Loading...
HomeMy WebLinkAboutNCG020107_CEI_20240724 ,,STATE, ROY COOPER Governor ELIZABETH S.BISER »,n;=0 , Secretary {"F QUAM WILLIAM E.TOBY VINSON,JR. NORTH CAROLINA Interim Director Environmental Quality 8/5/2024 Vulcan Construction Materials, LLC Attn: Tony Johnson, Environmental Engineer 11020 David Taylor Drive,Suite 400 Charlotte, NC 28262 Subject: COMPLIANCE EVALUATION INSPECTION NPDES Stormwater General Permit NCG020000 Vulcan Construction Materials, LLC Rockingham Quarry, Certificate of Coverage NCG020107 Richmond County Dear Mr. Johnson: On July 24, 2024, a site inspection was conducted for the Rockingham Quarry facility located at 353 Galestown Road, in Richmond County, North Carolina. A copy of the Compliance Inspection Report is enclosed for your review. Along with yourself, Mr. Jared and Mrs. Paula Martin were also present during the inspection and both your and their time and assistance is greatly appreciated. The site visit and file review revealed that the subject facility is covered by NPDES Stormwater General Permit NCG020000 under Certificate of Coverage NCG020107. Permit coverage authorizes the discharge of stormwater from the facility to receiving waters designated as Hitchcock Creek, class C waters in the Yadkin-Pee Dee River Basin. As a result of the inspection, the facility was found to be compliant with the conditions of the NCG020000 permit. Please refer to the enclosed Compliance Inspection Report for additional comments and observations made during the inspection. Please be advised that violations of the NPDES Stormwater General Permit are subject to a civil penalty assessment of up to$25,000 per day for each violation. If you or your staff have any questions, comments, or need assistance with understanding any aspect of your permit, please contact me (472) 215-7248 or via e-mail at Tabytha.smith@nc.deq.gov. Since ely, T b a Smith Environmental Specialist DEMLR Enclosure: Compliance Inspection Report ec: Tony Johnson, Environmental Engineer—Vulcan Construction Materials, LLC DEMLR NPDES Stormwater Permit Laserfiche File cc: FRO—DEMLR, Stormwater Files D--- -------- North Carolina Department of Environmental Quality I Division of Energy,Mineral and Land Resources Fayetteville Regional office I225 Green Street.Suite 7t4 I Fayetteville,North Carolina 28301. a>srcccAl:J,A uowmt.nRarrrmr�ma,ai+wr� �/ 91.0.4333,3300 Compliance Inspection Report Permit:NCG020107 Effective: 07/01/21 Expiration: 06/30/25 Owner: Vulcan Construction Materials LLC SOC: Effective: Expiration: Facility: Rockingham Quarry County: Richmond 353 Galestown Rd Region: Fayetteville Rockingham NC 28380 Contact Person:Tony Johnson Title: Environmental Engineer Phone`.704-547-7076 Directions to Facility: System Classifications: SWNC, Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): On-site representative Tony Johnson 704-547-7076 Related Permits: Inspection Date: 07/24/2024 Entry Time 09:50AM Exit Time: 01:30PM Primary Inspector:Tabytha Smith Phone: 910-433-3300 Secondary Inspector(s): Reason for Inspection: Other Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: 111 Compliant Not Compliant Question Areas: Storm Water - (See attachment summary) Page 1 of 3 Permit: NCG020107 Owner-Facility:Vulcan Construction Materials LLC _ Inspection Date: 07/24/2024 Inspection Type:Compliance Evaluation Reason for Visit: Other Inspection Summary: Staff from the Fayetteville Regional Office,Tabytha Smith and Nick Mills conducted an inspection to ensure compliance of the NCGO2 permit. Met with Tony Johnson, Plant Manager. Discussed the site implementation of the SWPPP and their monitoring requirements,which are complete and updated annually per requirement.Weekly BMP inspections were documented.Visited the representative ouffalls and observed all were in good operating condition. This is the most updated inspection report. The last inspection report had a box that was mistakenly pressed. Page 2 of 3 Permit: NCG020107 Owner-Facility:Vulcan Construction Materials LLC Inspection Date: 07/24/2024 Inspection Type:Compliance Evaluation Reason for Visit: Other Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? 0 ❑ #Does the Plan include a General Location (USGS)map? • 0 10 0 #Does the Plan include a"Narrative Description of Practices"? #Does the Plan include a detailed site map including outfall locations and drainage areas? • #Does the Plan include a fist of significant spills occurring during the past 3 years? • 0 Cl #Has the facility evaluated feasible alternatives to current practices? #Does the facility provide all necessary secondary containment? #Does the Plan include a BMP summary? ■ 0 0 #Does the Plan include a Spill Prevention and Response Plan (SPRP)? • ❑ El 0 #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? #Does the facility provide and document Employee Training? #Does the Plan include a list of Responsible Party(s)? #Is the Plan reviewed and updated annually? #Does the Plan include a Stormwater Facility Inspection Program? • El ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 El Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? • #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? CI 0 El1 Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ #Were all outfalls observed during the inspection? #If the facility has representative outfall status, is it properly documented by the Division? II El #Has the facility evaluated all illicit(non stormwater)discharges? II 0 El Comment: Page 3 of 3