Loading...
HomeMy WebLinkAboutNCG030535_Cover Letter and Inspection Report_20240812 4 ROY COOPERkn Governor ELIZABETH S.BISER Secretary WILLIAM E. TOBY VINSON,JR NORTH CARCOLINA Interim Director EnvimAmentalQuality August 12, 2024 Zf Chassis Components, LLC Attention: George Roesner 1570 E P St Extension Newton,North Carolina 28658 Subject: Stormwater Inspection Report NPDES Stormwater Permit Number or Certificate of Coverage Number NCG030535 Catawba County, North Carolina Dear Mr. Roesner: Enclosed please find a copy of the Compliance Inspection Report for the inspection conducted at the Zf Chassis Components facility located at 1570 E P St Extension on July 22, 2024. The report should be self- explanatory, however, should you have any questions concerning these reports, please do not hesitate to contact Kathryn Peterson at (704) 235-2100 or by email at Katlirn.Peterson(ddeq.nc.gov. Sincerely, A ll sr Kathryn Peterson Assistant Regional Engineer Land Quality Section KP Enclosure: Inspection Report cc: Stormwater Laserfiche, Certificate of Coverage NCG030535 MRO-Land Quality Section, Stormwater Files William Edens, Senior EHS Manager, 1570 E P St Extension,Newton,North Carolina 28658 North Carolina Department of Environmental Quality i Division of Energy,Mineral,and Land Resources Mooresville Regional Office 610 East Center Avenue,Suite 301 1 Mooresville,North Carolina 28115 704-235-2100 Compliance Inspection Report Permit:NCG030535 Effective: 07/01/21 Expiration: 06/30/26 Owner: Zf Chassis Components LLC SOC: Effective: Expiration: Facility: Z.F. Chassis Components, LLC County: Catawba 1570 E P St Ext Region: Mooresville Newton NC 28658 Contact Person:William Edens Title: EHS Specialist Phone: 828-468-3340 Directions to Facility: System Classifications: SWNC. Primary ORC: Certification: Phone: Secondary ORC(s): On-Site Representative(s): Related Permits: Inspection Date: 07/22/2024 Entry Time 12:45PM Exit Time: 02:15PM Primary Inspector:Kathryn S Peterson Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Metal Fabrication Stormwater Discharge COC Facility Status: E Compliant Not Compliant Question Areas: Storm Water (See attachment summary) Page 1 of 3 Permit: NCG030535 Owner-Facility:Zf Chassis Components LLC Inspection Date: 07/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Inspection Summary: Kathryn Peterson and Mike Maclntyre inspected Zf Chassis Components on July 22, 2024. The facility was found to be compliant. The following are areas of improvemnt that the facility should take note of to fix: - Ensure the SWPPP is reviewed annually. Document these reviews within the SWPPP. - Ensure to specify if there was not a significant rainfall event in a sampling quarter as"no flow" Page 2 of 3 Permit: NCG030535 Owner-Facility:Zf Chassis Components LLC Inspection Date: 07/22/2024 Inspection Type:Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ #Does the Plan include a General Location(USGS)map? 0 ❑ ❑ ❑ #Does the Plan include a"Narrative Description of Practices"? 0 ❑ ❑ ❑ #Does the Plan include a detailed site map including outfall locations and drainage areas? 0 ❑ ❑ ❑ #Does the Plan include a list of significant spills occurring during the past 3 years? N ❑ ❑ ❑ #Has the facility evaluated feasible alternatives to current practices? 0 ❑ ❑ ❑ #Does the facility provide all necessary secondary containment? 0 ❑ ❑ ❑ #Does the Plan include a BMP summary? ❑ ❑ ❑ #Does the Plan include a Spill Prevention and Response Plan (SPRP)? 0 ❑ ❑ ❑ #Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? 0 ❑ ❑ ❑ #Does the facility provide and document Employee Training? 0 ❑ ❑ ❑ #Does the Plan include a list of Responsible Party(s)? 0 ❑ ❑ ❑ #Is the Plan reviewed and updated annually? ❑ N ❑ ❑ #Does the Plan include a Stormwater Facility Inspection Program? N ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? 0 ❑ ❑ ❑ Comment: Ensure the SWPPP is reviewed annually for correctness. Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring? E ❑ ❑ ❑ Comment: Analytical Monitoring Yes No NA NE Has the facility conducted its Analytical monitoring? 0 ❑ ❑ ❑ #Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ N ❑ Comment: Permit and Outfalls Yes No NA NE #Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ #Were all outfalls observed during the inspection? 0 ❑ ❑ ❑ #If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ E ❑ #Has the facility evaluated all illicit(non stormwater)discharges? 0 ❑ ❑ ❑ Comment: Page 3 of 3