Loading...
HomeMy WebLinkAbout20160149 Ver 1_Emails_20151229Ward, Garcy From: Sent: To: Subject: Attachments: Good Morning, Peele, Catherine D Tuesday, December 29, 2015 9:08 AM Wheeler, Tracey L SAW (Tracey.L.Wheeler@usace.army.mil); Ward, Garcy Southdock Dredging Request Southdock Dredge Point 12-2015 ljpg The NCDOT Ferry Division is requesting authorization to perform maintenance dredging at the Southdock Ferry Terminal. This dredging project will be completed by the Marine Maintenance crew with the pipeline dredge that is currently in use. We anticipate starting this project as soon as the Hatteras Inlet project is complete, an estimated start time would be in the early part of January 2016. The proposed area that is being dredged has been dredged many times before under our current permit but has recently built back up to a point that is causing trouble for the ferries coming in and out of the terminal. The sand caught here creates a very shallow and long point that extends into the deeper water channel. The dredging project will remove approximately 1,500 cubic yards of material, which will be placed into the Southdock Spoil Site, and will allow for easier and safer passage to and from the ferry terminal. Dredging operations will be kept 10' off of the bulkhead. Attached is a survey map that outlines that area that we are to dredge. If you need any additional information please let me know. Thank you, Catherine Peele Environmental Specialist Ferry Division 252 305 7288 mobile cdpeele@ncdot.gov 159 Lucinda Drive Powells Point, NC 27966 �1`Y7�1� C:'��a1i`�til'.J'�'al?"'{,�1?C:'a f'�'a �t?"'{ ii`'�'at`Y7 �r"�'si �('{"'{I`�tiki 'si ti(dt�J(�i:'% f�s f`?� r�"ti'�'a1?r"� �.f�i`'�'a�ll?� �(It�J�li:' ��i:'��a1"f:�si 'L�V{/ �t?"'{ 1`Y7�4� �� f:�lsii:'�'�'ati�C� �'�'a �r"�'1"f:�I'.'s'�i{`'�ti �nr�i'. �;e rr�,��ar,ci�r��;t� :a �r�ci 'ranr :4�,i;� ;��r�ci�r i;, ;,ubj��;: :a :4�,� �;.C`. ;�=ubii�; r�t�carc:7;� _�Ua �r�ci nr�, b� c:7�;��;�a;��G:7 :� :4�,irc:7 ��r:i�s.