yr Rainfall= .54" Runoff Area1-18.574 ac Runoff Volume=0.859 af _ Runoff Depth>0.56" Tc=16.2 min o t CN=62 5/o LL 4 1 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 28 Summary for Pond 2P: BMP 1 Inflow Area = 5.421 ac, 19.79% Impervious, Inflow Depth > 1.15" for 2-yr event Inflow = 7.41 cfs @ 12.15 hrs, Volume= 0.521 af Outflow = 0.20 cfs @ 18.99 hrs, Volume= 0.088 af, Atten= 97%, Lag= 410.9 min Primary = 0.20 cfs @ 18.99 hrs, Volume= 0.088 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 453.55' @ 18.99 hrs Surf.Area= 32,449 sf Storage= 18,843 cf Plug-Flow detention time= 295.9 min calculated for 0.088 af(17% of inflow) Center-of-Mass det. time= 202.5 min ( 1,013.0 - 810.5 ) Volume Invert Avail.Storage Storage Description #1 450.00' 69,657 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 450.00 1,531 0 0 451.00 2,412 1,972 1,972 452.00 3,359 2,886 4,857 453.00 4,374 3,867 8,724 454.00 55,452 29,913 38,637 455.00 6,588 31,020 69,657 Device Routing Invert Outlet Devices #1 Primary 449.75' 15.0" Round Culvert L= 42.3' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 449.75' /449.50' S= 0.0059 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 450.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 453.50' 36.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 454.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=0.18 cfs @ 18.99 hrs HW=453.55' (Free Discharge) 4-1=Culvert (Passes 0.18 cfs of 10.53 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 9.07 fps) 3=Orifice/Grate (Orifice Controls 0.11 cfs @ 0.72 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=450.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 29 Pond 2P: BMP 1 Hydrograph 7.41 Cfs ❑Inflow / ❑Outflow Inflow Area=5.421 ac - E se ondary $� / I— H I— I— Peak Elev=453.55' 7� / / H 1 I— I— , I— Storage=18,843 cf 6� / H H I— 1 I— I— 5 / , H 1 I— I— I— L 4' LL 4 / L 1 L I L 3 / 2� / 1 ������� _,,y . / ��� Z n 9n rf 1 0.00 cfs / % / ,j/////////�020cfs 7(21 fll�ll��iiiiiiiiiilll�lliiiiiiiiiii/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 30 Summary for Pond 5P: BMP 2 Inflow Area = 14.359 ac, 13.87% Impervious, Inflow Depth > 1.09" for 2-yr event Inflow = 18.66 cfs @ 12.14 hrs, Volume= 1.310 of Outflow = 7.11 cfs @ 12.59 hrs, Volume= 1.126 af, Atten= 62%, Lag= 26.7 min Primary = 7.11 cfs @ 12.59 hrs, Volume= 1.126 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 474.98' @ 12.59 hrs Surf.Area= 8,774 sf Storage= 21,588 cf Plug-Flow detention time= 85.3 min calculated for 1.122 af(86% of inflow) Center-of-Mass det. time= 42.9 min ( 855.1 - 812.2 ) Volume Invert Avail.Storage Storage Description #1 472.00' 41,631 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 472.00 5,798 0 0 473.00 6,733 6,266 6,266 474.00 7,732 7,233 13,498 475.00 8,795 8,264 21,762 476.00 9,920 9,358 31,119 477.00 11,103 10,512 41,631 Device Routing Invert Outlet Devices #1 Primary 471.75' 30.0" Round RCP Round 30" L= 45.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 471.75' /471.50' S= 0.0056 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 4.91 sf #2 Device 1 472.00' 1.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 473.00' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 474.30' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 474.75' 24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 475.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Secondary 476.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 31 Primary OutFlow Max=7.09 cfs © 12.59 hrs HW=474.98' (Free Discharge) L1=RCP_Round 30" (Passes 7.09 cfs of 29.85 cfs potential flow) —2=Orifice/Grate (Orifice Controls 0.10 cfs @ 8.31 fps) 3=Orifice/Grate (Orifice Controls 4.31 cfs @ 6.18 fps) —4=Orifice/Grate (Orifice Controls 1.97 cfs @ 2.83 fps) 5=Orifice/Grate (Orifice Controls 0.70 cfs @ 1.53 fps) —6=Orifice/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=472.00' (Free Discharge) At7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond 5P: BMP 2 Hydrograph 1— 1- 1— j18.66 cfs A w (� A °Inflow j t inf l A4re6_= 14.3 9 �4L — ❑Primary ❑Secondary 20 / 19 / / weak Elev,474.98' — 17 / / H ' tc�rage=;1,§88Hcf - 16� / 15=/ 144/ 13 / 12V / 10 / I 7.11 cfs 84 / 71/ 0.00 cfs 0 y«« ll�ll 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 32 Summary for Pond 8P: BMP 3 Inflow Area = 4.809 ac, 16.49% Impervious, Inflow Depth > 1.09" for 2-yr event Inflow = 5.65 cfs @ 12.19 hrs, Volume= 0.438 af Outflow = 1.43 cfs @ 12.78 hrs, Volume= 0.211 af, Atten= 75%, Lag= 35.3 min Primary = 1.43 cfs @ 12.78 hrs, Volume= 0.211 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 481.61' @ 12.78 hrs Surf.Area= 4,530 sf Storage= 10,309 cf Plug-Flow detention time= 171.2 min calculated for 0.210 af(48% of inflow) Center-of-Mass det. time= 90.1 min ( 904.9 - 814.8 ) Volume Invert Avail.Storage Storage Description #1 478.00' 17,128 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 478.00 1,366 0 0 479.00 2,123 1,745 1,745 480.00 2,982 2,553 4,297 481.00 3,922 3,452 7,749 482.00 4,925 4,424 12,173 483.00 4,985 4,955 17,128 Device Routing Invert Outlet Devices #1 Primary 477.75' 24.0" Round RCP Round 24" L= 42.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 477.75' /477.50' S= 0.0060 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 478.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 481.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 482.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.41 cfs @ 12.78 hrs HW=481.61' (Free Discharge) 4-1=RCP_Round 24" (Passes 1.41 cfs of 25.56 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 9.14 fps) 3=Orifice/Grate (Weir Controls 1.34 cfs @ 1.06 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=478.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 33 Pond 8P: BMP 3 Hydrograph 5.65 Cfs ❑Inflow outflow / I inflow Area=4.809 ac °:r'ma ❑ econrydary 6Y Peak EIev=481 .61' 5/ r r / Storage=10,309 cf aY o $ 0 0 3 LL / 1 41 r 2" 1.43 cfs I 0.00 cfs f/ 0 Y(« 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 34 Summary for Link 11 L: Pre-AP 1 Inflow Area = 43.185 ac, 0.00% Impervious, Inflow Depth > 0.68" for 2-yr event Inflow = 25.28 cfs @ 12.28 hrs, Volume= 2.458 of Primary = 25.28 cfs @ 12.28 hrs, Volume= 2.458 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Pre-AP 1 Hydrograph 28Y / — — 7�, 7R rf ❑ Inflow 0 Primary 261/ - 25.28 cfs rinfibvv irela=4L3.f185- c- 24� fi ��0 rt -L -L 22_ r201/ / I -H —L J 181/ - F ,t , / F T 1 a16� /14-LL 12_ rT , 7 118 6_ , 7— T T 7 -[ - Or 2- 1 0 ....„. ovz 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 2-yr Rainfall=3.54" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 35 Summary for Link 13L: Post-AP 1 Inflow Area = 43.163 ac, 10.02% Impervious, Inflow Depth > 0.64" for 2-yr event Inflow = 13.56 cfs @ 12.46 hrs, Volume= 2.285 af Primary = 13.56 cfs @ 12.46 hrs, Volume= 2.285 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 13L: Post-AP 1 Hydrograph 15/ _ _ _ I 11 RA rf ❑ Inflow❑Primary 14V - 13.56 cfs 'Ir1�IOw re�a= 3.fi�63�ac 12V - — °01 11- 0.* 10_ 9 8/ i T 0 Y , 0 7_ li 014 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 36 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment 1 S: DA to BMP 1 Runoff Area=5.421 ac 19.79% Impervious Runoff Depth>2.24" Tc=12.6 min CN=74 Runoff=13.67 cfs 1.013 of Subcatchment4S: DA to BMP 2 Runoff Area=14.359 ac 13.87% Impervious Runoff Depth>2.16" Tc=12.2 min CN=73 Runoff=35.14 cfs 2.586 of Subcatchment7S: DA to BMP 3 Runoff Area=4.809 ac 16.49% Impervious Runoff Depth>2.16" Tc=15.6 min CN=73 Runoff=10.71 cfs 0.865 af Subcatchment 10S: Pre-AP 1 Runoff Area=43.185 ac 0.00% Impervious Runoff Depth>1.55" Tc=19.8 min CN=65 Runoff=60.46 cfs 5.569 af Subcatchment 12S: Untreated Runoff Area=18.574 ac 2.52% Impervious Runoff Depth>1.34" Tc=16.2 min CN=62 Runoff=23.77 cfs 2.078 of Pond 2P: BMP 1 Peak Elev=453.76' Storage=26,878 cf Inflow=13.67 cfs 1.013 af Primary=1.37 cfs 0.535 af Secondary=0.00 cfs 0.000 af Outflow=1.37 cfs 0.535 af Pond 5P: BMP 2 Peak Elev=475.92' Storage=30,364 cf Inflow=35.14 cfs 2.586 af Primary=25.98 cfs 2.386 af Secondary=0.00 cfs 0.000 af Outflow=25.98 cfs 2.386 af Pond 8P: BMP 3 Peak Elev=481.87' Storage=11,536 cf Inflow=10.71 cfs 0.865 of Primary=8.88 cfs 0.637 af Secondary=0.00 cfs 0.000 af Outflow=8.88 cfs 0.637 af Link 11 L: Pre-AP 1 Inflow=60.46 cfs 5.569 af Primary=60.46 cfs 5.569 af Link 13L: Post-AP 1 Inflow=56.83 cfs 5.636 af Primary=56.83 cfs 5.636 af Total Runoff Area = 86.348 ac Runoff Volume = 12.111 af Average Runoff Depth = 1.68" 94.99% Pervious = 82.022 ac 5.01% Impervious = 4.326 ac Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 1S: DA to BMP 1 Runoff = 13.67 cfs @ 12.14 hrs, Volume= 1.013 af, Depth> 2.24" Routed to Pond 2P : BMP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Area (ac) CN Description • 0.673 98 road • 0.400 98 roof • 3.868 69 lawn • 0.480 55 forest 5.421 74 Weighted Average 4.348 80.21% Pervious Area 1.073 19.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 Direct Entry, Subcatchment 1S: DA to BMP 1 Hydrograph 15 _ _ ■Runoff — — - — 13.67 cfs — I 14= PF_Depth_English—PDS 244w-S1 8-yr- 13- Ra'nfall=5.10"- 12/ Runoff Area=5.421 ac 11 Runoff,Volurne=1.013 af Runoff Depth>2.24" 0 10_ Tc=12.6 min 97 CN=74_ isc o LL 4 57 4= 2Y IV 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment 4S: DA to BMP 2 Runoff = 35.14 cfs @ 12.13 hrs, Volume= 2.586 af, Depth> 2.16" Routed to Pond 5P : BMP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Area (ac) CN Description * 0.590 98 road * 1.401 98 roof * 12.120 69 lawn * 0.248 55 forest 14.359 73 Weighted Average 12.368 86.13% Pervious Area 1.991 13.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 Direct Entry, Subcatchment 4S: DA to BMP 2 Hydrograph — 38= — — — — — — — •Runoff 36- 35.14 cfs PFDeptIish=PDS 24.hr S1 10-yr 34_ _ — 321/ I -2a'n�all=5.10" RunoffAlea 14.35Wac 30 28= unoff Volu a=2.5 66 of 26_ 261 Runoff Depth>2.16" 24= 4 / - Tc=12. min_ TIC 22 / CN=73 18� 16= u iii 12_ f 1 / 8 — 1- 6= 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment 7S: DA to BMP 3 Runoff = 10.71 cfs @ 12.18 hrs, Volume= 0.865 af, Depth> 2.16" Routed to Pond 8P : BMP 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Area (ac) CN Description • 0.393 98 road • 0.400 98 roof • 3.822 69 lawn • 0.194 55 forest 4.809 73 Weighted Average 4.016 83.51% Pervious Area 0.793 16.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 Direct Entry, Subcatchment 7S: DA to BMP 3 Hydrograph / ■Runoff 11 10.71 cfs I I PF De Enn Ish PDS 24-hr S1 10-yr_ 10�— 10 Rainfall=5.10" RtmbfFArea=4.809 ac- 9 Runoff,Volurne=0.865 af 8- _/ Runoff Depth>2.16" Tc=15.6 min 7 CN=73 6- a 5- 4- 3- 2- 1- 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment 10S: Pre-AP 1 Runoff = 60.46 cfs @ 12.26 hrs, Volume= 5.569 af, Depth> 1.55" Routed to Link 11 L : Pre-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Area (ac) CN Description * 0.474 85 gravel * 0.001 98 roof * 29.205 69 lawn * 13.505 55 forest 43.185 65 Weighted Average 43.184 100.00% Pervious Area 0.001 0.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, Subcatchment 10S: Pre-AP 1 Hydrograph - — — — 65_ 60.46 cfs � ❑Runoff 60: _ — — — PFpth_De _Engl9sh_PDS 24-hr S1 10-yr 55� / I —2a nfall=5.10" Runoff Area=43.185 ac- 50� unofflIVolur�e=5.569 of 45_ 4 Runoff Depth>1.55" N 40� _71 7 7 7Tc=1 .8 min CN 65 3 351/ 25313 � / 0 20_' — — I 15-' 10_ Aer 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment 12S: Untreated Runoff = 23.77 cfs @ 12.21 hrs, Volume= 2.078 af, Depth> 1.34" Routed to Link 13L : Post-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Area (ac) CN Description * 0.468 98 roof * 0.148 85 gravel road * 7.690 69 lawn * 10.268 55 forest 18.574 62 Weighted Average 18.106 97.48% Pervious Area 0.468 2.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 Direct Entry, Subcatchment 12S: Untreated Hydrograph 26/ ■Runoff 23.77 cfs 244 _ PF Deptli_Englsh_PDS 24.Jhr S1 110-yr 221/— -H —L RMnfall- 10" II -H -L - —IRUnoff�4real=t8.5Sac- 207 181/ / �unoff Runoff epth>1.34f 16:/ Tc 16.imin- w - / - C 62- ". 141/ 121/ 4 1 1 pi 1 -I - 10l fi - 1 1 81/ 1 ' / i 1 11 4 2 -/ fi .de 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 42 Summary for Pond 2P: BMP 1 Inflow Area = 5.421 ac, 19.79% Impervious, Inflow Depth > 2.24" for 10-yr event Inflow = 13.67 cfs @ 12.14 hrs, Volume= 1.013 of Outflow = 1.37 cfs @ 13.17 hrs, Volume= 0.535 af, Atten= 90%, Lag= 61.9 min Primary = 1.37 cfs @ 13.17 hrs, Volume= 0.535 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 453.76' @ 13.17 hrs Surf.Area= 43,286 sf Storage= 26,878 cf Plug-Flow detention time= 200.0 min calculated for 0.533 af(53% of inflow) Center-of-Mass det. time= 124.3 min ( 923.6 - 799.3 ) Volume Invert Avail.Storage Storage Description #1 450.00' 69,657 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 450.00 1,531 0 0 451.00 2,412 1,972 1,972 452.00 3,359 2,886 4,857 453.00 4,374 3,867 8,724 454.00 55,452 29,913 38,637 455.00 6,588 31,020 69,657 Device Routing Invert Outlet Devices #1 Primary 449.75' 15.0" Round Culvert L= 42.3' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 449.75' /449.50' S= 0.0059 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 450.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 453.50' 36.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 454.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=1.36 cfs @ 13.17 hrs HW=453.76' (Free Discharge) 4-1=Culvert (Passes 1.36 cfs of 10.87 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 9.34 fps) 3=Orifice/Grate (Orifice Controls 1.29 cfs @ 1.64 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=450.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 43 Pond 2P: BMP 1 Hydrograph A ■Inflow II/ 15 / // 13.67 cfsI Outflow �flw+Ar a t.4 1 i-c :Se onda / r ry 14V / / H H / — Peak E1I-e V 453.h6, -- 13� / / 124/ / // L L _ f� Stotagle=26,8�8 Icf - ill/ z 10: 87 / / fi fi ,o s / / I/ H/ / H H - 5 / / 41/ 1 '7 rf 3� 1.37 cfs --- 2 0.00 cfs ��� 01�«< mil! 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 44 Summary for Pond 5P: BMP 2 Inflow Area = 14.359 ac, 13.87% Impervious, Inflow Depth > 2.16" for 10-yr event Inflow = 35.14 cfs @ 12.13 hrs, Volume= 2.586 of Outflow = 25.98 cfs @ 12.27 hrs, Volume= 2.386 af, Atten= 26%, Lag= 8.4 min Primary = 25.98 cfs @ 12.27 hrs, Volume= 2.386 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 475.92' @ 12.27 hrs Surf.Area= 9,834 sf Storage= 30,364 cf Plug-Flow detention time= 57.7 min calculated for 2.386 af(92% of inflow) Center-of-Mass det. time= 31.1 min ( 831.9 - 800.8 ) Volume Invert Avail.Storage Storage Description #1 472.00' 41,631 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 472.00 5,798 0 0 473.00 6,733 6,266 6,266 474.00 7,732 7,233 13,498 475.00 8,795 8,264 21,762 476.00 9,920 9,358 31,119 477.00 11,103 10,512 41,631 Device Routing Invert Outlet Devices #1 Primary 471.75' 30.0" Round RCP_Round 30" L= 45.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 471.75' /471.50' S= 0.0056 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 4.91 sf #2 Device 1 472.00' 1.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 473.00' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 474.30' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 474.75' 24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 475.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Secondary 476.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 45 Primary OutFlow Max=25.41 cfs @ 12.27 hrs HW=475.91' (Free Discharge) t =RCP_Round 30" (Passes 25.41 cfs of 39.97 cfs potential flow) —2=Orifice/Grate (Orifice Controls 0.12 cfs @ 9.52 fps) 3=Orifice/Grate (Orifice Controls 5.40 cfs @ 7.73 fps) —4=Orifice/Grate (Orifice Controls 3.80 cfs @ 5.44 fps) 5=Orifice/Grate (Orifice Controls 5.80 cfs @ 4.35 fps) —6=Orifice/Grate (Weir Controls 10.31 cfs @ 2.09 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=472.00' (Free Discharge) At7=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Pond 5P: BMP 2 Hydrograph / 35.14 cfs ❑Inflow A w (� A Outflow / L 1— 1 "� lafI w Ares= 1 .3 9 I c _ ❑Primary 38� / ❑Secondary 36 / / 7 :Peak E1e 4Z5.92' - 34/ / / 32 / / 7C QA rf tQrac,, e= ,64_f I 30 / /' 25.98 cfs 28 / " �22 / / 3- - 4wf 12� / 10: $_ i �I//�/j ---- , 0.00 cfs r 7 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 46 Summary for Pond 8P: BMP 3 Inflow Area = 4.809 ac, 16.49% Impervious, Inflow Depth > 2.16" for 10-yr event Inflow = 10.71 cfs @ 12.18 hrs, Volume= 0.865 of Outflow = 8.88 cfs @ 12.31 hrs, Volume= 0.637 af, Atten= 17%, Lag= 7.9 min Primary = 8.88 cfs @ 12.31 hrs, Volume= 0.637 af Routed to Link 13L : Post-AP 1 Secondary = 0.00 cfs @ 5.00 hrs, Volume= 0.000 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 481.87' @ 12.31 hrs Surf.Area= 4,794 sf Storage= 11,536 cf Plug-Flow detention time= 97.0 min calculated for 0.635 af(73% of inflow) Center-of-Mass det. time= 35.4 min ( 838.8 - 803.4 ) Volume Invert Avail.Storage Storage Description #1 478.00' 17,128 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 478.00 1,366 0 0 479.00 2,123 1,745 1,745 480.00 2,982 2,553 4,297 481.00 3,922 3,452 7,749 482.00 4,925 4,424 12,173 483.00 4,985 4,955 17,128 Device Routing Invert Outlet Devices #1 Primary 477.75' 24.0" Round RCP Round 24" L= 42.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 477.75' /477.50' S= 0.0060 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 478.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 481.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 482.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=8.66 cfs @ 12.31 hrs HW=481.86' (Free Discharge) 4-1=RCP_Round 24" (Passes 8.66 cfs of 26.69 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.07 cfs @ 9.46 fps) 3=Orifice/Grate (Weir Controls 8.59 cfs @ 1.97 fps) Secondary OutFlow Max=0.00 cfs @ 5.00 hrs HW=478.00' (Free Discharge) L4=Broad-Crested Rectangular Weir( Controls 0.00 cfs) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 47 Pond 8P: BMP 3 Hydrograph 1 ■Inflow 10.71 cfs - ■Outflow / / f1�wIAra= 8e9 a�. ■Primary condary {— ■Se 111/ / / h I R RR rf t Peaik Etrev-461 .87' 10 / ' 1 1 I 8.88 cfs Storage=111,5I36 icf _ 8/ / / HH #0 1- d- I- d- -H -h -h — 3 61/ / ,° 5/ / , L- L ti 4i/ / i fi t 3/ / / — E KeY 2- /= 0.00 cfs �� /I////%//% �%i �����/ n ► 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 48 Summary for Link 11 L: Pre-AP 1 Inflow Area = 43.185 ac, 0.00% Impervious, Inflow Depth > 1.55" for 10-yr event Inflow = 60.46 cfs @ 12.26 hrs, Volume= 5.569 of Primary = 60.46 cfs @ 12.26 hrs, Volume= 5.569 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Pre-AP 1 Hydrograph / I 1 1 I -k —L 4 ❑ Inflow I An AA rfqifl&vs.4r =4C3. 3c_ ❑Primary 65 /- — — 60.46 cfs 60_ 50;-/ -h -h —h —[ — — i j7 t t H 55_ / I ii100 45 -/ /— L i A I _L ± li 1 a 40_ 3 35Y z— t ± —[ — — t i— — j LL 30' — 25' I 1 I 20= / 4 /� 1 10/ i iL ' 5- O j// Z Z Z 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 10-yr Rainfall=5.10" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 49 Summary for Link 13L: Post-AP 1 Inflow Area = 43.163 ac, 10.02% Impervious, Inflow Depth > 1.57" for 10-yr event Inflow = 56.83 cfs @ 12.27 hrs, Volume= 5.636 af Primary = 56.83 cfs @ 12.27 hrs, Volume= 5.636 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 13L: Post-AP 1 Hydrograph — ❑ Inflow I cR rf ❑Primary 60/ / + + — 56.83 c7fs ir.414;vv 4re-6=F3.1�G3Hac 50L/ 40i/ 35 0 30� 25 / — 20Y / f t — 15 / 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 50 Time span=5.00-20.00 hrs, dt=0.05 hrs, 301 points Runoff by SCS TR-20 method, UH=SCS, Weighted-CN Reach routing by Stor-Ind+Trans method - Pond routing by Stor-Ind method Subcatchment1S: DA to BMP 1 Runoff Area=5.421 ac 19.79% Impervious Runoff Depth>4.11" Tc=12.6 min CN=74 Runoff=21.69 cfs 1.856 of Subcatchment4S: DA to BMP 2 Runoff Area=14.359 ac 13.87% Impervious Runoff Depth>4.00" Tc=12.2 min CN=73 Runoff=56.51 cfs 4.789 af Subcatchment7S: DA to BMP 3 Runoff Area=4.809 ac 16.49% Impervious Runoff Depth>4.00" Tc=15.6 min CN=73 Runoff=17.45 cfs 1.602 of Subcatchment 10S: Pre-AP 1 Runoff Area=43.185 ac 0.00% Impervious Runoff Depth>3.15" Tc=19.8 min CN=65 Runoff=112.56 cfs 11.342 of Subcatchment 12S: Untreated Runoff Area=18.574 ac 2.52% Impervious Runoff Depth>2.85" Tc=16.2 min CN=62 Runoff=46.85 cfs 4.415 of Pond 2P: BMP 1 Peak EIev=454.08' Storage=43,071 cf Inflow=21.69 cfs 1.856 af Primary=4.37 cfs 1.285 af Secondary=1.00 cfs 0.043 af Outflow=5.36 cfs 1.328 af Pond 5P: BMP 2 Peak EIev=476.37' Storage=34,879 cf Inflow=56.51 cfs 4.789 af Primary=43.40 cfs 4.422 af Secondary=9.13 cfs 0.138 af Outflow=52.53 cfs 4.560 af Pond 8P: BMP 3 Peak EIev=482.06' Storage=12,476 cf Inflow=17.45 cfs 1.602 af Primary=16.60 cfs 1.364 af Secondary=0.64 cfs 0.007 af Outflow=17.24 cfs 1.371 af Link 11 L: Pre-AP 1 Inflow=112.56 cfs 11.342 af Primary=112.56 cfs 11.342 af Link 13L: Post-AP 1 Inflow=118.27 cfs 11.674 af Primary=118.27 cfs 11.674 af Total Runoff Area = 86.348 ac Runoff Volume = 24.004 af Average Runoff Depth = 3.34" 94.99% Pervious = 82.022 ac 5.01% Impervious = 4.326 ac Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 51 Summary for Subcatchment 1S: DA to BMP 1 Runoff = 21.69 cfs @ 12.13 hrs, Volume= 1.856 af, Depth> 4.11" Routed to Pond 2P : BMP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Area (ac) CN Description • 0.673 98 road • 0.400 98 roof • 3.868 69 lawn • 0.480 55 forest 5.421 74 Weighted Average 4.348 80.21% Pervious Area 1.073 19.79% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.6 Direct Entry, Subcatchment 1S: DA to BMP 1 Hydrograph — — •24 Runoff 23, 21.69 cfs 22 ' -h-PF-1;epfhlEn#11 h-F.D6-24-hr 1 1DO yr 21_ — - — — 20 Ra'nfall- .49"- 19=' - Runeff Ara=5.421 ac- 18= — — — — -unoff Vulu 1. of 17 16 Runoff D'epth> .11"_ 154 Tc=12. in- 14= — / - C74- o 13 12 4 / 4 - -° 11_ - 10 $ 4 3 0' 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 52 Summary for Subcatchment 4S: DA to BMP 2 Runoff = 56.51 cfs @ 12.13 hrs, Volume= 4.789 af, Depth> 4.00" Routed to Pond 5P : BMP 2 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Area (ac) CN Description * 0.590 98 road * 1.401 98 roof * 12.120 69 lawn * 0.248 55 forest 14.359 73 Weighted Average 12.368 86.13% Pervious Area 1.991 13.87% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 12.2 Direct Entry, Subcatchment 4S: DA to BMP 2 Hydrograph f ■Runoff 60_ 56.51 cfs I 55- — 1PF-epth_English_PDS 24-hr S1 100-yr Rainfall=7.49"_ 50= Runoff Area=14.359 ac 45= J 01 unoff,VoIur�re=4.789 af- Runoff Depth>4.00"_ 40_ Tc=12.2 min o 35= It I CN=73 0 30_ rt r 1 � _25= 1 2014/ 10 / it ' 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 53 Summary for Subcatchment 7S: DA to BMP 3 Runoff = 17.45 cfs @ 12.17 hrs, Volume= 1.602 af, Depth> 4.00" Routed to Pond 8P : BMP 3 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Area (ac) CN Description • 0.393 98 road • 0.400 98 roof • 3.822 69 lawn • 0.194 55 forest 4.809 73 Weighted Average 4.016 83.51% Pervious Area 0.793 16.49% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 15.6 Direct Entry, Subcatchment 7S: DA to BMP 3 Hydrograph 19 4 I ■Runoff 18= _ 17.45 cfs I 17 PF epth_Englih_PDS 24-h'r S1 100-yr 16= H H- H 15_y H- 4 H Runb f ARraanf=a4l=9c 14= Runoff Volu 2 a=1.6 af 0 13= Runoff Depth> .00" 1200 Tc=15. min 11 — — - _ C73 9 _H � � - 4= 4 3�/ 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 54 Summary for Subcatchment 10S: Pre-AP 1 Runoff = 112.56 cfs @ 12.24 hrs, Volume= 11.342 af, Depth> 3.15" Routed to Link 11 L : Pre-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Area (ac) CN Description * 0.474 85 gravel * 0.001 98 roof * 29.205 69 lawn * 13.505 55 forest 43.185 65 Weighted Average 43.184 100.00% Pervious Area 0.001 0.00% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 19.8 Direct Entry, Subcatchment 10S: Pre-AP 1 Hydrograph 1251_ - - - - 120_ 0 Runoff 112.56 cfs I� 115-v I PF_Depth ngl h_PDS 24-hr S1 1b0-yr 105=� -Rainfall= .49" 100 Runoff Area=43185-ac 95=/— — — R noff olum 11.342 af 90 85 u off-Dapth>3.15" 80= / T,C=19.8Trrin 75 w 70= - / CN=65 65 0 60 LL 55-50 45V 401v — 35 30_25 �— 20 110 5 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 55 Summary for Subcatchment 12S: Untreated Runoff = 46.85 cfs @ 12.20 hrs, Volume= 4.415 af, Depth> 2.85" Routed to Link 13L : Post-AP 1 Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Area (ac) CN Description * 0.468 98 roof * 0.148 85 gravel road * 7.690 69 lawn * 10.268 55 forest 18.574 62 Weighted Average 18.106 97.48% Pervious Area 0.468 2.52% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 16.2 Direct Entry, Subcatchment 12S: Untreated Hydrograph 52_ - - - ■Runoff 50= — 46.85 cfs 48 PF_Depth_Englih PD524-hrS11b0-yr- 46; 44V - — I - —Ra nfall- 9"- 42� Runoff A ea T8.5 ac- 38 / unoff�VofF Deptlur a 4.h> 5 af- 36) � n� 34 / 32= t - Tc=16. min 30 - C -62- o 286 26V0 24 / LL 222 0� 18' 14t 8; 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 56 Summary for Pond 2P: BMP 1 Inflow Area = 5.421 ac, 19.79% Impervious, Inflow Depth > 4.11" for 100-yr event Inflow = 21.69 cfs @ 12.13 hrs, Volume= 1.856 af Outflow = 5.36 cfs @ 12.71 hrs, Volume= 1.328 af, Atten= 75%, Lag= 34.6 min Primary = 4.37 cfs @ 12.71 hrs, Volume= 1.285 af Routed to Link 13L : Post-AP 1 Secondary = 1.00 cfs @ 12.71 hrs, Volume= 0.043 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 454.08' @ 12.71 hrs Surf.Area= 51,396 sf Storage= 43,071 cf Plug-Flow detention time= 164.1 min calculated for 1.323 of(71% of inflow) Center-of-Mass det. time= 97.9 min ( 887.1 - 789.2 ) Volume Invert Avail.Storage Storage Description #1 450.00' 69,657 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 450.00 1,531 0 0 451.00 2,412 1,972 1,972 452.00 3,359 2,886 4,857 453.00 4,374 3,867 8,724 454.00 55,452 29,913 38,637 455.00 6,588 31,020 69,657 Device Routing Invert Outlet Devices #1 Primary 449.75' 15.0" Round Culvert L= 42.3' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 449.75' /449.50' S= 0.0059 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 1.23 sf #2 Device 1 450.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 453.50' 36.0" W x 36.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 454.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=4.36 cfs @ 12.71 hrs HW=454.08' (Free Discharge) 4-1=Culvert (Passes 4.36 cfs of 11.38 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.08 cfs @ 9.73 fps) 3=Orifice/Grate (Orifice Controls 4.28 cfs @ 2.45 fps) Secondary OutFlow Max=0.96 cfs @ 12.71 hrs HW=454.08' (Free Discharge) L4=Broad-Crested Rectangular Weir(Weir Controls 0.96 cfs @ 0.77 fps) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 57 Pond 2P: BMP 1 Hydrograph 21.69 cfs? _ ❑Inflow ❑Outflow 24� / L inflbw Aria=5.421 ac ose ondary 22- / / I— I— Peak EIev=454.08' 20� / / 1 1 1 1 1 Storage=43,071 cf 187/ 16/ / / I H— E) 14/ / p p i— F F F 12i/ LL 10;-/ / / 8 / / r r 5.36 cfs 6 / / / 4.37 cfs 4i 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 58 Summary for Pond 5P: BMP 2 Inflow Area = 14.359 ac, 13.87% Impervious, Inflow Depth > 4.00" for 100-yr event Inflow = 56.51 cfs @ 12.13 hrs, Volume= 4.789 af Outflow = 52.53 cfs @ 12.18 hrs, Volume= 4.560 af, Atten= 7%, Lag= 3.5 min Primary = 43.40 cfs @ 12.18 hrs, Volume= 4.422 af Routed to Link 13L : Post-AP 1 Secondary = 9.13 cfs @ 12.18 hrs, Volume= 0.138 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 476.37' @ 12.18 hrs Surf.Area= 10,359 sf Storage= 34,879 cf Plug-Flow detention time= 44.3 min calculated for 4.545 af(95% of inflow) Center-of-Mass det. time= 26.8 min ( 817.6 - 790.8 ) Volume Invert Avail.Storage Storage Description #1 472.00' 41,631 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 472.00 5,798 0 0 473.00 6,733 6,266 6,266 474.00 7,732 7,233 13,498 475.00 8,795 8,264 21,762 476.00 9,920 9,358 31,119 477.00 11,103 10,512 41,631 Device Routing Invert Outlet Devices #1 Primary 471.75' 30.0" Round RCP_Round 30" L= 45.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/Outlet Invert= 471.75' /471.50' S= 0.0056 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 4.91 sf #2 Device 1 472.00' 1.5" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 473.00' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #4 Device 1 474.30' 8.0" Vert. Orifice/Grate X 2.00 C= 0.600 Limited to weir flow at low heads #5 Device 1 474.75' 24.0" W x 8.0" H Vert. Orifice/Grate C= 0.600 Limited to weir flow at low heads #6 Device 1 475.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #7 Secondary 476.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 59 Primary OutFlow Max=43.33 cfs © 12.18 hrs HW=476.36' (Free Discharge) L1=RCP_Round 30" (Inlet Controls 43.33 cfs @ 8.83 fps) —2=Orifice/Grate (Passes < 0.12 cfs potential flow) 3=Orifice/Grate (Passes < 5.85 cfs potential flow) —4=Orifice/Grate (Passes < 4.42 cfs potential flow) 5=Orifice/Grate (Passes < 7.24 cfs potential flow) —6=Orifice/Grate (Passes < 31.34 cfs potential flow) Secondary OutFlow Max=8.77 cfs @ 12.18 hrs HW=476.36' (Free Discharge) L7=Broad-Crested Rectangular Weir(Weir Controls 8.77 cfs @ 1.62 fps) Pond 5P: BMP 2 Hydrograph ❑Inflow 56.51 cfs Outflow -1 1/ t Inflow Are =14.39 is Primar 60� / / 52.53 cfs _ ❑Secondary ary 551/ / / L L B 1 1 p _Peak Elev�=476.37' 501/ / / 43.40 cfs Stp-raC9e= 4,&79Cf - 45--/ / / 40- / / Ti" 35� / / h- h 0000 t t -h t -h t LL 30- / / I L 251/ / / 20= / / 9.13 cfs //�/ -#1 , 5 ////////////// ���� / // 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 60 Summary for Pond 8P: BMP 3 Inflow Area = 4.809 ac, 16.49% Impervious, Inflow Depth > 4.00" for 100-yr event Inflow = 17.45 cfs @ 12.17 hrs, Volume= 1.602 af Outflow = 17.24 cfs @ 12.21 hrs, Volume= 1.371 af, Atten= 1%, Lag= 1.9 min Primary = 16.60 cfs @ 12.21 hrs, Volume= 1.364 af Routed to Link 13L : Post-AP 1 Secondary = 0.64 cfs @ 12.20 hrs, Volume= 0.007 af Routed to Link 13L : Post-AP 1 Routing by Stor-Ind method, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Peak Elev= 482.06' @ 12.21 hrs Surf.Area= 4,929 sf Storage= 12,476 cf Plug-Flow detention time= 68.2 min calculated for 1.366 af(85% of inflow) Center-of-Mass det. time= 24.5 min ( 817.9 - 793.4 ) Volume Invert Avail.Storage Storage Description #1 478.00' 17,128 cf Custom Stage Data (Prismatic)Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic-feet) (cubic-feet) 478.00 1,366 0 0 479.00 2,123 1,745 1,745 480.00 2,982 2,553 4,297 481.00 3,922 3,452 7,749 482.00 4,925 4,424 12,173 483.00 4,985 4,955 17,128 Device Routing Invert Outlet Devices #1 Primary 477.75' 24.0" Round RCP Round 24" L= 42.0' RCP, sq.cut end projecting, Ke= 0.500 Inlet/ Outlet Invert= 477.75' /477.50' S= 0.0060 '/' Cc= 0.900 n= 0.012 Concrete pipe, finished, Flow Area= 3.14 sf #2 Device 1 478.00' 1.2" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #3 Device 1 481.50' 36.0" x 36.0" Horiz. Orifice/Grate C= 0.600 Limited to weir flow at low heads #4 Secondary 482.00' 15.0' long x 19.0' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.68 2.70 2.70 2.64 2.63 2.64 2.64 2.63 Primary OutFlow Max=16.51 cfs © 12.21 hrs HW=482.06' (Free Discharge) 4-1=RCP_Round 24" (Passes 16.51 cfs of 27.52 cfs potential flow) '2=Orifice/Grate (Orifice Controls 0.08 cfs @ 9.70 fps) 3=Orifice/Grate (Weir Controls 16.43 cfs @ 2.45 fps) Secondary OutFlow Max=0.60 cfs @ 12.20 hrs HW=482.06' (Free Discharge) L4=Broad-Crested Rectangular Weir(Weir Controls 0.60 cfs @ 0.66 fps) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 61 Pond 8P: BMP 3 Hydrograph H H H 1 1— - -H ■Inflow / / _ 17.45 cfs ■Outflow / / r r r r t 17.24 cfs fl wfi4r a4 8t9 c ■Primary 19_ / / — ■Secondary 18 r / / 16.60 c; Peak EJIev 482.06' — 17 / / 15r / 10 S#o agle=1h2,4176 f - 12V / / 100 11 / / / 3 10i/ // $ / / / / / 4. 1 / 0.64 cfs 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 62 Summary for Link 11 L: Pre-AP 1 Inflow Area = 43.185 ac, 0.00% Impervious, Inflow Depth > 3.15" for 100-yr event Inflow = 112.56 cfs @ 12.24 hrs, Volume= 11.342 of Primary = 112.56 cfs @ 12.24 hrs, Volume= 11.342 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 11 L: Pre-AP 1 Hydrograph i fi 11 1 125� i 119 FiR rf ❑Inflow 120✓ 112.56 cfs ❑Primary 115= I1�fIQW �4re =�3.'I 85c 1 H � H 0,g 10505� i 100= 9095`z r 85 75 /— 1 r�75= , 65= iH 60-v / I// L.T. 55 /— 45 50- 40- 30 30� / 2 200 15 5 0 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) Cane Creek HydroCAD PF_Depth_English_PDS 24-hr S1 100-yr Rainfall=7.49" Prepared by {enter your company name here} Printed 5/13/2024 HydroCAD® 10.10-6a s/n 10752 ©2020 HydroCAD Software Solutions LLC Page 63 Summary for Link 13L: Post-AP 1 Inflow Area = 43.163 ac, 10.02% Impervious, Inflow Depth > 3.25" for 100-yr event Inflow = 118.27 cfs @ 12.20 hrs, Volume= 11.674 af Primary = 118.27 cfs @ 12.20 hrs, Volume= 11.674 af, Atten= 0%, Lag= 0.0 min Primary outflow = Inflow, Time Span= 5.00-20.00 hrs, dt= 0.05 hrs Link 13L: Post-AP 1 Hydrograph / t - I I I— t ❑ Inflow 130< 11 i R 77 rf 0 Primary h 120y 118.27 cfs NInflow Arela=43.1-63 C 100 0 1— F 807 , -H -H —1 / I— 0 1 60� fi fi 11 u_ ' L 1 I I 50 407/ / 30- / 107 0 . , �„ � . . . . . . 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 Time (hours) gcsc RATEMAN CIVIL SURVEY COMPANY PRE-DEVELOPMENT DRAINAGE AREAS PROJECT NAME: CANE CREEK CALCS BY: EPS PROJECT#: 200375 CHECKED BY: XXX Draiange Area Calculations I Pre- Develop. Area:I B Soil Group bescription: Area (SF) Acres CN C Impervious Roadway 0 0.000 98 0.96 Driveway 0 0.000 98 0.96 Parking Lot 0 0.000 98 0.96 Roof 51 0.001 98 0.96 Sidewalk 0 0.000 98 0.96 Gravel Road 20,626 0.474 85 0.7 Total 20,677 0.475 Pervious Lawn 1,272,159 29.205 69 0.38 Managed Pervious 0 0.000 61 0.22 Forest 588,274 13.505 55 0.1 Natural Wetland 0 0.000 55 0.1 Riparian Buffer 0 0.000 55 0.1 Open Water 0 0.000 30 0.15 - 0 0.000 30 0.15 Total 1,860,433 42.710 BMP Area 0 0.000 30 0.15 BMP Area Water 0 0.000 30 0.15 Total Area 1,881,110 43.184 %Impervious 1.10% Basin Weighted 65 0.296 4:: BC SC J GATEMAN CIVIL SURVEY COMPANY POST-DEVELOPMENT DRAINAGE AREAS PROJECT NAME: CANE CREEK CALCS BY: EPS PROJECTS: 200375 CHECKED BY: XXX Drainage Area Calculations POST Develop. Drainage Area Calculations POST Develop. Area:ITREATED SCM 1 B Soil Group Area:ITREATED SCM 2 B Soil Group Description: Area(SF) Acres CN C Description: Area(SF) Acres CN C Impervious Impervious Roadway 29,328 0.673 98 0.96 Roadway 25,697 0.590 98 0.96 Driveway 0 0.000 98 0.96 Driveway 0 0.000 98 0.96 Parking Lot 0 0.000 98 0.96 Parking Lot 0 0.000 98 0.96 Roof 17,442 0.400 98 0.96 Roof 61,047 1.401 98 0.96 Sidewalk 0 0.000 98 0.96 Sidewalk 0 0.000 98 0.96 Gravel Road 750 0.017 85 0.7 - 0 0.000 98 0.96 Total 4/,520 1.091 Total 86,744 1.991 Pervious Pervious Lawn 168,509 3.868 69 0.38 Lawn 527,932 12.120 69 0.38 Managed Pervious 0 0.000 61 0.22 Managed Pervious 0 0.000 61 0.22 Forest 20,890 0.480 55 0.1 Forest 10,792 0.248 55 0.1 Natural Wetland 0 0.000 55 0.1 Natural Wetland 0 0.000 55 0.1 Riparian Buffer 0 0.000 55 0.1 Riparian Buffer 0 0.000 55 0.1 Open Water 0 0.000 30 0.15 Open Water 0 0.000 30 0.15- 0 0.000 30 0.15 - 0 0.000 30 0.15 Total 189,400 4.348 Total 538,724 12.367 BMP Area 0 0.000 30 0.15 BMP Area 0 0.000 30 0.15 BMP Area Water 0 0.000 30 0.15 BMP Area Water 0 0.000 30 0.15 Total Area 236,919 5.439 Total Area 625,468 14.359 %Impervious 20.06% %Impervious 13.87% BasinWeighted 74 0.471 IBasmWeighted 73 0.456 6 BUA PER LOT 2907 SF 21 BUA PER LOT 2907 SF Drainage Area Calculations POST Develop. Drainage Area Calculations POST Develop. Area:ITREATED SCM 3 B Soil Group Area:IUNTREATED B Soil Group Description: Area(SF) Acres CN C Descnption: Area(SF) Acres CN C Impervious Impervious - Roadway 17,100 0.393 98 0.96 Roadway 0 0.000 98 0.96 Driveway 0 0.000 98 0.96 Driveway 0 0.000 98 0.96 Parking Lot 0 0.000 98 0.96 Parking Lot 0 0.000 98 0.96 Roof 17,442 0.400 98 0.96 Roof 20,400 0.468 98 0.96 Sidewalk 0 0.000 98 0.96 Sidewalk 0 0.000 98 0.96 - 0 0.000 98 0.96 Gravel Road 6,455 0.148 85 0.7 Total 34,542 0.793 Total 26,855 0.617 - Pervious Pervious Lawn 166,499 3.822 69 0.38 Lawn 334,990 7.690 69 0.38 Managed Pervious 0 0.000 61 0.22 Managed Pervious 0 0.000 61 0.22 _ Forest 8,455 0.194 55 0.1 Forest 447,263 10.268 55 0.1 Natural Wetland 0 0.000 55 0.1 Natural Wetland 0 0.000 55 0.1 Riparian Buffer 0 0.000 55 0.1 Riparian Buffer 0 0.000 55 0.1 Open Water 0 0.000 30 0.15 Open Water 0 0.000 30 0.15 - 0 0.000 30 0.15 - 0 0.000 30 0.15 Total 174,955 4.016 Total 782,253 17.958 BMP Area 0 0.000 30 0.15 BMP Area 0 0.000 30 0.15 BMP Area Water 0 0.000 30 0.15 BMP Area Water 0 0.000 30 0.15 Total Area 209,496 4.809 Total Area 809,108 18.575 %Impervious 16.49% %Impervious 3.32% Basin Weighted 73 0.464 1 Basin Weighted 62 0.242 6 BOA PER LOT 2907 SF 7 BUA PER LOT 2907 SF , �7. BCSC `,��'%f BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: DATE: LOCATION: SNOW CAMP, NC CHECKED: DATE CIRCLE ONE: (EXISTING DEVELOPED DA-PRE(1 OF 2) 1. SHEET FLOW SEGMENT ID A 1. Surface description(table 3-1) Cult-<_20% 2. Manning's roughness coefficient, n(table 3-1) 0.06 _ 3. Flow length, L(total L <_300 ft) ft 100 4. Two-year 24-hour rainfall, P in 3.12 5. Land slope,s ft/ft 0.0360 6. Tt=0.007(nL)^0.8 Compute Tt hr 0.06 + I 0.061 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID A 7. Surface description(paved or unpaved) Unpaved 8. Flow length, L ft 404 9. Watercourse slope,s ft/ft 0.0350 10. Average velocity,V(figure 3-1) 3.018 11. Tt= L Compute Tt hr 0.04 + I 0.041 3600 V 3. CHANNEL FLOW SEGMENT ID A B C 12. Channel type(Pipe or Open Channel) Open Channel Pipe Open Channel 13. Cross sectional flow area,a ft2 9.80 3.14 15.63 14. Wetted perimeter,pw ft_ 14.28 6.28 13.46 15. Hydraulic radius r=a/pw Computer ft_ 0.69 0.50 1.16 16. Channel slope,s ft/ft 0.040 0.017 0.040 17. Manning's roughness coefficient, n 0.050 0.012 0.040 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 4.64 10.20 8.23 19. Flow length, L ft 257 41 114 20. Tt= L Compute Tt hr 0.02 + 0.00 + 0.00 3600 V 0.021 121. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.12 Min = 7.2 Reference: Urban Hydrology for Small Watersheds Rainfall,P,taken from DA-PRE(1 OF 2) P200375_TOC Calcs.xlsx 5/13/2024 BCSC BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: DATE: LOCATION: SNOW CAMP, NC CHECKED: DATE CIRCLE ONE: (EXISTING DEVELOPED DA-PRE (2 OF 2) 1. SHEET FLOW SEGMENT ID 1. Surface description(table 3-1) 2. Manning's roughness coefficient, n(table 3-1) 3. Flow length, L(total L <_300 ft) ft 4. Two-year 24-hour rainfall, P in 5. Land slope,s ft/ft 6. Tt=0.007(nL)^0.8 Compute Tt hr + I 0.001 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID 7. Surface description(paved or unpaved) 8. Flow length, L ft 9. Watercourse slope,s ft/ft 10. Average velocity,V(figure 3-1) 11. Tt= L Compute Tt hr + I 0.001 3600 V 3. CHANNEL FLOW SEGMENT ID D E 12. Channel type(Pipe or Open Channel) Open Channel Open Channel 13. Cross sectional flow area,a ft2 0.40 304.00 14. Wetted perimeter,pw ft 4.02 4.02 15. Hydraulic radius r=a/pw Computer ft 0.10 75.62 16. Channel slope,s ft/ft 0.051 0.003 17. Manning's roughness coefficient, n _ 0.050 0.040 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 1.45 36.49 19. Flow length, L ft 1117 637 20. Tt= L Compute Tt hr 0.21 + 0.00 I 0.211 3600 V 21. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.21 Min = 12.6 22. Total Watershed or subarea Tc or Tt(add Tt in steps 21 of DA-PRE(1 OF 2) Hr= 0.33 Min = 19.8 DA-PRE(2 OF 2) P200375_TOC Calcs.xlsx 5/13/2024 BCSC BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: EPS DATE: LOCATION: SNOW CAMP, NC CHECKED: DATE CIRCLE ONE: EXISTING (DEVELOPED DA-POST SCM 1 1. SHEET FLOW SEGMENT ID A 1. Surface description(table 3-1) Grass-Dense 2. Manning's roughness coefficient, n(table 3-1) 0.24 _ 3. Flow length, L(total L <_300 ft) ft 100 4. Two-year 24-hour rainfall, P in 3.12 5. Land slope,s ft/ft 0.0420 6. Tt=0.007(nL)^0.8 Compute Tt hr 0.18 + I 0.181 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID A 7. Surface description(paved or unpaved) Unpaved 8. Flow length, L ft 219 9. Watercourse slope,s ft/ft 0.0776 10. Average velocity,V(figure 3-1) 4.495 11. Tt= L Compute Tt hr 0.01 + I 0.01 I 3600 V 3. CHANNEL FLOW SEGMENT ID A 12. Channel type(Pipe or Open Channel) Open Channel 13. Cross sectional flow area,a ft2 8.67 14. Wetted perimeter,pw ft 10.75 _ 15. Hydraulic radius r=a/pw Compute r ft 0.81 _ 16. Channel slope,s ft/ft 0.043 17. Manning's roughness coefficient, n 0.030 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 8.92 19. Flow length, L ft 695 20. Tt= L Compute Tt hr 0.02 + I 0.021 3600 V 21. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.21 Min = 12.6 Reference: Urban Hydrology for Small Watersheds Rainfall,P,taken from Technical Release 55,Soil Conservation Service CMSWS Storm Water Design Manual,January 2014 DA-POST SCM 1 P200375_TOC Calcs.xlsx 5/13/2024 ,,......, ` BCSC .z.,��'%f BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: EPS DATE: LOCATION: SNOW CAMP, NC CHECKED: DATE CIRCLE ONE: EXISTING (DEVELOPE.CD DA-POST SCM 2 1. SHEET FLOW SEGMENT ID A 1. Surface description(table 3-1) Cult-<_20% 2. Manning's roughness coefficient, n(table 3-1) 0.06 _ 3. Flow length, L(total L <_300 ft) ft 100 4. Two-year 24-hour rainfall, P in 3.12 5. Land slope,s ft/ft 0.0140 6. Tt=0.007(nL)^0.8 Compute Tt hr 0.09 + I 0.09 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID A 7. Surface description(paved or unpaved) Unpaved 8. Flow length, L ft 452 9. Watercourse slope,s ft/ft 0.0398 10. Average velocity,V(figure 3-1) 3.219 11. Tt= L Compute Tt hr 0.04 + I 0.04 3600 V 3. CHANNEL FLOW SEGMENT ID A B C 12. Channel type(Pipe or Open Channel) Open Channel Pipe Open Channel 13. Cross sectional flow area,a ft2 12.07 3.14 23.75 14. Wetted perimeter,pw ft 12.75 6.28 17.81 15. Hydraulic radius r=a/pw Compute r ft__ 0.95 0.50 1.33 16. Channel slope,s ft/ft 0.038 0.019 0.064 17. Manning's roughness coefficient, n _ 0.030 0.012 0.030 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 9.33 10.78 15.22 19. Flow length, L ft 1076 52 374 20. Tt= L Compute Tt hr, 0.03 + 0.00 + 0.01 3600 V 0.04 21. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.17 Min = 10.2 Reference: Urban Hydrology for Small Watersheds Rainfall,P,taken from DA-POST SCM 2 P200375_TOC Calcs.xlsx 5/13/2024 BCSC BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: EPS DATE: LOCATION: SNOW CAMP, NC CHECKED: DATE CIRCLE ONE: EXISTING (DEVELOPED DA-POST SCM 3 1. SHEET FLOW SEGMENT ID A 1. Surface description(table 3-1) Grass-Dense 2. Manning's roughness coefficient, n(table 3-1) 0.24 _ 3. Flow length, L(total L <_300 ft) ft 100 4. Two-year 24-hour rainfall, P in 3.12 5. Land slope,s ft/ft 0.0300 6. Tt=0.007(nL)^0.8 Compute Tt hr 0.20 + I 0.201 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID A 7. Surface description(paved or unpaved) Unpaved 8. Flow length, L ft 423 9. Watercourse slope,s ft/ft 0.0400 10. Average velocity,V(figure 3-1) 3.227 11. Tt= L Compute Tt hr 0.04 + I 0.041 3600 V 3. CHANNEL FLOW SEGMENT ID A 12. Channel type(Pipe or Open Channel) Open Channel 13. Cross sectional flow area,a ft2 12.07 14. Wetted perimeter,pw ft 12.75 _ 15. Hydraulic radius r=a/pw Compute r ft 0.95 _ 16. Channel slope,s ft/ft 0.035 17. Manning's roughness coefficient, n 0.030 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 8.96 19. Flow length, L ft 797 20. Tt= L Compute Tt hr 0.02 + I 0.021 3600 V 21. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.26 Min = 15.6 Reference: Urban Hydrology for Small Watersheds Rainfall,P,taken from Technical Release 55,Soil Conservation Service CMSWS Storm Water Design Manual,January 2014 DA-POST SCM 3 P200375_TOC Calcs.xlsx 5/13/2024 ,,......, ` BCSC 4.,��'%f BATEMAN CIVIL SURVEY COMPANY TIME OF CONCENTRATION (Tc) OR TRAVEL TIME (Tt) PROJECT NAME: CANE CREEK PHASE 8 CALCS BY: EPS DATE: LOCATION: SNOW CAMP, NC CHECKED: _ DATE CIRCLE ONE: EXISTING (DEVELOPED DA-POST UNTREATED 1. SHEET FLOW SEGMENT ID A 1. Surface description(table 3-1) Grass-Dense 2. Manning's roughness coefficient, n(table 3-1) 0.24 _ 3. Flow length, L(total L <_300 ft) ft_ 100 4. Two-year 24-hour rainfall, P in 3.12 5. Land slope,s ft/ft 0.0500 6. Tt=0.007(nL)^0.8 Compute Tt hr 0.17 + I 0.171 P2^0.5 s^0.4 2. SHALLOW CONCENTRATED FLOW SEGMENT ID A 7. Surface description(paved or unpaved) Unpaved 8. Flow length, L ft 328 9. Watercourse slope,s ft/ft 0.1330 10. Average velocity,V(figure 3-1) 5.884 11. Tt= L Compute Tt hr 0.02 + I 0.021 3600 V 3. CHANNEL FLOW SEGMENT ID A B 12. Channel type(Pipe or Open Channel) Open Channel Open Channel 13. Cross sectional flow area,a ft2 0.40 304.00 14. Wetted perimeter,pw ft_ 4.02 4.02 15. Hydraulic radius r=a/pw Computer ft 0.10 75.62 16. Channel slope,s ft/ft 0.027 0.003 17. Manning's roughness coefficient, n 0.030 0.040 18. V=[1.49 0(2/3)s^(1/2)]/n Compute V ft/s 1.74 37.68 19. Flow length, L ft 510 628 20. Tt= L Compute Tt hr 0.08 + 0.00 I 0.081 3600 V 21. Watershed or subarea Tc or Tt(add Tt in steps 6, 11,and 19) Hr= 0.27 Min = 16.2 Reference: Urban Hydrology for Small Watersheds Rainfall,P,taken from Technical Release 55,Soil Conservation Service CMSWS Storm Water Design Manual,January 2014 DA-POST UNTREATED P200375_TOC Calcs.xlsx 5/13/2024