Loading...
HomeMy WebLinkAboutWQ0014391_SOC Application_20240719Initial Review Reviewer nathaniel.thornburg Is this submittal an application? (Excluding additional information.) * Yes No If not an application what is the submittal type?* Annual Report Residual Annual Report Additional Information Other SOC Application Permit Number (IR) * W00014391 Applicant/Permittee Builders FirstSource - Raleigh, LLC Email Notifications Does this need review by the hydrogeologist? * Yes No Regional Office CO Reviewer Admin Reviewer Submittal Form Project Contact Information Please provide information on the person to be contacted by NDB Staff regarding electronic submittal, confirmation of receipt, and other correspondence. ...................................................................................................................................................................................................................................................................................... ... ... ... ... ... .. ... ... ... ... .. Name* Annie Foxworth Email Address* annie.foxworth@macconnellandassoc.com Project Information ......................... Application/Document Type* New (Fee Required) Modification - Major (Fee Required) Renewal with Major Modification (Fee Required) Annual Report Additional Information Other SOC Application Phone Number* 9194671239 Modification - Minor Renewal GW-59, NDMR, NDMLR, NDAR-1, N DAR-2 Residual Annual Report Change of Ownership We no longer accept these monitoring reports through this portal. Please click on the link below and it will take you to the correct form. https:Hedocs.deq.nc.gov/Forms/NonDischarge Monitori ng_Report Permit Type:* Wastewater Irrigation High -Rate Infiltration Other Wastewater Reclaimed Water Closed -Loop Recycle Residuals Single -Family Residence Wastewater Other Irrigation Permit Number: * WQ0014391 Has Current Existing permit number Applicant/Permittee Address* 23 Red Cedar way, Apex, NC Facility Name * Builders FirstSource - Apex Yard WWTF Please provide comments/notes on your current submittal below. At this time, paper copies are no longer required. If you have any questions about what is required, please contact Nathaniel Thornburg at nathaniel.thornburg@ncdenr.gov. Please attach all information required or requested for this submittal to be reviewed here. (Application Form, Engineering Plans, Specifications, Calculations, Etc.) A55302.00 - SOC-Application Package - Signed and 6.81 MB Sealed.pdf Upload only 1 PDF document (less than 250 MB). Multiple documents must be combined into one PDF file unless file is larger than upload limit. * By checking this box, I acknowledge that I understand the application will not be accepted for pre -review until the fee (if required) has been received by the Non -Discharge Branch. Application fees must be submitted by check or money order and made payable to the North Carolina Department of Environmental Quality (NCDEQ). I also confirm that the uploaded document is a single PDF with all parts of the application in correct order (as specified by the application). Mail payment to: NCDEQ — Division of Water Resources Attn: Non -Discharge Branch 1617 Mail Service Center Raleigh, NC 27699-1617 Signature G46V;. lAviwi-M Submission Date 6/28/2024 Builder FirstSource — Raleigh, LLC Apex Yard WWTF Special Order By Consent Permit No. WQ0014391 23 Red Cedar Way Chatham County, North Carolina Project No.: A55302.00 Submittal Date: June SEAL 17069 _ �I �'%,cq,�iy•SHGI NC Ai00\ Prepared By: MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 P.O. Box 129 Cary, NC 27513 Morrisville, NC 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Table of Contents • Cover Letter • Application Form • Necessary Narrative & Engineer's Certification • Predicted Compliance Schedule • Funding Sources Identification Builders FirstSource — Raleigh, LLC Chatham County Special Order By Consent Cover Letter SEAL 17069 c9 ' • FNG X N cc��`\��� C �Z G Z t, inns MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 P.O. Box 129 Morrisville, NC 27560 (919)467-1239 MacCONNELL & Associates, P.C. "Engineering Today For Tomorrow's Future" June 20, 2024 To: Nathaniel Thornburg NC Division of Water Resources Division of Water Resources- Non -Discharge Branch Attn: Nathaniel Thornburg- 9th Floor, Office #942X. 512 N. Salisbury St. Raleigh, NC 27604 Telephone: (919) 707-3653 To Mr. Thornburg: 501 Cascade Pointe Lane Suite 103 Cary, NC 27513 www.macconnellandassoc.com This letter accompanies a Special Order by Consent Application to an existing Wastewater Irrigation System Permit (No. WQ00149391). Builders FirstSource — Apex Yard WWTF received a Notice of Violation on January10, 2024 for exceeding its Monthly Average Limit of Ammonia concentration. Underlying causes for the violation are of a continuing nature and modifications to the WWTF are required. A Special Order by Consent has been requested to avoid any further violations while corrective actions are taken. Within the application package you will find the following information: o Cover Letter o Application Form o Necessity Narrative & Engineer's Certification o Predicted Sources Identification o Funding Sources Identification Thank you for your consideration. If you have any questions or require additional information, please contact me or Annie Foxworth at (919) 467-1239. Sincerely, Gary MacConnell, PE President Builders FirstSource — Raleigh, LLC Chatham County Special Order By Consent Application Form SEAL 9069 G' '• • ENG INE�7��`v`�� MacConnell & Associates, P.C. 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER RESOURCES APPLICATION FOR A SPECIAL ORDER BY CONSENT (SOC) I. PERMIT RELATED INFORMATION: 1. Applicant (corporation, individual, or other): Builders FirstSource - Raleigh, LLC 2. Print or Type Owner's or Signing Official's Name and Title: Mark Berthold, Director of Facilites 3. Facility Name (as shown on Permit): Builders FirstSource - Apex Yard WWTF 4. Owner Phone: (303) 262-8600 (Office) (or) (303) 532-9978 (Cell) 5. Owner Email: Mark. Berthold@BLDR.com 4. Application Date: June 20, 2024 5. NPDES Permit No. (if applicable): Non -Discharge Permit No. WQ0014391 6. Name of the specific wastewater treatment facility (if different from 1..3. above): II. PRE -APPLICATION MEETING: Prior to submitting this completed application form, applicants must meet with the appropriate regional office staff to discuss whether or not an SOC is appropriate for this situation. Please note the date this meeting occurred and who represented the permittee: Representative: James Westcott (By Phone) Date: June 18, 2024 III. ADDITIONAL FLOW OR FLOW REALLOCATION: In accordance with NCGS 143-215.67(b), only facilities owned by a unit of government may request additional flow. Additional flow may be allowed under an SOC only in specific circumstances. These circumstances may include eliminating discharges that are not compliant with an NPDES or Non -discharge permit. These circumstances do not include failure to perform proper maintenance of treatment systems, collection systems or disposal systems. When requesting additional flow, the facility must include its justification and supporting documentation. If the requested additional flow is non -domestic, the facility must be able to demonstrate the ability to effectively treat the waste and dispose of residuals. The applicant must provide a detailed analysis of the constituents in the proposed non -domestic wastewater. The total domestic additional flow requested: 0 gallons per day. The total non -domestic additional flow requested: 0 gallons per day. The total additional flow (sum of the above): 0 gallons per day. Please attach a detailed description or project listing of the proposed allocation for additional flow, with an explanation of how flow quantities were estimated. Further, any additional flow requested must be justified by a complete analysis, by the permittee, that additional flow will not adversely impact wastewater collection/treatment facilities or surface waters. IV. NECESSITY NARRATIVE: Please attach a narrative providing a detailed explanation of the circumstances regarding the necessity of the proposed SOC. Include the following issues: • Existing and/or unavoidable future violations(s) of permit conditions or limits(s), • The existing treatment process and any process modifications that have been made to date to ensure optimum performance of existing facilities, • Collection system rehabilitation work completed or scheduled (including dates), • Coordination with industrial users regarding their discharges or pretreatment facilities. Identify any non -compliant significant industrial users and measure(s) proposed or already taken to bring the pretreatment facilities back into compliance. If any industrial facilities are currently under consent agreements, please attach these agreements, • Date and outcome of last Industrial Waste Survey, • Whether or not the facility is acting as a regional facility receiving wastewater from other municipalities having independent pretreatment programs. V. CERTIFICATION: The applicant must submit a report prepared by an independent professional with expertise in wastewater treatment. This report must address the following: • An evaluation of existing treatment units, operational procedures and recommendations as to how the efficiencies of these facilities can be maximized. The person in charge of such evaluation must sign this document. • A certification that these facilities could not be operated in a manner that would achieve compliance with final permit limits. The person making such determination must sign this certification. • The effluent limits that the facility could be expected to meet if operated at their maximum efficiency during the term of the requested SOC (be sure to consider interim construction phases). • Any other actions taken to correct problems prior to requesting the SOC. 2 VI. PREDICTED COMPLIANCE SCHEDULE: The applicant must submit a detailed listing of activities along with time frames that are necessary to bring the facility into compliance. This schedule should include milestone dates for beainnina construction. endine construction. and achieving final compliance at a minimum. In determining the milestone dates, the following should be considered: • Time for submitting plans, specifications and appropriate engineering reports to DWR for review and approval. • Occurrence of major construction activities that are likely to affect facility performance (units out of service, diversion of flows, etc.) to include a plan of action to minimize impacts to surface waters. • Infiltration/Inflow work, if necessary. • Industrial users achieving compliance with their pretreatment permits if applicable. • Toxicity Reduction Evaluations (TRE), if necessary. VII. FUNDING SOURCES IDENTIFICATION: The applicant must list the sources of funds utilized to complete the work needed to bring the facility into compliance. Possible funding sources include but are not limited to loan commitments, bonds, letters of credit, block grants and cash reserves. The applicant must show that the funds are available, or can be secured in time to meet the schedule outlined as part of this application. If funding is not available at the beginning of the SOC process, the permittee must submit a copy of all funding applications to ensure that all efforts are being made to secure such funds. Note: A copy of the application should be sufficient to demonstrate timeliness unless regional office has reason to request all information associated with securing funding. THE DIVISION OF WATER RESOURCES WILL NOT ACCEPT THIS APPLICATION PACKAGE UNLESS ALL OF THE APPLICABLE ITEMS ARE INCLUDED WITH THE SUBMITTAL. Required Items: a. One original and two copies of the completed and appropriately executed application form, along with all required attachments. If the SOC is for a City / Town, the person signing the SOC must be a ranking elected official or other duly authorized employee. If the SOC is for a Corporation / Company / Industry / Other, the person signing the SOC must be a principal executive officer of at least the level of vice- president, or his duly authorized representative. If the SOC is for a School District, the person signing the SOC must be the Superintendent of Schools or other duly authorized employee. 3 Note: Reference to signatory requirements in SOCs may be found in the North Carolina Administrative Code [T15A NCAC 2H .1206(a)(3)]. b. The non-refundable Special Order by Consent (SOC) processing fee of $400.00. A check must be made payable to The Department of Environment and Natural Resources. c. An evaluation report prepared by an independent consultant with expertise in wastewater. (in triplicate) APPLICANT'S CERTIFICATION: (NO MODIFICATION TO THIS CERTIFICATION IS ACCEPTABLE) 1, Mark Berthold, Director of Faeilites , attest this application for a Special Order by Consent (SOC) has been reviewed by me and is accurate and complete to the best of my knowledge. I understand if all required parts of this application are not completed and if all required supporting information and attachments are not included, this application package may be returned as incomplete. (Please be advised that the return of this application does not prevent DWR from collecting all outstanding penalties upon request). Furthermore, I attest by my signature that I fully understand that an upfront penalty, which may satisfy as a full settlement of outstanding violations, may be imposed. {Note: Reference to upfront penalties in Special Orders by Consent may be found in the North Carolina Administrative Code [T15A NCAC 2H .1206(c)(3)].) ��. Comer 3rG_� Date Signature of Signing Official Mark Berthold -Builders FirstSource Director of Facilities (Design and Construction) 11)2 TJ/�L� 7595 Technology Way, Suite 500 Printed' Name of Si nin 6 fficial Denver, Co 80237 g g Mark.Berthold@BLDR.com O: 303-262-8600 1 C:303-532-9978 I BLDR.com THE COMPLETED APPLICATION PACKAGE, INCLUDING THE ORIGINAL AND TWO COPIES OF ALL SUPPORTING INFORMATION AND MATERIALS, SHOULD BE SENT TO THE FOLLOWING ADDRESS: NORTH CAROLINA DIVISION OF WATER RESOURCES POINT SOURCE BRANCH 1617 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1617 IF THIS APPLICATION IS FOR A NON -DISCHARGE SYSTEM, THEN SEND TO: NORTH CAROLINA DIVISION OF WATER QUALITY AQUIFER PROTECTION SECTION 1636 MAIL SERVICE CENTER RALEIGH, NORTH CAROLINA 27699-1636 4 Builders FirstSource — Raleigh, LLC Chatham County Special Order By Consent Necessary Narrative & Engineer's Certification SEAL 17069 MacConnell & Associates, P.C. c9,Qy FNGINO �e �', 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 P.O. Box 129 Morrisville, NC 27560 (919) 467-1239 MacCONNELL & Associates, P.C. "}_.nemccrim, l oda\ For 1 om0IT, W," f IItttrC• Facility Builders FirstSource—Apex WWTF Owner Builders FirstSource — Raleigh, LLC Permit Number WQ00149391 Facility Address 23 Red Cedar Way, Apex, NC 27523 County Chatham 501 Cascade Pointe Lane Suite 103 Carv, NC 27513 www.macconnellandassoc.com Builders FirstSource - Raleigh, LLC currently holds a permit for the above -mentioned wastewater treatment and irrigation facility (WWTF). The system is sized to treat 3,750 GPD of strictly domestic wastewater (150 employees at 25 GPD based on a five-day work week) and consists of the following components: • One 3,000-gallon septic tank (first -in -series) • One 2,000-gallon septic tank (second series) • Two 3,000-gallon pump tanks installed -in -series with two 29-GPM pumps • Four EZ Treat Model 1200 recirculating media filter pods • One ultraviolet disinfection unit • One 299,000-gallon synthetically lined storage pond • One irrigation pump station with two 31 GPM pumps and effluent flow meter • 3.6 acres of irrigation area consisting of eight zones and all associated piping, valves, controls, and appurtenances. On January 10, 2024, the WWTF received a violation for exceeding its Monthly Average Limit of Ammonia (Tracking Number: NOV-024-LV 0046). A Special Order by Consent has been requested to avoid any further violations while corrective actions are taken. MacConnell and Associates, PC has been retained to evaluate and design an immediate solution. On April 22, 2024, Gary S. MacConnell, PE and Annie Foxworth, EI visited the site to inspect current conditions. All existing components of the treatment system appeared to be in satisfactory condition. Review of non -discharge monitoring reports indicate that recent samplings with high Ammonia concentrations had lower pH ranges. Flow records range from 500-1,200 GPD, less than half the design treatment capacity. The Operator has also expressed difficulty meeting the Ammonia limits with the WWTF's current configuration. Based upon the WWTF's current configuration and non -discharge monitoring reports, M&A recommends that flow equalization to be installed at the front of the system. High levels of ammonia indicate that the EZ Treat Treatment System is overwhelmed with surges of peak flow (which typically occurs around lunch time). When a surge of peak flow occurs, wastewater does not receive adequate anaerobic and aerobic treatment. Detention time in the septic tanks is shortened and the recirculation ratio of wastewater received by the EZ Treat treatment pods is reduced. Current configurations of EZ Treat Treatment systems are typically installed with a pre - flow equalization tank so that the recirculation tank and treatment pods are gradually dosed to allow for a consistent 5 to 7 recirculation ratio. EZ Treat treatment systems with pre -flow equalization have consistently shown the ability to produce reuse quality water. It is also recommended that a calcite filter provided by EZ Treat be added to the WWTF to provide additional alkalinity for the nitrification of ammonia. Although it is not a result of any violations, the irrigation field's control panel has reached the end of its life and it also in need of replacement as well. With the proposed design modifications, it can be expected that ammonia concentrations will return to 6 mg/1, well below the Month Average Limit of 15 mg/l. Predicted Compliance Schedule can be found in the subsequent sections of this application package. Per the monitoring requirements of the permit, sampling for ammonia is conducted three times a year (March, July, and November). Possible future violations would include July and November of 2024. Builders FirstSource — Raleigh, LLC Chatham County Special Order By Consent Predicted Compliance Schedule SEAL 11o69 MIZI MacConnell & Associates, P.C. S. G 1111000 501 Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Predicted Compliance Schedule Submit design modification to North Carolina DEQ's Non -discharge Branch for review (by 07/31/2024) ***Time Line Assumes Approximately 120 Days of Review and Approval (by 11/28/2024)*** Schedule Construction to begin within 60 days of design approval (by 01/27/2025) Construction shall be completed within 60 days from start (by 03/25/2025) Builders FirstSource — Raleigh, LLC Chatham County Special Order By Consent Funding Sources Identification 17069 40 MC /Ii/1111 A C0001�/Zo�zvZ�/ MacConnell & Associates, P.C. Cascade Pointe Lane, Suite 103 Cary, North Carolina 27513 P.O. Box 129 Morrisville, North Carolina 27560 Phone: (919) 467-1239 Fax: (919) 319-6510 Funding Sources Identification Builders FirstSource is a profitable company. Once the engineering design is complete, a cost estimate will be obtained. A Capital Expenditure Request (CER) will then be assigned by the Company's corporate headquarters to reserve and allocate funds specifically for this project.