HomeMy WebLinkAboutNCC242300_ESC Approval Submitted_20240807 CITY OF BURLINGTON
ENGINEERING DEPARTMENT
W.Todd Lambert,P.E.
City Engineer
June 6, 2024
LETTER OF APPROVAL
Mackintosh Development, LLC
ATTN: Shawn Cummings
1141 Jay Lane
Graham, NC 27253-
RE: Turnberry @ MOTL (2024)
Acres Approved: 11 Acres
Project ID: 732
County: Alamance
City: Burlington
Address: Bonnar Bridge Parkway
River Basin: Cape Fear
Stream Classification: Back Creek: WS-V; NSW
Submitted By: Mackintosh Development, LLC
Date Received by City: 05/17/2024
Plan Type: Residential Subdivision
Alamance Tax Map: 3-23-71
Dear Shawn Cummings,
This office has reviewed the subject erosion and sedimentation control plan. We find
the plan to be acceptable and hereby issue this Letter of Approval. The enclosed
Certificate of Approval must be posted at the job site. This plan shall expire three (3)
years following the date of approval, if no land disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOl) form requesting a Certificate of Coverage (COC) under
the NCG010000 Construction General Permit. After the form is reviewed and found to be
complete,you will receive a link with payment instructions for the $100 annual permit
fee. After the fee is processed, you will receive the COC via email. As the Financially
MAILING ADDRESS: TELEPHONE:(336)222-5050
425 S.LEXINGTON AVE. FAX:(336)513-5467
BURLINGTON,NC 27215 WWW.BURLINGTONNC.GOV
Letter of Approval
Shawn Cummings
June 6, 2024
Page 2 of 3
Responsible Party shown on the FRO form submitted for this project,you MUST obtain the
COC prior to commencement of any land disturbing activity. The eNOI form may be
accessed at deq.nc.gov/NCG01. Please direct questions about the eNOI form
to the Stormwater Program staff in the Raleigh central office. If the owner/operator of this
project changes in the future, the new responsible party must obtain a new COC.
Title 15A NCAC 4B .0118(a) and the NCG01 permit require that the following
documentation be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also,this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic
inspection to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Act is performance-oriented,
requiring protection of existing natural resources and adjoining properties. If,
following the commencement of this project, it is determined that the erosion and
sedimentation control plan is inadequate to meet the requirements of the
Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-
51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with
Federal and State water quality laws, regulations, and rules. In addition, local city or
county ordinances or rules may also apply to this land-disturbing activity. This
approval does not supersede any other permit or approval.
Please note that this approval is based in part on the accuracy of the information
provided in the Financial Responsibility Form, which you provided. You are
requested to file an amended form if there is any change in the information included
on the form. In addition, it would be helpful if you notify this office of the proposed
starting date for this project.
Letter of Approval
Shawn Cummings
June 6, 2024
Page 3 of 3
Your cooperation is appreciated.
Sincerely,
4 .,Z., ?,ei>7,40w7
David B. Bowman, PE CFM
Principal Engineer
Enclosures: Certificate of Approval
NPDES NCG01 Fact Sheet
ec: Office file