HomeMy WebLinkAboutNCC242399_ESC Approval Submitted_20240814 Leland Adams
From: SVC_DoNotReply-DEQPermits <DoNotReply-DEQPermits@deq.nc.gov>
Sent: Wednesday, July 31, 2024 8:43 AM
To: Blair Pittman; Permitting
Subject: NC DEMLR - FROF Application Approval with Modifications CRM:0369005
Attachments: FORSY-2025-0132 Rural Hall Fire Station.pdf; Application Report - Wednesday,July 31,
2024 823 AM.pdf
� K,tNESTAIFq,.g
� AY 24/)3D
.n�.
tip* . T,
!2 I]1l
�'rsE QUAM SACO-�*
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Roy Cooper
Governor
Elizabeth S. Biser
Secretary
William Vinson Jr. (Acting)
Director
07-31-2024
Bobbitt Construction, Inc
2400 Weston Parkway
Cary, NC 27513
RE: Project Name: Rural Hall Fire Station
Acres Approved: 1.6
Application ID: PA-006212
Permit Number: FORSY-2025-0132
Address: 177 Rural Hall-Germanton Road
City: Rural Hall
County: Forsyth
River Basin: Roanoke
Stream Classification: C:Aquatic Life,Secondary Contact Recreation, Fresh water
1
Plan Type: Revised Plan
Dear Bobbitt Construction, Inc,
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and
hereby issue this Letter of Approval with Modifications. The Modifications Required for Approval are listed bellow.The
Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of
approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI)
form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is
reviewed and found to be complete, you will receive a link with payment instructions for the $120 annual permit fee. After
the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity.The eNOl form
may be accessed atdeq.nc.gov/NCG01. Please directquestions about the eNOlform totheStormwater Program staff in the
Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a
newCOC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job
site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with
the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural
resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation
control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina
General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to
insure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws,
regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing
activity. This approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the Financial
Responsibility/Ownership Form, which you provided. You are requested to file an amended form if there is any change in
the information included on the form. This permit allows for a land-disturbance, as called for on the application and plan,
not to exceed the approved acres. Exceeding the acreage can be a violation of this permit and may require a revised plan
and additional application fee.In addition, it would be helpful if you notify this office of the proposed starting date for this
project.
Modifications Required for Approval:
1. Please print this email as your Letter of Approval for your NCG010000 Certificate of Coverage application.
2.Please notify this office prior to your pre-construction conference for this project by calling (336) 776-9800 and asking to
speak with the Land Quality inspector for your county. Permission must be obtained and granted from NC DEQ DEMLR
2
prior to the removal of any ESC measures. All additional permits should be obtained, as necessary, prior to beginning
construction. [GS 113A-51, 15A NCAC 4B .0120]
3.Any off-site borrow and waste required for this project must come from a site with an approved erosion control plan, a
site regulated under the Mining Act of 1971, or a landfill regulated by the Division of Solid Waste
Management. Trash/debris from demolition activities or generated by any activities on site must be disposed of at a
facility regulated by the Division of Solid Waste Management or per Division of Solid Waste Management or Division of
Water Resources rules and regulations. [15A NCAC 4B .0110]
4.Additional measures may be required - The applicant is responsible for the control of sediment on-site. If the approved
erosion and sedimentation control measures prove insufficient, the applicant must take those additional steps necessary
to stop sediment from leaving this site. [15A NCAC 4B .0115]
5.The NCG01 has a $120 yearly fee and our office often receives closure inspection requests days prior to yearly NCG01
fee payment due dates. Be advised the project requires a closure inspection report by DEMLR prior to filing the Notice of
Termination (NOT) to terminate NCG01 coverage. The closure inspection should not be requested until after the site has
achieved full vegetative stabilization and measures have been removed. The removal of temporary ESC measures,
including basins, requires prior approval. Often, a full growing season is necessary between initial seeding/mulching and
removal of measures. Please plan your construction accordingly to avoid contacting our office prematurely for a closure
inspection. Also be advised you may be asked for representative site pictures prior to a closure inspection. [General
Comment]
Your cooperation is appreciated.
Sincerely,
Ashley Vikara, El -Assistant Regional Engineer I
Winston-Salem Regional Office, 336-776-9800
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources
Land Quality Section
Enclosures: Certificate of Approval
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land
Resources
Winston-Salem Regional Office 1450 West Hanes Mill Road, Suite 300 I Winston-Salem NC,
i 27105
336-776-9800
Email correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties by an authorized
state official.
3