HomeMy WebLinkAboutNCC216829_MODIFICATION Supporting Doc (ADDL LOTS)_20240806 ST'TF cr
ROY COOPER
Governor
ELIZABETH S.BISER
Secretary ^"
WILLIAM E.TOBY VINSON,JR NORTH CAROLINA
Interim Director Environmental Quality
07-30-2024
LETTER OF APPROVAL
D.R. Horton, INC.
2000 Aerial Center Parkway Suite 110
Morrisville, NC 27S60
RE: Project Name: Baker Subdivision - Phase 1A (Lots 130-137)
Permit Number: FRANK-202S-012S
Acres Approved: 7.68
County: Franklin
City: Youngsville
Address: Granite Falls Way
River Basin: Neuse
Stream Classification: C: Aquatic Life, Secondary Contact Recreation, Fresh water
Submitted By: Tracey Davis
Plan Type: New Plan
Dear D.R. Horton, INC.,
This office has reviewed the subject erosion and sedimentation control plan. We hereby issue this
Letter of Approval. Any modifications required for approval are listed in the body of the email that
accompanied this attached letter. The enclosed Certificate of Approval must be posted at the job
site. This plan approval shall expire three (3) years following the date of approval, if no land-
disturbing activity has been undertaken, as is required by Title 1SA NCAC 413 .0129.
As of April 1, 2019, all new construction activities not explicitly exempt are required to complete
and submit an electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC)
under the NCGO10000 Construction General Permit. After the form is reviewed and found to be
complete, you will receive a link with payment instructions for the annual permit fee. After the fee
is processed,you will receive the COC. As the Financially Responsible Party shown on the FRO form
submitted for this project,you MUST obtain the COC prior to commencement of any land disturbing
activity. The eNOI form may be accessed at deq.nc.gov/NCG01.
North Carolina Department of Environmental Quality Division of Energy,Mineral and Land Resources
512 North Salisbury Street 11612 Mail Service Center I Raleigh,North Carolina 27699-1612
N40RNf1RT-CA.FJI NA
DaP.m t m QU. 919,707,9200
Letter of Approval
D.R. Horton, INC.
07-30-2024
Page 2 of 2
Please direct questions about the eNOI form to the Stormwater Program staff in the Raleigh central
office. If the owner/operator of this project changes in the future, the new responsible party must
obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to
ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,requiring protection
of existing natural resources and adjoining properties. If, following the commencement of this
project, the erosion and sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66),
this office may require revisions to the plan and implementation of the revisions to ensure
compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land-disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form and on the plan, which you provided. You are requested to file an
amended form if there is any change in the information included on the form.
Your cooperation is appreciated.
Sincerely,
�_e7
Land Quality Section
CERTIFICATE OF PLAN APPROVAL
STATE�,�
Qv - rfi
a�
,J •�< f h0
��pq,'Rll.11.17'ib 'mil
"`QUAM
The posting of this certificate certifies that an erosion and sedimentation control plan has been
approved for this project by the North Carolina Department of Environmental Quality in
accordance with North Carolina General Statute 113A — 57 (4) and 113A — 54 (d) (4) and North
Carolina Administrative Code, Title 15A, Chapter 4B.0107 (c). This certificate must be posted
at the primary entrance of the job site before construction begins and until establishment of
permanent groundcover as required by North Carolina Administrative Code, Title 15A,
Chapter 4B.0127 (b).
FRANK-2025-125: Baker Subdivision - Phase 1A (Lots 130-137)
7/30/2024 ///// # 199WAW 41,, PE
Date of Plan Approval E Q Regional Engineer
mow.--:::• -,.,.,... d...-�+�
Certificate of Coverage Number: