Loading...
HomeMy WebLinkAbout740095_30-Day Plan of Action_20240812a, 1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES THIRTY (30) DAY DRAW DOWN PERIOD RECEIVED/;�� I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE AUG 12 2024 1. Structure Name/Identifier (ID): i°Dater Quality Regional Operations Section 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freebohington Regional office a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c x line d x 7.48 gallons = 12 ft3 3. Projected volume of waste liquid -produced during draw down period 17 inches l '? inches A, inches os�ft2 F9 / gallons f. temporary storage period according to structural design 1 �'4 days g. volume of waste produced according to structural design �{�� ft3 h. actual waste produced = current herd # x line g = D ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design k. (lines h + i +i) x 7.48 x 30 days = line f 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. (lines e + k) x line I = 1000 7..f man' ft3 7 Y "gallons J `h Ib/1000 gal. lb PAN mil/ REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY PoA (30 Day) 2121/00 1 1. structure ID: line m = 7 lb PAN 41 46 2. structure ID: line m = lb PAN 3. structure ID: line m = lb PAN 4. structure ID: line m = lb PAN 5. structure ID: line m = lb PAN 6. structure ID: line m = lb PAN n. lines 1 +2+3+4+5+6 = 117 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CAN NOT BF APPLIES nuRING THIS nn nAY PFRInn_ o. tract ,� f to l p. field # q. crop r. acres s. remaining IRR-2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' D b ! Soak 3 8 �3 yo r- 1 U 7 7 1 G f S� 3 9 3! x .��, a 6 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day drawn down period v. Total PAN available for all fields (sum of column t) _ 4'%9 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = i f "] lb. PAN PoA (30 Day) 2/21/00 2 r x. Crop's remaining PAN balance (line v from section III) lb. PAN y. Overall PAN balance (w - x) _ lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21/00 3