Loading...
HomeMy WebLinkAbout090005_30 day poa_20240807PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: Facility Name 5-Sep Frenches Creek County: Bladen Certified Operator Name: Brandon Norris Operator Number: 1004381 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon Name/ID Spillway(Y or N): Level(inches): Lagoon Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Fin N 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 1/23/2024 I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ham Right Farm David Mixon Manager Phone Facility Owner/Manager (print) Date Facility Owner/Manager (signature) 910-862-4549 1 /24/2024 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Fin line m = 1400.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN In. lines 1+2+3+4+5+6= 1400.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) ^ ~ u. application window' 1 small grain overseed 2.56 50.00 128.0 Sep -Apr 2 small grain overseed 1.59 50.00 79.5 Sep -Apr 3 small grain overseed 3.73 50.00 186.5 Sep -Apr 4 small grain overseed 2.20 50.00 110.0 Sep -Apr 5 small grain overseed 4.98 50.00 249.0 Sep -Apr 6 small grain overseed 5.21 50.00 260.5 Sep -Apr 7 small grain overseed 4.75 50.00 237.5 Sep -Apr 8A small grain overseed 3.99 50.00 199.5 Sep -Apr 8B small grain overseed 0.96 50.00 48.0 Sep -Apr 9 small grain overseed 5.64 50.00 282.0 Sep -Apr 10A small grain overseed 4.59 50.00 229.5 Sep -Apr 10B small grain overseed 1.41 50.00 70.5 Sep -Apr 11A small grain overseed 4.12 50.00 206.0 Sep -Apr 11 B small grain overseed 1.34 50.00 67.0 Sep -Apr 12 small grain overseed 3.10 50.00 155.0 Sep -Apr 13 small grain overseed 2.21 50.00 110.5 Sep -Apr 14 small grain overseed 2.90 50.00 145.0 Sep -Apr 15 small grain overseed 3.29 50.00 164.5 Sep -Apr Sub1 small grain overseed 4.53 50.00 226.5 Sep -Apr Sub2 small grain overseed 2.261 50.001 113.0 Sep -Apr Sub3 small grain overseed 19.961 50.001 998.0 Sep -Apr 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4266.0 lb. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 1400.8 lb. PAN PoA (30 Day) 2/21 /00 x. Crop's remaining PAN balance (line v from section III) = 4266.0 lb. PAN y. Overall PAN balance (w - x) _ -2865 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Irrigation onto existing spray fields will continue as weather and field conditions permit. PoA (30 Day) 2/21 /00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Fin 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 27.61 inches c. line b - line a (inches in red zone) = 9.6 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 148921 ft2 e. line c/12 x line d x 7.48 gallons/ft3 891143 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 378505 ft3 h. current herd # 11481 certified herd # 11481 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 1/16/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 378505 ft3 248653 ft3 197253 ft3 1027766 gallons 0.73 Ibs/1000 gal. 1400.8 Ibs. PAN PoA (30 Day) 2/21 /00