March 1, 2024
LETTER OF APPROVAL
DRB Group North Carolina, LLC
Attn: Jay Colvin
227 W Trade St, Ste 400
Charlotte,NC 28202
RE:
Project Name: Watkins Glen
Permit ID: LDDP-2024-00080
Denuded Acreage: 6.8
County: Mecklenburg
Submitted By: Matt Kearns
Dear Mr. Colvin:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable and hereby issue this Letter of Approval. This plan approval shall expire three (3)
years following the date of approval, if no preconstruction meeting and land-disturbing activity
has been undertaken, as is required by Title 15A NCAC 4B .0129 and Section 17-35(b) of the City of
Charlotte Code of Ordinances. Acceptance and approval of this plan is also conditioned upon your
compliance with Federal, State, and local water quality laws,regulations, and rules.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under
NCG01000 Construction Stormwater General Permit. This form MUST be submitted
prior to the commencement of any land disturbing activity on the above-named project. After the
form is reviewed and found to be complete, you will receive the COC via email. As the Financially
Responsible Party shown on the FRO form submitted for this project, you must obtain the COC prior to
commencement of any land disturbing activity. The eNOI form and fee details may be accessed at
deq.nc.gov/NCG01. Please direct questions about the NOI form to the Stormwater Program staff in
the Raleigh Central Office. If the owner/operator of this project changes in the future, the new
responsible party must obtain a new COC.
Watkins Glen
March 1,2024
Page 2 of 2
Upon receiving this approval, it is the responsibility of the Financially Responsible Party, their agent, or
the owner to request a pre-construction meeting by completing the Pre-Construction Meeting Request Form
found at https://charlottenc.seamlessdocs.com/f/tr9c8a2tysur. Please provide at least 48 hours advance
notice for the pre-construction meeting so that City Staff may coordinate and schedule the appropriate
personnel. No land disturbance of any kind,including demolition, is allowed prior to the pre-construction
meeting
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation be kept on
file at the job site:
1. The approved E&SC plan as well as any approved deviation
2. The NCG01 permit and the COC, once it is received
3. Records of inspections made during the previous 30 days.
Also,this letter gives the notice required by G.S. 113A-61.1(a)of our right of periodic inspection to ensure
compliance with the approved plan.
The City of Charlotte's Sedimentation Pollution Control Program is performance-oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement of this
project, it is determined that the erosion and sedimentation control plan is inadequate to meet the
requirements of the City of Charlotte Code of Ordinances and the Sedimentation Pollution Control Act of
1973 (G.S. 113A-51 through 66), this office may require revisions to the plan and implementation of the
revisions to ensure compliance with the Act and Local Code.
Acceptance and approval of this plan is conditioned upon your compliance with Federal, State,and County
water quality laws,regulations, and rules. This approval does not supersede any other permit or approval.
Approval of this plan is based in part on the accuracy of the information provided in the Financial
Responsibility Form,which you provided. You are requested to file an amended form if there is any change
in the information included on the form.
Your cooperation is appreciated.
Sincerely,
j,....,0,4„
James Wilson,CPESC
Charlotte Land Development Program