HomeMy WebLinkAboutNCC242458_ESC Approval Submitted_20240814 (...--DriBE Cps.
i*II �,t. Planning & Development Department
William Jason Guess
PEOPLE TO MATGHj Erosion Control Officer
OUR MOUNTAINS
NORTH CARO��NP
LETTER OF APPROVAL
May 20, 2024 NOTICE — This is not a permit
KLP Pinners EAT, LLC
Attention: Tony Kuechle
222 South Ninth Street, Suite 1600
Minneapolis, MN 55402
RE: Project Name: PINNERS COVE SUBDIVISION
Acres Approved: 42.0 AC
Project#: ER02022-00063
County: BUNCOMBE
City: ASHEVILLE
Address: PINNERS COVE ROAD
River Basin: FRENCH BROAD
Stream Classification: C
Submitted By: TONY KUECHLE
Plan Type: RESIDENTIAL
Dear Sir/Madam,
This office has reviewed the subject erosion and sedimentation control plan. We find the
plan to be acceptable and hereby issue this Letter of Approval.This approval shall
become null and void if you have not made progress on the site within six
months after the date of approval. A one-time six-month extension can be granted for
good cause shown upon receiving a written request from you before the expiration of the
approved plan. This letter of approval is being issued prior to the issuance of the
stormwater permit due to concurrent reviews, but any land disturbing activity associated
with this project shall not begin prior to issuance off all required permits including the
stormwater permit and the land disturbing permit
0401
46 Valley Street—Asheville, NC 28801
p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org
1 ,
1BE co:::
I i II 4� Planning & Development Department
William Jason Guess
PEOPLE TO MATCUJ Erosion Control Officer
OUR MOUNTAINS
N°RTN CARO'.�'P
"As of April 1, 2019, all new construction activities are required to complete and submit
an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCG010000 Construction General Permit. After the form is reviewed and found
to be complete,you will receive a link with payment instructions for the applicable annual
permit fee. After the fee is processed, you will receive the COC via email. As the
Financially Responsible Party shown on the FRO form submitted for this
project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOl form and fee details may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to the Stormwater Program staff in the Raleigh
central office. If the owner/operator of this project changes in the future, the new
responsible party must obtain a new COC.:"
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control
plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of
1973 (North Carolina General Statute 113A-51 through 66), this office may require
revisions to the plan and implementation of the revisions to ensure compliance with the
Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal
and State water quality laws, regulations, and rules. In addition, local city or county
ordinances or rules may also apply to this land-disturbing activity. This approval does not
supersede any other permit or approval.
R
46 Valley Street—Asheville, NC 28801
p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org
(...--DriBE Cps.
i*II �,t. Planning & Development Department
William Jason Guess
iWiaETOMATGHI Erosion Control Officer
OUR MOUNTAINS
N°RTN cARoo'P'
Please note that this approval is based in part on the accuracy of the information provided
in the Financial Responsibility Form, which you provided. You are requested to file an
amended form if there is any change in the information included on the form. In addition,
it would be helpful if you notified this office of the proposed starting date for this project.
Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Sincerely,
• sa..\cUmbotab %AA.%
W. Jason Guess
Erosion Control Officer
Enclosures: NPDES NCGO1 Fact Sheet
Cc:
R `air .
..W
46 Valley Street—Asheville, NC 28801
p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org