HomeMy WebLinkAboutNC0034304_NOVNOI-2024-PC-0455_20240731
Certified Mail # 9589 0710 5270 0475 7190 77
Return Receipt Requested
July 31, 2024
Matthew Knauer
Young Life Ministries
120 Coles Crove Rd
Weaverville, NC 28787
SUBJECT: NOTICE OF VIOLATION & INTENT TO ASSESS CIVIL PENALTY
Tracking Number: NOV-2024-PC-0455
Permit No. NC0034304
Windy Gap Camp WWTP
Buncombe County
Dear Permittee:
The North Carolina Division of Water Resources conducted an inspection of the Windy Gap Camp WWTP on
June 27, 2024. This inspection was conducted to verify that the facility is operating in compliance with the
conditions and limitations specified in NPDES WW Permit No. NC0034304. A summary of the findings and
comments noted during the inspection are provided in the enclosed copy of the inspection report.
The Compliance Evaluation inspection was conducted by Division of Water Resources staff from the Asheville
Regional Office. The following violations were noted during the inspection:
Inspection Area Description of Violation _________________________________________________________________________________________________________________________________________________________________________ Record Keeping Analytical results are not consistent with the data that is being reported on DMR’s. _________________________________________________________________________________________________________________________________________________________________________
Effluent Sampling Composite sampling is not flow proportional. _________________________________________________________________________________________________________________________________________________________________________
A Notice of Violation/Intent to Issue Civil Penalty is being issued for the noted violation of North Carolina General
Statute (G.S.) 143-215.1 and the facility’s NPDES WW Permit. Pursuant to G.S. 143-215.6A, a civil penalty of
not more than twenty-five thousand dollars ($25,000.00) may be assessed against any person who violates or
fails to act in accordance with the terms, conditions, or requirements of any permit issued pursuant to G.S.
143-215.1.
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
If you wish to provide additional information regarding the noted violation, request technical assistance, or discuss
overall compliance please respond in writing within ten (10) business days after receipt of this Notice. A review of
your response will be considered along with any additional information provided. You will then be notified of any
civil penalties that may be assessed regarding the violations. If no response is received in this Office
within the 10-day period, a civil penalty assessment may be prepared.
Remedial actions should have already been taken to correct this problem and prevent further occurrences in the
future. The Division of Water Resources may pursue enforcement action for this and any additional violations of
State law. If the violations are of a continuing nature, not related to operation and/or maintenance problems, and
you anticipate remedial construction activities, then you may wish to consider applying for a Special Order by
Consent.
Reminder: Pursuant to Permit Condition 6 in Section E, the Permittee is required to verbally notify the Regional
Office as soon as possible, not to exceed 24 hours, from first knowledge of any non-compliance at
the facility including limit violations, bypasses of, or failure of a treatment unit. A written report may
be required within 5 days if directed by Division staff. Prior notice should be given for anticipated or
potential problems due to planned maintenance activities, taking units off-line, etc.
If you should have any questions, please do not hesitate to contact Melanie Kemp with the Water Quality
Regional Operations Section in the Asheville Regional Office at 828-296-4500.
Sincerely,
Daniel Boss, Assistant Regional Supervisor
Water Quality Regional Operations Section
Asheville Regional Office
Division of Water Resources, NCDEQ
ATTACHMENTS: Compliance Evaluation Inspection Report
Ec: LF, Gary Kuykendall (ORC)
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
EPA
United States Environmental Protection Agency
Washington, D.C. 20460
Water Compliance Inspection Report
Form Approved.
OMB No. 2040-0057
Approval expires 8-31-98
Section A: National Data System Coding (i.e., PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 N 52 NC0034304 24/06/27 C S31112171819 20
21 66
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved-------------------
N67707172 73 74 75 80
Section B: Facility Data
Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include
POTW name and NPDES permit Number)
Windy Gap Camp WWTP
2000 Lowery St
Weaverville NC 28787
Entry Time/Date Permit Effective Date
Exit Time/Date Permit Expiration Date
09:30AM 24/06/27 20/12/01
Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s)
///
Gary Dean Kuykendall/ORC/828-645-7187/
Other Facility Data
11:00AM 24/06/27 25/10/31
Name, Address of Responsible Official/Title/Phone and Fax Number
Gary D Kuykendall,120 Coles Cove Rd Weaverville NC 28787/Maintenace
Tech/828-645-7187/
Contacted
No
Section C: Areas Evaluated During Inspection (Check only those areas evaluated)
Permit Flow Measurement Operations & Maintenance Records/Reports
Self-Monitoring Program Sludge Handling Disposal Facility Site Review Effluent/Receiving Waters
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date
Melanie Kemp DWR/ARO WQ/ - - /
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete.
Page#1
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
NPDES yr/mo/day
24/06/27
Inspection Type
C3111218
1
Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary)
Melanie Kemp with the Asheville Regional Office conducted a Compliance Evaluation Inspection of
the Windy Gap Camp WWTP on June 27, 2024. This inspection was conducted to determine whether
the facility is being operated and maintained in compliance with NPDES Permit No. NC0034304. Gary
Kuykendall, ORC, was present and assisted with the inspection.
Overall the facility was operating well and no major issues were noted. Recordkeeping review of
DMRs and associated lab reports indicates there are over 60 limits violations that have been
incorrectly reported on DMRs going back to 1/1/2021.
During the inspection, the following issue was noted:
•The DO level (0.66 mg/L) in the steel plant was not within the acceptable range (1.0 – 3.0 mg/L).
During the inspection, the following violations were noted:
•Analytical results are not consistent with the data that is being reported on DMR’s.
•Composite sampling is not flow proportional.
The ORC will need to revise and resubmit all incorrect DMRs.
NC0034304 17 (Cont.)
Page#2
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
Permit:NC0034304
Inspection Date:06/27/2024
Owner - Facility:
Inspection Type:
Windy Gap Camp WWTP
Compliance Evaluation
Operations & Maintenance Yes No NA NE
Is the plant generally clean with acceptable housekeeping?
Does the facility analyze process control parameters, for ex: MLSS, MCRT, Settleable
Solids, pH, DO, Sludge Judge, and other that are applicable?
The ORC analyzes for settlable solids 2x/day, pH daily, DO 2x/week, and sludge judge
2x/week.
Comment:
Record Keeping Yes No NA NE
Are records kept and maintained as required by the permit?
Is all required information readily available, complete and current?
Are all records maintained for 3 years (lab. reg. required 5 years)?
Are analytical results consistent with data reported on DMRs?
Is the chain-of-custody complete?
Dates, times and location of sampling
Name of individual performing the sampling
Results of analysis and calibration
Dates of analysis
Name of person performing analyses
Transported COCs
Are DMRs complete: do they include all permit parameters?
Has the facility submitted its annual compliance report to users and DWQ?
(If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified
operator on each shift?
Is the ORC visitation log available and current?
Is the ORC certified at grade equal to or higher than the facility classification?
Is the backup operator certified at one grade less or greater than the facility
classification?
Is a copy of the current NPDES permit available on site?
Facility has copy of previous year's Annual Report on file for review?
There are over 60 falsely reported results that violate permit limits for fecal, BOD, TSS,
and ammonia results going back to 1/1/2021.
Comment:
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new
application?
Is the facility as described in the permit?
Page#3
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
Permit:NC0034304
Inspection Date:06/27/2024
Owner - Facility:
Inspection Type:
Windy Gap Camp WWTP
Compliance Evaluation
Permit Yes No NA NE
# Are there any special conditions for the permit?
Is access to the plant site restricted to the general public?
Is the inspector granted access to all areas for inspection?
Comment:
Bar Screens Yes No NA NE
Type of bar screen
a.Manual
b.Mechanical
Are the bars adequately screening debris?
Is the screen free of excessive debris?
Is disposal of screening in compliance?
Is the unit in good condition?
Manual bar screen is cleaned daily.Comment:
Equalization Basins Yes No NA NE
Is the basin aerated?
Is the basin free of bypass lines or structures to the natural environment?
Is the basin free of excessive grease?
Are all pumps present?
Are all pumps operable?
Are float controls operable?
Are audible and visual alarms operable?
# Is basin size/volume adequate?
Low/normal flow goes directly into the aeration basin and the EQ basin serves as a
surge tank. It should be noted that there are plans for the EQ tank to be replaced with
a new one of the same size.
Comment:
Aeration Basins Yes No NA NE
Mode of operation Ext. Air
Type of aeration system Diffused
Is the basin free of dead spots?
Are surface aerators and mixers operational?
Are the diffusers operational?
Page#4
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
Permit:NC0034304
Inspection Date:06/27/2024
Owner - Facility:
Inspection Type:
Windy Gap Camp WWTP
Compliance Evaluation
Aeration Basins Yes No NA NE
Is the foam the proper color for the treatment process?
Does the foam cover less than 25% of the basin’s surface?
Is the DO level acceptable?
Is the DO level acceptable?(1.0 to 3.0 mg/l)
The steel plant (above) is often turned off in the winter when flows are lower. Steel
plant: settability 55%, DO 0.66 mg/L. Concrete plant: settleability 80%, DO 3.75 mg/L.
Comment:
Secondary Clarifier Yes No NA NE
Is the clarifier free of black and odorous wastewater?
Is the site free of excessive buildup of solids in center well of circular clarifier?
Are weirs level?
Is the site free of weir blockage?
Is the site free of evidence of short-circuiting?
Is scum removal adequate?
Is the site free of excessive floating sludge?
Is the drive unit operational?
Is the return rate acceptable (low turbulence)?
Is the overflow clear of excessive solids/pin floc?
Is the sludge blanket level acceptable? (Approximately ¼ of the sidewall depth)
Sludge blanket 5.5/15 feet at concrete plant clarifier and 5/10 ft at steel plant clarifier.Comment:
De-chlorination Yes No NA NE
Type of system ?Chlorine
Is the feed ratio proportional to chlorine amount (1 to 1)?
Is storage appropriate for cylinders?
# Is de-chlorination substance stored away from chlorine containers?
Comment:
Are the tablets the proper size and type?
Are tablet de-chlorinators operational?
Number of tubes in use?2
Comment:
Disinfection-Tablet Yes No NA NE
Page#5
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
Permit:NC0034304
Inspection Date:06/27/2024
Owner - Facility:
Inspection Type:
Windy Gap Camp WWTP
Compliance Evaluation
Disinfection-Tablet Yes No NA NE
Are tablet chlorinators operational?
Are the tablets the proper size and type?
Number of tubes in use?4
Is the level of chlorine residual acceptable?
Is the contact chamber free of growth, or sludge buildup?
Is there chlorine residual prior to de-chlorination?
The contact chamber is pumped 2x/year.Comment:
Flow Measurement - Effluent Yes No NA NE
# Is flow meter used for reporting?
Is flow meter calibrated annually?
Is the flow meter operational?
(If units are separated) Does the chart recorder match the flow meter?
Flow meter last calbirated 3/27/24.Comment:
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained?
Are the receiving water free of foam other than trace amounts and other debris?
If effluent (diffuser pipes are required) are they operating properly?
Comment:
Effluent Sampling Yes No NA NE
Is composite sampling flow proportional?
Is sample collected below all treatment units?
Is proper volume collected?
Is the tubing clean?
# Is proper temperature set for sample storage (kept at less than or equal to 6.0
degrees Celsius)?
Is the facility sampling performed as required by the permit (frequency, sampling type
representative)?
Composite sampling is not flow proportional. All grab samples are collected from the
effluent pipe and compostite samples are pulled from a manhole below all treatment
units.
Comment:
Page#6
Docusign Envelope ID: DF3B3A4E-8308-42A8-AC47-79BC3BC6627B
Permit:NC0034304
Inspection Date:06/27/2024
Owner - Facility:
Inspection Type:
Windy Gap Camp WWTP
Compliance Evaluation
Upstream / Downstream Sampling Yes No NA NE
Is the facility sampling performed as required by the permit (frequency, sampling type,
and sampling location)?
Upstream samples are collected next to the shop and downstream are collected near
the gate bridge.
Comment:
Aerobic Digester Yes No NA NE
Is the capacity adequate?
Is the mixing adequate?
Is the site free of excessive foaming in the tank?
# Is the odor acceptable?
# Is tankage available for properly waste sludge?
There are two digesters. The concrete plant wastes to either and the steel plant wastes
to the larger/lower digester only. About one load is pumped from the digesters weekly.
Air is only added to the smaller digester on occasion.
Comment:
Page#7