Loading...
HomeMy WebLinkAboutWQ0021934_Monitoring - 06-2024_20240731Monitoring Report Submittal .................................................. Permit Number#* WQ0021934 Name of Facility:* Hasentree Month:* June Report Information Type * Revised - NDMR, NDAR-1, NDAR-2, NDMLR Revised - NDMR, NDAR-1, NDAR-2, NDMLR Year:* 2024 Upload Document* Hasentree NDAR WQ0021934 June 2024.pdf 245.31 KB PDF Only Hasentree WQ0021934 NDMR June 2024.pdf 103.84KB PDF Only Please upload one PDF containing all applicable monitoring reports (i.e., NDMR, NDAR-1, NDAR-2, NDMLR, GW-59). Confirmation Email Address: * mdgoodson@aquaamerica.com Name of Submitter: * Miranda Goodson Signature: Date of submittal: 7/31/2024 This will be filled in automatically Initial Review Reviewer: Wanda.Gerald Is the project number correct?* WQ0021934 Is the monitoring report accepted?* Yes No Regional Office* Raleigh Reviewer: Review Date: FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page i of Permit No.. 66Z Facility Name: Hasentree Golf Community County: Wake Month: .tune Year: 2024 Did irrigation occur at this facility? YES NO 89 Field Name: Front 9 Greens Field Name: Back 9 Greens Field Name: Front 9 Frwys Field Name: Back 9 Frwys Area (acres): 1.9 Area (acres): 1.9 Area (acres): 68.4 Area (acres): 59.6 Cover Crop:Cover Crop: p' Cover Crop: p' Cover Crop: p: Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Weather Freeboard Field Irrigated? E) YES ❑ No Field Irrigated? E/] YES ❑ NO Field Irrigated? E] YES ❑ No Field Irrigated? YES NO m p c U 3 3 E m 2 s a m `o N d 2 am �.� a C LO 0� E- 3La} > H m.. E ~ m a.c mm j E w c E3a to = J m E.m y0 CL Q m m;! Em ~ •�:. m y c E-0 J E rn �?`E 9 b = J m ro E m 7p i Q m 6 F tM , ;� n J E M a c E=V = J m y E a1 3a 0 CL Q o E� ~ •� M m'D O J E rn E a = O J OF in ft ft gal min in In gal min in in gal min In in gal min in in 1 C 84 14 5,451 230 0.11 0.03 9,835 415 0.19 0.03 2 CL 84 14 5,569 235 OA 1 0.03 5,569 235 0.11 0.03 3 CL 89 14 9,243 390 0.18 0.03 11,139 470 0.22 0.03 133,610 4310 0.07 0.00 160,394 5174 0.10 0.00 4 C 93 14 5 CL 88 14 6 R 91 1 14 7 PC 89 14 8 CL 88 14 9 C 91 14 101 CL 1 86 14 111 C 1 84 14 12 CL 87 14 13 CL 90 14 14 C 94 14 15 C 93 14 16 C 90 14 171 CL 1 92 14 18 PC 92 14 4,408 186 0.09 0.03 4,503 190 0.09 0.03 179,087 5777 0.10 0.00 209,622 6762 0.13 0.00 19 C 91 14 2.654 112 0.05 0.03 2,915 123 0.06 0.03 163,804 5284 0.09 0.00 211,575 6825 0.13 0.00 20 C 91 14 179,676 5796 0.10 0.00 211,265 6815 0.13 0.00 21 CL 96 14 5,000 211 0.10 0.03 4,394 185 0.08 0.03 179,924 5804 0.10 0.00 1 211,141 1 6811 0.13 0.00 22 C 98 14 5,000 211 0.10 0.03 4,977 210 0.10 0.03 205,096 6616 0.11 0.00 225,711 7281 0.14 0.00 231 C 1 100 14 205,096 6616 0.11 0.00 225,184 7264 0.14 0.00 241 PC 1 97 14 1 204,445 6595 0.11 0.00 225,060 7260 0.14 0.00 251 C 1 98 14 14,765 623 0.29 0.03 15,025 634 0.29 0.03 15,717 507 0.01 0.00 32,643 1053 0.02 0.00 261 PC 1 103 14 204,848 6608 0.11 0.00 225,370 7270 0.14 0.00 271 PC 1 88 1 14 28 CL 97 1 14 203,918 6578 0.11 0.00 224,905 7255 0.14 0.00 29 C 101 14 12,134 512 0.24 0.03 14,717 621 0.29 0.03 166,904 5384 0.09 0.00 191,208 6168 0.12 0.00 30 C 100 14 9,882 417 0.19 0.03 9,930 419 0.19 0.03 228,160 7360 0.12 0.00 255,533 8243 0.16 0.00 31 CL 14 MonthlyLoading: 74,106 1.44 82,994 1.61 2,270,285 1.22 2,609,611 1.61 12 Month Floating Total (in): 10.87 12.05 1 5.93 FORM: NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page 2__ 01 9 Permit No.: W00021934 Facility Name: Hasentree Golf Community County: Wake Month: June Year: 2024 Did irrigation occur at this facility? Field Name: Practice Area Field Name: Practice Greens Field Name: DR Tee Field Name: DR Frwy Area (acres): 2.3 Area (acres): 0.7 Area (acres): 4.2 Area (acres): 6.8 Cover Crop:Cover Crop: p: Cover Crop: p' Cover Crop - p: ❑ Yes ❑ NO Hourly Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Hourly Rate (in): 0.1 Annual Rate (In): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Annual Rate (in): 20.28 Weather Freeboard Field Irrigated? YES ❑ No Field Irrigated? ❑ YES ❑ NO Field Irrigated? Yes ❑ NO Field Irrigated? ❑ YES ❑ NO n m o U 3 d c :FL` ` CL "° o i 3 2 a Ln E m _ t ° E � = m� CL > ° ; ~a�0 a e , a ` � 3 > - E m ° c EaR 3 o > c ME o>Q E a� > ca Em =o Cd° 1 °F in R h gal min In in gal min in in al min in In gal min in in 1 C 84 14 1,706 72 0.09 0.07 2 CL 84 14 1,706 72 0.09 0.07 3 CL 89 14 3,792 160 0.20 0.07 4 C 93 14 5 CL 88 14 6 R 91 1 14 7 PC 89 14 8 CL 88 14 9 C 91 14 10 CL 86 14 11 C 84 14 12 CL 87 14 13 CL[94 14 14 C 14 15 C 14 16 C 14 17 CL 14 18 PC 14 1,896 80 0.10 0.07 11,129 359 0.10 0.02 19 C 14 2,015 65 0.03 0.03 1,137 48 0.06 0.06 1,129 359 0.01 0.00 20 C 14 2,015 65 0.03 0.03 11,036 356 0.10 0.02 21 CL 14 2,015 65 0.03 0.03 1,896 80 0.10 0.07 11,036 356 0.10 0.02 22 C 98 14 1,540 65 0.02 0.02 1,896 80 0.10 0.07 11,036 356 0.10 0.02 23 C 100 1 14 2,015 65 0.03 0.03 11,036 356 0.10 0.02 24 PC 97 14 2,015 65 0.03 0.03 11,036 356 0.58 0.10 25 C 98 14 26 PC 103 14 5,323 225 0.28 0.07 11,036 356 0.10 0.02 27 PC 88 14 2,015 65, 0.03 0.03 11,OW 356 0.10 0.02 28 CL 97 14 2,015 65 0.03 0.03 11,036 356 0.10 0.02 29 C 101 14 3,720 120 0.06 0.03 3,792 160 0.20 0.07 30 C 100 14 3,255 1 105 0.05 0.03 3,792 160 0.20 0.07 4,960 396 0.04 0.01 31 CL 14 Monthly Loading: 22,620 0.36 37,972 2.00 94,470 0.83 0 0.00 12 Month Floating Total (in). 13.02 3.37 1 4.28 FORM NDAR-1 08-11 NON -DISCHARGE APPLICATION REPORT (NDAR-1) Page —3— of Did the application rates exceed the limits in Attachment B of your permit? Were adequate measures taken to prevent effluent ponding in or runoff from the sites? Was a suitable vegetative cover maintained on all sites as specified in your permit? Were all setbacks listed in your permit maintained for every application to each permitted site? Were all freeboards maintained in accordance with the specified freeboard heights in your permit? Compliant ❑ Non -Compliant ❑' Compliant ❑ Non -Compliant Q Compliant ❑ Non -Compliant Q Compliant ❑ Non -Compliant ❑� Compliant ❑ Nor Compliant If the facility is non -compliant, please explain in the space below the reason(s) the facility was not in compliance. Provide in your explanation the date(s) of the non-compliance and describe the corrective action(s) taken. Attach additional sheets if necessary. Operator in Responsible Charge (ORC) Certification Permittee Certification ORC: Seth Hol and Permittee: lvot Ncrw Camhns Certification No.: 1004679 Signing Official: fA 1 j rn, ) 5 i „_ , r_ s0r" Grade: Phone Number: Signing Official's Title: T i r(� S�r&(-V i S or Has the ORC changed since the previous NDAR-1? Yes 0 No Phone Number: CG G`, 27Gj_ 1 S 72 Permit Exp.: f� 11 Dale Signatre Uate ,/ ey th,$ signature, colt'is accurrate and complete to the best of my knowledge I certify under penalty d law, that this documenivand all attachments were prepared under my drectlon or supervision in accordance with a syslem designed to assure that all qualified persormel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the irormation, the information submitted is, to the best of my knowledge and belief, true, accurate. and complete I am aware that there are significant penalties for submilting false information, inchAng the possibility of fines and Imprismment for knowing violations Mail Original and Two Copies to: Division of Water Quality Information Processing Unit 1617 Mail Service Center Raleigh, North Carolina 27699-1617 HASENTREE GOLF COMMUNITY SPRAY IRRIGATION FIELDS 12 MONTH ROLLING TOTAL APPLICATION 1N INCHES FIELD Jan-24 Feb-24 Mar-24 Apr-24 May-24 Jun-24 Jul-23 Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 12 MONTH TOTAL Front 9 Greens 0.15 0.47 0.5 1.26 1.2 1.44 1.17 1.19 0.67 0.54 0.7 0.14 9.43 Back 9 Greens 0.16 0.32 0.28 1.64 1.6 1.61 1.33 1.27 0.7 0.59 0.78 0.16 10.44 Front 9 Fairways 0 0.04 0.19 0.21 0.21 1.22 0.36 0.44 0.07 0.08 1.03 0.1 3.95 Back 9 Fairways 0 0 0.25 0.29 0.29 1.61 0.52 0.58 0.1 0.21 0.38 0.09 4.32 Practice Greens 0.14 0.12 0.04 0.08 0.08 0.36 0.29 0.23 0 0 0.03 0 1.37 Practice Areas 0 0.2 0.40 1.18 1.12 2 0.87 1.12 0.73 3.99 0.89 0.16 12.66 Driving Range Tees 0 0 0 0.21 0.23 0.83 0.37 0.43 0.26 0.82 0.3 0 3.45 Driving Range Fairways 0 0.08 0 0.03 0.03 0 0 0.01 0 0 0 0 0.15