HomeMy WebLinkAboutNC0087998_Authorization to Construct_20050314Mr. William E. Grantmyre, President
Heater Utilities, Inc.
Post Office Box 4889
Cary, North Carolina 27519
SUBJECT:
Dear Mr. Grantmyre:
March 14, 2005
Michael F. Easley, Governor
William G. Ross Jr., Secretary
North Carolina Department of Environment and Natural Resources
Alan W. Klimek, P.E. Director
Division of Water Quality
DECEIVED
IMA p
" 9005
STR4l�T60�
'-�
Authorization to Construct CHITS S
At C N 087998 0
I _. WM�
0 V. A 1 _
Heater Utilities, Inc.
Round Meadows Well #3 Dechlorination System
Wake County
A fast track application for Authorization to Construct dechlorination facilities was
received on March 7, 2005, by the Division. Authorization is hereby granted for the construction
of modifications to the existing Round Meadows Well #3 with discharge of filter backwash into
Juniper Creek of the Neuse River Basin.
This authorization results in no increase in design or permitted capacity and is awarded
for the construction of the following specific modifications:
Installation of a tablet dechlorination system, pursuant to the fast track application
received on March 7, 2005, and in conformity with the Minimum Design Criteria
for Dechlorination Facilities.
This Authorization tp Construct is issued in accordance with Part III, Paragraph A of
NPDES Permit No. NCO087998 issued August 27, 2004, and shall be subject to revocation
unless the wastewater treatment facilities are constructed in accordance with the conditions and
limitations specified in Permit No. NC0087998.
In the event that the facilities fail to perform satisfactorily, including the creation of
nuisance conditions, the Permittee shall take immediate corrective action, including those as may
be required by this Division, such as the construction of additional or replacement wastewater
treatment or disposal facilities.
The Raleigh Regional Office, telephone number (919) 571-4700, shall be notified at least
forty-eight (48) hours in advance of operation of the installed facilities so that an on site
inspection can be made. Such notification to the regional supervisor shall be made during the
normal office hours from 8:00 a.m. until 5:00 p.m. on Monday through Friday, excluding State
Holidays.
One
NCarolina
JVaiur,111Y
North Carolina Division of Water Quality 1617 Mail Service Center Raleigh, NC 27699-1617 Phone (919) 733-7015 Customer Service
Internet: h2o.enr.state.nc.us 512 N. Salisbury St. Raleigh, NC 27604 FAX (919) 733-2496 I-877-623-6748
An Equal opportunity/Affirmative Action Employer — 500/6 Recycled/1 0% Post Consumer Paper
Mr. William Grantmyre
March 14, 2005
Page 2
Pursuant to 15A NCAC 2H .0140, upon completion of construction and prior to operation of
these permitted facilities, the completed Engineering Certification form attached to this permit shall be
submitted to the address provided on the form.
Upon classification of the facility by the Certification Commission, the Permittee shall
employ a certified wastewater treatment plant operator to be in responsible charge (ORC) of the
wastewater treatment facilities. The operator must hold a certificate of the type and grade at least
equivalent to or greater than the classification assigned to the wastewater treatment facilities by
the Certification Commission.
The Permittee must also employ a certified back-up operator of the appropriate type and
grade to comply with the conditions of T15A:8G.0202. The ORC of the facility must visit each
Class I facility at least weekly and each Class II, III and IV facility at least daily, excluding
weekends and holidays, must properly manage the facility, must document daily operation and
maintenance of the facility, and must comply with all other conditions of T 15A:8G.0202.
A copy of the approved plans and specifications shall be maintained on file by the
Permittee for the life of the facility.
During the construction of the proposed additions/modifications, the permittee shall
continue to properly maintain and operate the existing wastewater treatment facilities at all times,
and in such a manner, as necessary to comply with the effluent limits specified in the NPDES
Permit.
You are reminded that it is mandatory for the project to be constructed in accordance
with the North Carolina Sedimentation Pollution Control Act, and, when applicable, the North
Carolina Dam Safety Act. In addition, the specifications must clearly state what the contractor's
responsibilities shall be in complying with these Acts.
Failure to abide by the requirements contained in this Authorization to Construct may
subject the Permittee to an enforcement action by the Division of Water Quality in accordance
with North Carolina General Statute 143-215.6A to 143-215.6C.
The issuance of this Authorization to Construct does not preclude the Permittee from
complying with any and all statutes, rules, regulations, or ordinances which may be imposed by
other government agencies (local, state, and federal) which have jurisdiction.
Mr. William Grantmyre
March 14, 2005
Page 3
If you have any questions or need additional information, please do not hesitate to contact
Cecil G. Madden, Jr., P.E. at telephone number (919) 715-6203.
Sincerely,
j6eLat-U
tlr,- Alan W. Klimek, P.E.
MH/cgm
cc: Eddie Sasser, P.E. — Heater Utilities, Inc.
Wake County Health Department
Raleigh Regional Office; Surface Water Protection
Technical Assistance and Certification Unit
Daniel Blaisdell, P.E.
SWP-PSB
Cecil G. Madden, Jr., P.E.
Mark Hubbard, E.I.
A to C File
RECEIVED
LOAid 5ECTbN