HomeMy WebLinkAbout310196_30 day lagoon fb_20240808PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 31-196 County: Duplin
Facility Name: Ecosystem Farms, Inc.
Certified Operator Name: Mike Stocker Operator Number: 18159
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: ECO 1
Spillway(Y or N): N
Level(inches): 16
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
'Attach a complete schedule with corresponding animal units and dates fro depopulation
'if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: as conditions permit
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
Mike Stocker Phone: (910) 293-3606
Facility Owner/Manager (print)
QY� �-e— l3 Ci e i Date: 8/8/2024
Facility Owner/Manager (signature)
00/3Z/Z (AEC] 0£) Hod
NVd 'ql L Ohbb = (II uolloes wojl u cull) papdde puel aq of NVd lelol 'm
30NVIVS NVd IIVZ19AO Vod S,A1IlIOVd 'Al
NVd 'ql 9 Z8£S = (3 uwnloo to wns) splall lie Jo; algeilene NVd lelol'A
pouad umop meip !ep O£ 6uunp sdoJo 6UTAIaOGJ
a.... a.. Ri vv,pnudric Min Jxau Jo aieo uoneondde 6ulpua clon luaiino alelS,
w
ZZI,
ZZl
90ZZ
90 ZZ
3aillW
lell!W
Zd-Zl
Ll-ld
1, 003
1, 003
IMopulm uogeopdde n
s x i uwnloo
(,sgl)O131d
2JOd 30NV1tl9
NVd 1V1011
(aloe/q)
aoueleq NVd Z
2i'dI 6wuiewai s
SGJOe 7
d0J0 'C)
# pla4 .d
#loaf; "0
'601113d AV0 0£ SIHl VNIM IU Udi ICGv 7a iVmxv. 1MV0 n mmv+o ,+,++ •+ •• --•---
NMOO MVHO kva o£'JNiuna SdOUO 319VIlVAV UOd'JNINIVWBU 30NV1VS NVd 1V101 'Ill
NVd glL'O"l,=9+9+V+£+Z+i,soull•u
NVd ql
= w Gull
:OI aJnlonJ3S '9
NVd ql
= uJ Gull
:Ol aJnlonJ3S 'S
NVd ql
= W Gull
:OI aJnlonJ3S 4
NVd ql
= w Gull
:OI ainprilS '£
NVd ql
= w Gull
:01 aJnlonJ3S 'Z
NVd ql L'044L = w Gull 6 003 :OI ainlonilS L
A11110Vd 210d saunionuiS 31SVM llV NI SNOIIVA319 3E)"OIS WNO1S -NH
VZI21A 9Z UOJaNV ONVOS33N:i l"nionN1S NIHlIM O3N019 NVd d0 SONnOd 1V1O1 'II
oo/lZ/Z Ve0 od Vod
papaau 1! 6wdwnd j01 algellene
sl puel leuoglppV -llwiad suallpuoo play pue jagleam se anuyuoo 1pm splay /gelds 6ullslxe oluo uoye6wl
-R4!jpe1 6ulnla0ai
aql le slanal pjeogaatl uoo6el pue uollelndod pjaq aql 6ulpiebei uopewiolul apinad 'p poel pappied jegloue
of palneq eq of sl alsem lewlue ll aoueleq NVd lleJano ag1 alelnolsoai pue algel aoueleq NVd ag101 splay
esagl ppe Tonal uoo6el 6uuamol jol uoydo ue se papnloul aq of eie splay maul uollewjolul mou uo poseq
NVd mau alelnoleow 'suoydo uollonpai pjaq pue lneq V dwnd iod 'ola 'uoyonpaj pjaq 'uogelndodap 'Ineq
pue dwnd 6ulpnlou! ejeq uoyoe to asinoo lsll 7logap a se mogs lou seop R aull lI 804ap a se mogs lsnw A aul-I
NVd 'qI ZV6£- _ (x - m) aoueleq NVd IleJa^O 'A
NVd 'qI 9 Z8£9 = (III uolloas wa; n QUID aoueleq NVd Bululewai s,dojo •x
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1, Structure Name/Identifier (ID): JECO 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d, top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
16.0 inches
19.0 inches
3.0 inches
225093 ft2
420924 gallons
sa days
g. volume of waste produced according to structural design 232561 ft3
h. current herd # 2800 certified herd #F 4900
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days4ine f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 3/8/2024
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
132892 W
ft3
LL 1�31304JJft3
630698 gallons
1.37 Ibs/1000 gal.
1440.7 lbs. PAN
PoA (30 Day) 2121/00