HomeMy WebLinkAbout740095_30-Day Plan of Action_20240812a,
1 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
THIRTY (30) DAY DRAW DOWN PERIOD
RECEIVED/;��
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
AUG 12 2024
1. Structure Name/Identifier (ID):
i°Dater Quality
Regional Operations Section
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freebohington Regional office
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c x line d x 7.48 gallons
=
12 ft3
3. Projected volume of waste liquid -produced during draw down period
17 inches
l '? inches
A, inches
os�ft2
F9 / gallons
f. temporary storage period according to structural design 1 �'4 days
g. volume of waste produced according to structural design �{�� ft3
h. actual waste produced = current herd # x line g = D ft3
certified herd #
i. volume of wash water according to structural design ft3
j. excess rainfall over evaporation according to design
k. (lines h + i +i) x 7.48 x 30 days =
line f
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. (lines e + k) x line I =
1000
7..f man' ft3
7 Y "gallons
J
`h Ib/1000 gal.
lb PAN mil/
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
PoA (30 Day) 2121/00 1
1.
structure ID:
line m = 7 lb PAN
41
46
2.
structure ID:
line m = lb PAN
3.
structure ID:
line m = lb PAN
4.
structure ID:
line m = lb PAN
5.
structure ID:
line m = lb PAN
6.
structure ID:
line m = lb PAN
n.
lines 1 +2+3+4+5+6 =
117 lb PAN
III. TOTAL
PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAYDRAW DOWN
PERIOD.
DO NOT LIST FIELDS TO WHICH PAN CAN
NOT BF APPLIES nuRING THIS nn nAY PFRInn_
o. tract ,�
f to
l
p. field #
q. crop
r. acres
s. remaining
IRR-2 PAN
balance
(lb/acre)
t. TOTAL PAN
BALANCE
FOR FIELD
(Ibs.)
column r x s
u.
application
window'
D b
!
Soak
3 8
�3
yo
r-
1
U 7
7
1
G
f
S�
3
9
3!
x
.��,
a
6
'State current crop ending application date or next crop application beginning date for available receiving crops
during 30 day drawn down period
v. Total PAN available for all fields (sum of column t) _ 4'%9 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = i f "] lb. PAN
PoA (30 Day) 2/21/00 2
r
x. Crop's remaining PAN balance (line v from section III) lb. PAN
y. Overall PAN balance (w - x) _ lb. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here
including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd
reduction options, recalculate new PAN based on new information. If new fields are to be
included as an option for lowering lagoon level, add these fields to the PAN balance table and
recalculate the overall PAN balance. If animal waste is to be hauled to another permitted
facility provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
PoA (30 Day) 2/21/00 3