Loading...
HomeMy WebLinkAboutTurbidity Monitoring Report 20240813 - August 2024_Week 4_Turbidity Monitoring DataEnd of July / First week of August 2024 Permit Standard Turbidity: Downstream ā€” Turbidity: Cashiers Lake ā€” Turbidity: Frank Allen Road ā€” - Rainfall D Z 40 L Iā€” M M (B 20 aD M 28 29 30 31 01 02 03 End of July / Start of August 2024 (day) Note: Permit standard is measured turbidity of Frank Allen Road site + 10 NTUs; rainfall and turbidity data represents daily mean m 15000 v v v 10000 Z C 5000 C M IsEnviroScience"" Excellence In Any Environment