Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WQ0045678_More Information (Received)_20240805
State of North Carolina Department of Environmental Quality DWR Division of Water Resources Division of Water Resources Flow Tracking for Sewer Extension Applications (FTSE 10-23) Entity Requesting Allocation: Fales Landing Project Name for which flow is being requested: 8055 Masonboro, LLC More than one FTSE may be required for a singleproject if the owner of the WWTP is not responsible for allpump stations along the route of the proposed wastewater flow. I. Complete this section only if you are the owner of the wastewater treatment plant. a. WWTP Facility Name: M'Kean Maffit (Southside)WWTP b. WWTP Facility Permit#: NPDES NC 0023973 All flows are in MGD c. WWTP facility's permitted flow 12.000 d. Estimated obligated flow not yet tributary to the WWTP 3.710 e. WWTP facility's actual avg. flow 8.044 f. Total flow for this specific request 0.00450 g. Total actual and obligated flows to the facility 11.755 h. Percent of permitted flow used 98.0 II. Complete this section for each pump station you are responsible for along the route of this proposed wastewater flow. List pump stations located between the project connection point and the WWTP: (A) (B) (C) (D)=(B+C) (E)=(A-D) Design Approx. Obligated, Total Pump Pump Average Current Not Yet Current Flow Station Station Firm Daily Flow** Avg. Daily Tributary Plus (Name or Permit Capacity, * (Firm/pf), Flow, Daily Flow, Obligated Available Number) No. MGD MGD MGD MGD Flow Capacity*** 76 WQ0035061 5.616 2.246 1.066 0.645 1.711 0.536 71 WQ0036178 1.800 0.720 0.563 0.043 0.607 0.113 124 N/A 0.331 0.083 0.007 0.000 0.008 0.075 *The Firm Capacity(design flow)of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor(pf)not less than 2.5,per Section 2.02(A)(4)(c)of the Minimum Design Criteria. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where the Available Capacity is<0. Downstream Facility Name (Sewer): Cape Fear Public Utility Authority Downstream Permit Number: Page 1 of 6 FTSE 10-23 III. Certification Statement: I Jeff Theberge, CFPUA Eng. Mgr. certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Sections I and II plus all attached planning assessment addendums for which I am the responsible parry. Signature of this form certifies that the receiving collection system or treatment works has adequate capacity to transport and treat the proposed new wastewater. . 5e# i7tete er e 08/01/2024 Jeff ThWerge(Aug 1,2024 4:15 EDT) Signing Official Signature Date Engineering Manager Title of Signing Official Page 2 of 6 FTSE 10-23 Flow Tracking for Sewer Extension Permit Application Final Audit Report 2024-08-01 Created: 2024-08-01 By: Jeff Theberge(Jeff.Theberge@cfpua.org) Status: Signed Transaction ID: CBJCHBCAABAAXAo_Rm653L1znym1HKQA—j_X1LDglumO "Flow Tracking for Sewer Extension Permit Application" History Document created by Jeff Theberge (Jeff.Theberge@cfpua.org) 2024-08-01 -6:11:24 PM GMT C'-► Document emailed to Jeff Theberge (Jeff.Theberge@cfpua.org)for signature 2024-08-01 -6:11:28 PM GMT GS© Document e-signed by Jeff Theberge (Jeff.Theberge@cfpua.org) E-signature obtained using URL retrieved through the Adobe Acrobat Sign API Signature Date:2024-08-01 -6:15:15 PM GMT-Time Source:server Agreement completed. 2024-08-01 -6:15:15 PM GMT Q Adobe Acrobat Sign