Loading...
HomeMy WebLinkAbout310196_30 day lagoon fb_20240808PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 31-196 County: Duplin Facility Name: Ecosystem Farms, Inc. Certified Operator Name: Mike Stocker Operator Number: 18159 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: ECO 1 Spillway(Y or N): N Level(inches): 16 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation 'if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: as conditions permit I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Mike Stocker Phone: (910) 293-3606 Facility Owner/Manager (print) QY� �-e— l3 Ci e i Date: 8/8/2024 Facility Owner/Manager (signature) 00/3Z/Z (AEC] 0£) Hod NVd 'ql L Ohbb = (II uolloes wojl u cull) papdde puel aq of NVd lelol 'm 30NVIVS NVd IIVZ19AO Vod S,A1IlIOVd 'Al NVd 'ql 9 Z8£S = (3 uwnloo to wns) splall lie Jo; algeilene NVd lelol'A pouad umop meip !ep O£ 6uunp sdoJo 6UTAIaOGJ a.... a.. Ri vv,pnudric Min Jxau Jo aieo uoneondde 6ulpua clon luaiino alelS, w ZZI, ZZl 90ZZ 90 ZZ 3aillW lell!W Zd-Zl Ll-ld 1, 003 1, 003 IMopulm uogeopdde n s x i uwnloo (,sgl)O131d 2JOd 30NV1tl9 NVd 1V1011 (aloe/q) aoueleq NVd Z 2i'dI 6wuiewai s SGJOe 7 d0J0 'C) # pla4 .d #loaf; "0 '601113d AV0 0£ SIHl VNIM IU Udi ICGv 7a iVmxv. 1MV0 n mmv+o ,+,++ •+ •• --•--- NMOO MVHO kva o£'JNiuna SdOUO 319VIlVAV UOd'JNINIVWBU 30NV1VS NVd 1V101 'Ill NVd glL'O"l,=9+9+V+£+Z+i,soull•u NVd ql = w Gull :OI aJnlonJ3S '9 NVd ql = uJ Gull :Ol aJnlonJ3S 'S NVd ql = W Gull :OI aJnlonJ3S 4 NVd ql = w Gull :OI ainprilS '£ NVd ql = w Gull :01 aJnlonJ3S 'Z NVd ql L'044L = w Gull 6 003 :OI ainlonilS L A11110Vd 210d saunionuiS 31SVM llV NI SNOIIVA319 3E)"OIS WNO1S -NH VZI21A 9Z UOJaNV ONVOS33N:i l"nionN1S NIHlIM O3N019 NVd d0 SONnOd 1V1O1 'II oo/lZ/Z Ve0 od Vod papaau 1! 6wdwnd j01 algellene sl puel leuoglppV -llwiad suallpuoo play pue jagleam se anuyuoo 1pm splay /gelds 6ullslxe oluo uoye6wl -R4!jpe1 6ulnla0ai aql le slanal pjeogaatl uoo6el pue uollelndod pjaq aql 6ulpiebei uopewiolul apinad 'p poel pappied jegloue of palneq eq of sl alsem lewlue ll aoueleq NVd lleJano ag1 alelnolsoai pue algel aoueleq NVd ag101 splay esagl ppe Tonal uoo6el 6uuamol jol uoydo ue se papnloul aq of eie splay maul uollewjolul mou uo poseq NVd mau alelnoleow 'suoydo uollonpai pjaq pue lneq V dwnd iod 'ola 'uoyonpaj pjaq 'uogelndodap 'Ineq pue dwnd 6ulpnlou! ejeq uoyoe to asinoo lsll 7logap a se mogs lou seop R aull lI 804ap a se mogs lsnw A aul-I NVd 'qI ZV6£- _ (x - m) aoueleq NVd IleJa^O 'A NVd 'qI 9 Z8£9 = (III uolloas wa; n QUID aoueleq NVd Bululewai s,dojo •x PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1, Structure Name/Identifier (ID): JECO 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d, top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 16.0 inches 19.0 inches 3.0 inches 225093 ft2 420924 gallons sa days g. volume of waste produced according to structural design 232561 ft3 h. current herd # 2800 certified herd #F 4900 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days4ine f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 3/8/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 132892 W ft3 LL 1�31304JJft3 630698 gallons 1.37 Ibs/1000 gal. 1440.7 lbs. PAN PoA (30 Day) 2121/00