HomeMy WebLinkAbout820305_30 day_20240805PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Facility Number: 82-305 County: Sampson
Facility Name: Ronald Wooten Farm
Certified Operator Name: Ronnie Wooten Operator Number: 990016
1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the
lowest point on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5
Lagoon Name/ID: 1
Spillway(Y or N): N
Level(inches): 18
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more structures.
Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are
within acceptable ranges.
X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A
30 day Plan of Action is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste
to be pumped and hauled is reflected in section III tables. Included within this plan is a list
of the proposed sites with related facility numbers, number of acres and receiving crop
information. Contact and secure approval from the DWQ prior to transfer of waste to a site
not covered in the facility's CAWMP.
Operation will be partially or fully depopulated.
*Attach a complete schedule with corresponding animal units and dates for depopulation
*if animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 8/5/24
I hereby certify that I have reviewed the information listed above and included within the
attached Plan of Action, and to the best of my knowledge and ability, the information is
accurate and correct.
/ n t r I t/, v l Phone:
Faci ity Owner/Manager (print)
Date: O J q
Facility Owner Manager (signature)
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Lagoon #1 line m = 509.4 lb PAN
2. Structure ID: line m = lb PAN
3. Structure ID:
4. Structure ID:
5. Structure ID:
6. Structure ID:
n. lines 1+2+3+4+5+6=
line m = lb PAN
line m = lb PAN
line m = lb PAN
line m = lb PAN
509.4 lb PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD_
o. tract#
p. field #
q. crop
r. acres
s. remairirg IRR-2
PAN balance
(Iblwre)
I. TOTAL PAN
BALANCEFOR
FIELD (lbs.)
column rxs
u. application window'
2873
3A
Berm
1.49
224.00
333.8
Mar -Sep
2873
3B
Berm
7.05
224.00
1579.2
Mar -Sep
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 1913.0 lb. PAN
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 509.4 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 1913.0 lb. PAN
y. Overall PAN balance (w -x) = -1404 lb. PAN
e ymust showas a deficit. If line y does not show as a deficit, list course of action here including pump and haul,
3opulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new
)ration. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance
PoA (30 Day) 2/21/00
PoA (30 Day) 2/21 /00
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier(ID):
Lagoon #1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
18.0 inches
19.0 inches
1.0 inches
65000 ft2
40517 gallons
180 days
g. volume of waste produced according to structural design 80307 ft3
h. current herd # 2383 certified herd #F 2448
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 1 6/18/24
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
78175 ft3
�ft3
37917 It
144728 gallons
2.75 Ibs/1000 gal.
bYrixll:�P71►1
PoA (30 Day) 2/21/00