Loading...
HomeMy WebLinkAboutNCC242432_Site Plan or Location Map_20240814 DATE ISSUED FOR REV io enter) a 11/15/2023 First Submittal Huntersville 1 aker 1.,a 02/16/2024 Second Submittal Hunteraville 2 Note:this review was carried out 1 LOT LIMITS OF DISTURBANCE CHART PARCEL ID GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH EQUIPMENT AND VEHICLE MAINTENANCE UNITE CLWCRETE based on the information THE NCGO1 CONSTRUCTION GENERAL PERMIT 1. Maintain vehicles and equipment to prevent offluids. Plan Sheet Is Part Of The mplementingthe details and spe fkatlonsonthisplansheatwllresultinthewnstmmon dischargecan Pa-&� provided by the design engineer. LOT# LIMITS OF DISTURBANCE(AC) activity being p g 2. Provide drip pans under any stored equipment ..- Overall Approval As Of Thegconsitlered compliant with the Ground Stabilization and Materials Handling 3, Identify leaks repair as soonasfeasible,or remove leaking equipment from the '-" 7 PP This review was done using the sections of the N0001 Construction General Permit(sections E and F,respectively).The :!"!^" I 1, I FollowingDate 6/6/2024 minimum acceptable standards of permittee shall comply with the Erosion and Sediment Control plan approved by the WA... _ :�. 266 0.14 1943127 4. Collect all spent fluids,store In separate containers and property dispose as � v T1 the applicable jurisdiction. delegated authority having jurisdiction.All details and specifications shown on this sheer hazardous waste)recycle when possible). •r 1 •, may not apply depending on site conditions and the delegated authority having jurisdiction. 5. Remov¢leakin hides and construction [from service until problem �' „• �^ r�•""��°• 267 0.16 1943128 leaking equipment pro � � G3._SW E C P 452 72 7 SECTION E:GROUND STABILIZATION has been fuels,lubricants, we F� ��� T �p y 6. Bring used fuels,lubricants,coolants,hydraulic fluids and other petroleum products 11=1. O lT " ,� Required Ground Stabilization Tlmeframes e a SG:`.,='^ I. 268 0.16 1943129 to a recycling or&silo.'center that handles these materials. aasaxk�eaavaa Stabilize within this Site area Description many calenear TImeframe variations rY1Y°-�6 [a"gi own ton"n'" 269 0.16 1943130 days after ceasing UTTER,BUILDING MATERIAL AND LAND CLEARING WASTE land disturbance 1. Never bury or bum waste.Place litter and debris In approved waste containers. 270 0.17 1943131 a) Perimeter ditch., None 2. Provide a sufficient number and size of waste containers(e.g dumpster,trash CONCRETEWASHO WASHOUTS wales,ditches,and 7 receptacle)on site to cantaln construction and domestic wastes. perimeter slopes 1. Do not discharge concrete or cement slurry from the site. 3. Locate waste containers at least SO feet away from storm drain Inlets and surface 2. Dispose of,or recycle settled,hardened concrete residue In accordance with local 271 0.17 1943132 rot High Quality Water waters unless no other alternatives are reasonably available. and state solid waste regulations and at an approved facility. (HOW)Zones ] None 4. Locate waste containers on areas that do not receive substantial amounts of runoff 3. Manage washout from mortar mixers in accordance with the above item and in from upland areas and does not drain directly to a storm drain,stream or wetland. addition I the mixer and associated materials on impervious barrier and within 272 7 1943133 h) Slopes steep.than If slopes er to or less m length and are pate cerviooa 3:1 ] not steeper than Z:1,34 days are 5. Cover waste containers at the end of each workday andam before storm events or lot perimeter silt fence. _ allowed provide secondary containment Repair or replace damaged west¢containers. 4. Install temporary concrete washouts per local requirements,where applicable.If an 273 0.17 1943134 -]days for slopes greater than 50'in 6. Anchor all lightweight items in waste containers during times of high winds. alternate method or product is to be used,contact your approval authority for length and with slopes steeper than 4:1 7. Empty waste containers as needed to prevent overflow.Clean up Immediately if and approval.If local standard details are not available,use one of the two 293 0.18 1943591days for perimeter i/key,swains, Dispose waste review of temporary concrete washouts provided on this detail. (di Slopes 3:1 to 4:1 14 ditches,perimeter slopes and HOW 5. Dispose waste off-rice at an approved disposal facility. 5. Do not me concrete washouts for dewatering or storing defective curb or sidewalk -'* 294 Zones 9. On business days,clean up and dispose of waste in designated waste containers. sections.Stormwater accumulated within the washout may not be pumped Into or 0.19 1943592 .10 days for Falls Lake Watershed discharged to the storm drain system or receiving surface waters.Liquid waste must �' ]days for perimeter dikes,swales, PAINT AND OTHER LIQUID WASTE be pumped out and removed from project 295 ditches,perimeter slopes and HOW Zones 1. Do not dump paint and other liquid waste into rtorm drains,streams or wetlands. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it a; 0.16 1943593 e) Areas veto slopesan be shown that no other alternatives are reasonably available.At a minimum, + r� , flatter than 4:1 14 thareahsfo zero Blake Watershed unless 2' L wmhouts 50eet awy fromstorm drain inlets and surface :�lip \ 300 0.24 1943582 p waters available. spills or overflowof storm drain inlet(s)cbses[to the washout which could receive spills overflow. \\ Note:After the permanent cessation of activities,any areas with temporary 3. Contain liquid wastes in a controlled area. 7. Locate washouts In an easily accessible area,on level ground and installe stone ground stabilization shall be converted to permanent ground stabilization as soon as 4. Containment must be labeled,sized and placed appropriately for the needs of site. entrance pad in front of the washout Additional controls may be required by the �1 301 0.2 1943583 practi able but n no g longer than 90 calendar days after the last land disturbing 5. Prevent he d scharge of soaps,solvents,detergents and other liquid wastes from approving authority. 811 \ 4.. activity Temporary groundsbbrizatonshallbemamtanedmamannerto render the constructonites B. Install at least oneslgndirectmgwncretetruckstothewashoMwthntheproject NONTNCyONOIllVL9 1 surface stable as .r accelerated erosion untll permanent ground stab r to s ach eved mks Pos[signage on the washout itIt to ltlenti y this iota[on. 6` _ 3O2 0.2 1943584 PORTABLE TOILETS gs pprowma y p ry a 00 GROUND STABIlI7ATI0N SPECIFICATION 9. Remove leaven from the washout when a[a [el 75°h ca ac [o llmk ��� Know.what's belOW. '^:O \ F 1. Install portable toilets on level ground,at least 50 feec away tram storm drains, verflow Brits.Replace er tarp,sand bags or other temporary structural Calla before•• Oudl �. \r.+ ev �\,-;'r' ` ®O Stabilize the ground suff'ciently so that rain wdl not dislodge the soli.Use one of the so-eamsorw¢tbeds�de4g thereano aberriat ve reazonabl table It so root e° N.a2 e-.. .one-cat i^, y g `' ?�>°�' 303 0.2 1943585 reis no al�of stableonably.ailabhf If 50 fo I components when no longer functonal.When utilizing alternative or proprietary techniques in the table below, :" \ '�� * ♦♦♦i♦♦ on et,snm attend surround provide portable pace products,follow manufacturer's ewang,instructions. > °♦°♦♦ Temporary SbbRegoa permanent sffixedwith on gravelpad and surroundwth sand bags.'� `♦♦♦♦,>♦♦♦♦ rasonry it 10.At the completion of the concrete work,remove remaining leavings and dispose of 4,\ °JJ♦°Ji 304 0,2 1943586 emporaryguss seed wveretlwth straw or •permarent grass uearovereewtn craw or 2. Provide staking or anchoring of portable toilets during periods of high winds or in high dds disposal Fill pit,ita applicable,and stabilizeen disturbance , ,N' • "`°♦°♦°♦>°° •otMr mulchesaM Makin. •other mulches and tackifiars foot traffic areas anapprove pose ry p ppy F-, , O♦�"0°°°°� caused by removal of washout. "` ,,a @ Allik., °J♦°°° •Hytlroueding GgOteatile wcn as permarent till 3 Monitor portable toilets for leaking and properlydspose of any leaked materiald O o ` , �.�ppy° 305 �•2 1943587 •Rolled erosion wmrol poducbwth or reinforcement matting Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace vnthout 111:'1:k • r, \ ••♦”.. A\ 306` 0.2 •Appropriately erpplled aary grass wor other mukh •Shrubs or• otherpermanent Plantings cosered ng with properly operating unit. T' ` ♦0�®°spy° 1943588HERBICIDES,PESTICIDES AND RODENTIODES ,� tip, ,', .0 ;..:., •Hesucsneela Shrubs mulch 1 Store and apply herbicides,pesticides and rotlentiadesrn accordance with label \yd °e°e°e°ea° •uniform am evenly di,o-mmee ground cover EARTHEN STOCKPILE MANAGEMENT restrictions. ply�, j +".' °°°°°°°°4 es•4 sufficient b restrain erosion 1. Show stockpile locations on plans Locate earthen material stockpile areas at least �;� °°°.t4m"'°°d; 307 0.19 1943589 • mwimetmmaud,a.rowwre,aaPnalepr 50 feet away from storm drain Inlets,sediment basins,perimeter sediment controls 2 Store herbicides,pesticides and rodentkidesin their original containers with the RC -1 x. { `e " ��♦°:°:° °°♦°e retaining watts label,which lists directions for use,ingredlen.and first aid steps In case of - �\\�\�,v«--. s t' e°°ee°°:•••••'� "nB w' and surface waters unless it to mown no other alternatives are reasonaby accidental poisoning • ♦♦♦ ° 3O8 0.19 1943590 •lollederosonro,maprodnarwithgrassseea available ��� ,F.I♦,,°3♦♦a�®®♦ 3 Dono[�oreherbcdes,pesCiddesandrod¢n[idd¢snareazwherefloodrngis !� psi ♦♦♦♦'�. 2 Protect stockple onto silt fence nstalled along ice of:P. ewrthatom mumoHse[ofble or wherethe yspi�.c ♦ 04> posy yma Ilorleak Iotawells,smrmwa[erdrains,groundwatr^: ` ♦♦♦�,e. POLYACRYIA NDES(PAINS)ANDFLOCCULANTSfive feet homthetoeof stockpile\ 311 0.23 1943566 orsurtacewater.ltasp'lloccurs,deanarea mmedately.`�`1*415 \ ♦♦�°° 1, Select flocculent that are appropriate for the solo beng exposed during3Providestablestoneaccess pointwhen fear ble4Donot stockple thesemeter als orstot '.- 4 . z construction,selecting from the NCOWR List ofApproved PAMS/FlocculI M 4 5tabil ze stockpile w thin the tmeframez provided ons sheet and m accordance> ,t�.\ •t- 312 0.24 1943567 2. ApplyflocculantsatorbeforetheInletstoEros''onandSedmentControlMeasures. withtheapprovedplanaridanyaddti0f a'requreme Solstablzation sdeFried R.Joe Harris&Associates,Inc. fie, °�-K•; • 3. Apply flocculants at the concentrations specified In the NC CWR List of Approved m Bntahve,phyzoalorchemcal corerag¢technquesthatwln restrain accelerated UFI -' >' 0.23 a pD„rYgrparm,p HAZARDDusANDTOKIcwASTE Engineering •Land Surveying• Planning 4' A PAMS Imculants and in accordance with the manufacturer's instructions. on disturbed rolls for tent Brit control needs. 4 6 313 19435ss Bing Cre to des grated hazardous waste collection areas on-site. ,.. 4. Promdeepondingareaforcontainmentoftreated5tormwaterbeforedscha 2 PH haxara�aswaafetanta,nerapntlertaerar,n secondary containment. I Management \.).1.:".:04-1,,,e.,(it,,,,ge."..,t,a ®p♦pA 0.23 oHslee fir ,NORTH CAROLINA 3. 0o notstordous wastecoe hazardous t chemicals,niter roomagged materials directly ground. °♦p♦�®� 314 1943569 5. Staeflocculantznleakproofcon ersthafarekeptunderstormresistantcover (I, NORTH °P6$1onPfrestB1vd a' ''`"1°8 p(8°'jainl'W 1`• •\ ♦�♦�♦��®�®�� or surrounded byzeton rycontainment . „timed asytmRprez. Te "g ♦. ♦♦.� 315 0.28 1943570 ♦., Z; NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING EFFECTIVE:04/01/19 "e +� `�°.p; ®4c, 316 0.21 1943571 www.rjoeharris.Com 4. ♦♦♦♦ y ♦♦♦� 317 0,21 1943572 Qj4 rice I• Qj°` 318 0,21 1943573 This drawing shall not be used for construction purposes until the ♦♦♦♦♦ Zk. ��IItt ',� �>�♦w4® seal and signature of the responsible registrant appears on the ♦♦4i44♦ ,tit- ♦°♦ ®® draw and proper permit forms and related fees are transmitted ° 8q �\ •J° cg°♦ 319 0,21 1943574 by the Owner Owner's Agent or Contractor to the Authority • 4 q.> a♦♦♦♦:� PART III PART III PART III having junstl cdon ♦�♦III°°° NNN>9 •• °♦°♦°♦°♦� 320 0.21 1943575 SELF-INSPECTION,RECORDKEEPING AND REPORTING SELF-INSPECTION,RECORDKEEPING AND REPORTING SELF-INSPECTION,RECORDKEEPING AND REPORTING ♦d• _ °6� •ti•�°J��k. Corporate Seal rlir r Engineers Seal lit r 0 ♦, ss sss a_o♦♦a 321 0.21 1943576 SErnONos SELF-INSPECTION SECTION B:RECORDKEEPING SECTION C:REPORTING • f;AA +r y f •-•��� Selfinspectionsare required during normal business hours in accordance with the table I.E&SC Plan Documentation 1.Occurrences that Must be Reported v'�N CARp' v Z\\ CARp'', below.When adverse weather or site conditions would cause the safety of the Inspection The approved EgSC plan as well as any approved deviation shall be kept on the site.The Permlttees shall report the following occurrences: ���10�°•ES S/°°!�'''. :>��0�°pF ESS/°(/','a .k,,e7 4,;;,,,,_ -= 322 0.25 personnel to be mteopardy,the inspection may be delayed tint the next busmen day on o .v e o. ;" 1943577 approved E&x plan maze be kept he E data throughoutsshall the coverage d available abl permit ai Visible sediment deposition in a stream or wetland. :e° 4, e ro° _ which it is safe m perform the inspection.In addition,when a storm event'(equal tom The following items pertaining m the E&$C plan shall be kept on site and available for I - Y 1!°• - ,. 1 .PrS _ greateredupo than 0 inch occurs outside of normal business hours,the self-Inspection shall be Inspection times Burin Ibazme::Hour:. ? SEAL S ? SEAL ze Er 4�i . 323 0.25 1943578 performed upon the commencement of the next business day.Any time when Inspections nspe during (b) Oil spills If: = `UU m • ',,° I were delayed shall be noted In the Inspection Recoro hem m boomer* Domrienmtlon Requirements Sin -416 :2; :` 0 3 421 .4;,4110 .*s'.„. a a d A • They are 25 gallons or more, -`p ,� °C7 5 2„>�e8 _• � ' 4 3t 324 0.33 1943579 n•,r.acr la1 Each EBSC measure has been installed Initial and date each EBSC measure on a copy • They are less than 25 gallons but cannot be cleaned up within 24 hours, %�„4,....,,,''yn&5. 'e s '.°cc " �i, Hy1 Map. imiewrmd n*.numb remnd.: and does not significantly deviate from the of the approved East plan or complete,dam '!! 1 4,, �d>�Phh ids^{1 iron hours) r«amm,dimensions and relative elev.ewna and sign an inspection report that urn can • Trey rouse sheen on surface waters(regardless of or ''%�R/S&AS'SC . y (B.G',, j� /�'^tin Total LOD 6.95 II)Rainms MIN µ oath'' shown on the appeal EA.plan EASc measure down on the approved EBSC • They are within 100 feet of surface waters(regardless of volume). ri,,,,i ` ,,,,,,,,,,00 SS�Onmaintain.la ils ram gauge observations are made durirq wee..or ir no°a pa. Plan.This documentatgn li required up°n the ""' i _ order makramun-able,record initial onstaleton or theneut measures.d use nice re a.see amemen is a u [hears[measures are modified after initial (c) Releases of hazardous substancesR excess of reportable quantities under Section 311 ,d// Beal.o m stint rnnllatwn. of th¢Oean Water AR(Ref:40 CFR 110.3 and 40 ffR 117.3)or Section 102 of CERCIA Project Manager Drawn 1 •a°'♦(,' - Ill- V; ...w The bytheP e" s� _ .h)Aphme of radio Has been competed Initial and date a copy of the apprwed MSC (R¢F.40CFR 3024)or G.5.143215.85. •6 / mit P k,meaN•kn may g g D.GATES A.SALAHALDAIN ot 'tem' Jr 1 'y ill t aannm measures as an nation plan sign ma I ��y` 'y� --- - -- ..sores nun elan day, 2. in xmnrc part to Indicate completion sin)the (d) Anticipated bypasses and unanticipatedbypasses. Department Manager Checked y iBi,mL of wmtmR on phau pa rk �11` A� .- Atit o�ata ai wrNnn rw,e m.,,•,•.a,a..oper,nit Icl Ground wvernk,ratea and Installed Initial and date awpy of the approved Esse B.PRIDEMORE D.GATES 'con t noun el I mens>L s w In sign an Inspection (e) Noncompliance with the contlklons of this permit that may endanger health or the Print/Plot Date .. _ accordance__ `, tr•30• �... - InPormwator u e 7 .:am Mena Melange correctly. idea. pro reportde d cover ove otKirotoar.with ns approve environment. 024 'r a •::\ Ili -s; i 1 iss aunaar,^(OM) en nal4 sonepeeuinrmrirs..pec,u., idlnT.maintenance and repair Complete,date and son an inspect.report. 2.Reporting Tlmeframes and Other Requirements Asbuiuilt Drawruary n Asbuilt Date oe,mpaan Bate s disch 2 Data ancl term _ ge ytN,' mm16e1 Mk sonormwdser oraoterene o,i requirements for al BAC measures AherapermltCee becomes aware of an occurrence that murt be reported,he shall contact 2 *It- ( ffe�. \ awspmeeenamorwud4n such ea have been performed Bane - '. +�>� - ty ehurs,ON e�vlaptne ete. the appropriate Division regional office within the timeframes and In accordance with the i lei Corrative actions have been taken Initial date of the approved EBSC other requirements listed beow.O[[urren[ez outside normal business hods may I be ii1 � e F,"i e quiremen a y also,; „�� Client ♦°Viva�. - H"1- ..r. I°� �)yiS4 „ ial.wimww or calendar wunckmymn,men„ to BAC measures plan or complete,date a.sign an Inspectionreported genes center ♦ '11, 1 . ,e awe pro corrective n. 858-0368to the Department'sE Environmental personnel at l800) m run ! - �'i __��� " Otd•�� end wknwt 24 nib be m.,eebwn.t has left report to completion o s,x,mmnn edeeaca.ne ins nduaar.,me�amn,1s,ae y of following he nude tin rake[.the anmm taken clean 1s nwnt2101a Taylor Morrison Of Carolinas INC '" ( _ -- !'1 Cl lOy a. rime>zoktmk : dpuennvieman...Bete of tor..vnaction.ta car 2.Additional Documentation to be Kept on Site occurrence RePgrni.nn,afr, IAk rD 1 and Other Requirements ♦♦ d {tie , ! � t a I�i. NA d tl��,�fd ` 2a hours 3 le eapnneien n la mearnws[alien m coma fume In In addition to the E&SC plan documents above,the following items shall be kept on the lei Visible sediment • HVMn14haurs nsralor Sct i0 11405 N COMMUNITY HOUSE RD STE 150 ♦♦s♦♦ +ill, _ tit �y)�P s�' a site and available for msPectors a[all times during normal business hours,unless the deposition o • lwWn sMeMorrMs,a rePon Mat coma ns a deur or'on or me ♦♦� _ '� __ �d ` ie,P.e,m,mke Increased visible Division des a site-specific based on site stream a�da. anaxtnnaanenroaeatea,then,n,eamedepo,tren. CHARLOTTE,NC,28277 ♦ '1! ail � 11 it i1t P,1 / roy,dw'ro„�L, trn" prov gues :tan he regrirrnmam m.awrmen re .•4 '�, j !!u ! d oro,dt t�tl misregmrementriotpraRital: can m waive[ pert on' P:704-251-8137 4� 404 .. �f- I die tea v ���., fit- 1` 11 (II _ ° --Y are,s niml and (a) This General Perini[as well as the CertHlcate of Coverage,after d is received, an me NC 3g31dl list as mpairM for udment- -� ♦i' !�11 R[+{i t�ii _ da b ^�r�� •(�IPIa�x ow a sin x der berems to eentcmamimnal ♦� •4sl� c 'tG__ t , _ ,, mnoenuw npnas. nsl aiiam�orpmmni.+zasc s )b) Records of nspections made dudng Che previous twely months.The permittee shall monitor ne�mperskns or applYrwre strMgmt pramrcsuuan _ -. z m,on cat. ir ♦ �s 1 --c1- '° a ro muxamn er ne.m determine that additona requiremenn are wed.to assure compliance °i�Aj 'e�"�'>Qj���N '' measu.es aian knaamtakna record the requged observe[ons onto.lnspecton Record Foim prov pled bythe Project: y00♦� 4�♦°1��{N F 1 ♦ m na r.evesrpmec permanent Dvision or a similar lnspectlonform that Includes all the required elements Use of _ wkn meI.en or uae unpaa.waemm�a ♦ ° �p •V pit �1 -1 ) 44 wean in Ibid.spins and • H91Mn NI hours.an nra oreectronk noirficahon.The notrficaton �4��♦.®4♦4I�♦if = ♦a� ( .. electron rally-available records in lieu of the required paper will be allowed release of shall intl....mation MOM the date,time mture,voume aria r•®�---•,: ,���e; . ''�.�♦� provided measureshawisemnaWntoproydeegaalattesaridarlyazthenard-tapyratad,. raea,deus lcationofthespilltrreease ILEC Walden Phase 8 Map o44 I�♦ay`.. S:et ♦04.®° .' LOTS NOT PERMITTED WITH THIS PLAN SET bk assurance Matt.,veld 3,DocumentationtobeRetainedforThreeYears subn,ree•per ltan O•R®♦4♦ad♦4♦4p4444444t�♦p4♦, ♦44� ""'n All data used to complete me e-Nol and all ins 116Hu above 1 ♦�1i4. ::Qb°>4:44'n�°i.N, 4h 44 n�as es. a inspection records shall be maintained for a period Icl Medpatea a Arapprtm kart ten day before roe dole gldra MM.,tloesaIAA ♦♦3♦♦♦ed♦♦♦♦♦♦♦e♦♦♦G♦♦♦♦4P♦iv4(a♦♦ NOTE:The lain inspection resen the required 7 calendar day inspection requirement. of three years after project completion and made available upon request.140 CFR 122.411 ♦ssem.♦♦e�♦♦♦♦P♦♦t.♦♦♦♦ bypasses fa0m4101001l The report snail intrude an evaluation of the anticipated quality and ♦♦e♦♦•♦�♦♦♦ PART II,SECTION G,ITEM(4) I lU anurieatad • fmrnin24 hours.an oral orerectronrc notification. DRAW DOWN OF SEDIMENT BASINS FOR MAINTENANCE OR CLOSE OUT bypasses too cf. • s rams 7 cote Mm daps,a report Mat includes an evaluation of Me 177.41mi(311 quality and effect of me bypass. Drawing LOTS NOT PERMITTED WITH THIS PLAN SET le)Noncompliance • Wddnl.wn,Aan,ralorelectronicnmdkation' Sediment basins and traps that receive runoff from drainage areas of one acre or more shall use outlet structures that withdraw water from the surface when these devices need Co be drawn down w,M Mewedkbns • Within 7M.*days,areport Mat contains a description of the for maintenance or close out unless this Is Infeasible.The circumstances In which It Is not following to withdraw water from the surface shall be rare(for example,times with extended cold weather). damn permit that omptware,and as move Me period of noncompliance. OVERALL Non-surface withdrawals from sediment basins shall be allowed only when all of the following criteria have been met: may endanger been nog exact darn and times,and if theeonconce expected hat not health.. been corrected,the enticing...me noncompliance is expected to Ia) The E&SC plan authority has been provided with documentation of the non-surface withdrawal and the specific time periods or conditions in which it will occur.The non-surface withdrawal 'nvkonrnentiao continue:and stops liken or planned to reduce,eliminate.and cfR Izz.410XT)l Prevent staff of tm noncompliance.lag CFR me410Kaj. shall not commence until the E&SC plan authority has approved these items, a P.M.stall may waive the requirement for a carmen repart on a lb) The non-surface withdrawal has been reported as an anticipated bypass in accordance with Part III,Section C,Item(2)(c)and(d)of this permit, case-bysme rase. Ic) Dewatering discharges are treated with controls to minimize discharges of pollutants from stormwater that is removed from the sediment basin.Examples of appropriate controls include properly sited,designed and maintained dewatering tanks,weir tanks,and filtration systems, GRAPHIC SCALE Id) Vegetated,upland areas of the sites or a properly designed stone pad is used to the extent feasible at the outlet of the dewatering treatment devices described In Item(c)above, 't (e) Velocity dissipation devices such as check dams,sediment traps,and riprap are provided at the discharge points of all dewatenng devices,and ( If�NORTH CAROLINA is aop not Sediment Ig SedimenemovedfromthedewatedngtreatmentdevicesdescribedinItem(t)aboveisdisposedofinamannerthatdoesnotcaaredepositionofsedimentintowatersoftheUnitedStates. i�+ Environmental Quality NCGO1 SELF-INSPECTION,RECORDKEEPING AND REPORTING EFFECTIVE:04/01/19 Project No. Drawing N ( IN FEET) 5692 1 inch= 150 ft. DWG Flle Name: 5692-ILEC PH 8 C 1 .01