Loading...
HomeMy WebLinkAboutNCC242458_ESC Approval Submitted_20240814 (...--DriBE Cps. i*II �,t. Planning & Development Department William Jason Guess PEOPLE TO MATGHj Erosion Control Officer OUR MOUNTAINS NORTH CARO��NP LETTER OF APPROVAL May 20, 2024 NOTICE — This is not a permit KLP Pinners EAT, LLC Attention: Tony Kuechle 222 South Ninth Street, Suite 1600 Minneapolis, MN 55402 RE: Project Name: PINNERS COVE SUBDIVISION Acres Approved: 42.0 AC Project#: ER02022-00063 County: BUNCOMBE City: ASHEVILLE Address: PINNERS COVE ROAD River Basin: FRENCH BROAD Stream Classification: C Submitted By: TONY KUECHLE Plan Type: RESIDENTIAL Dear Sir/Madam, This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval.This approval shall become null and void if you have not made progress on the site within six months after the date of approval. A one-time six-month extension can be granted for good cause shown upon receiving a written request from you before the expiration of the approved plan. This letter of approval is being issued prior to the issuance of the stormwater permit due to concurrent reviews, but any land disturbing activity associated with this project shall not begin prior to issuance off all required permits including the stormwater permit and the land disturbing permit 0401 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org 1 , 1BE co::: I i II 4� Planning & Development Department William Jason Guess PEOPLE TO MATCUJ Erosion Control Officer OUR MOUNTAINS N°RTN CARO'.�'P "As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the NCG010000 Construction General Permit. After the form is reviewed and found to be complete,you will receive a link with payment instructions for the applicable annual permit fee. After the fee is processed, you will receive the COC via email. As the Financially Responsible Party shown on the FRO form submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing activity. The eNOl form and fee details may be accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this project changes in the future, the new responsible party must obtain a new COC.:" Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be kept on file at the job site: 1. The approved E&SC plan as well as any approved deviation. 2. The NCG01 permit and the COC, once it is received. 3. Records of inspections made during the previous 12 months. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to ensure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, it is determined that the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to ensure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. R 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org (...--DriBE Cps. i*II �,t. Planning & Development Department William Jason Guess iWiaETOMATGHI Erosion Control Officer OUR MOUNTAINS N°RTN cARoo'P' Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notified this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, • sa..\cUmbotab %AA.% W. Jason Guess Erosion Control Officer Enclosures: NPDES NCGO1 Fact Sheet Cc: R `air . ..W 46 Valley Street—Asheville, NC 28801 p. (828) 250.4830 f. (828) 250.6086 buncombecounty.org