Loading...
HomeMy WebLinkAbout820691_30 day poa_20240730PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-193 County: Sampson Facility Name: Ronald Peterson & Sons 1-4 Certified operator Name: Ronald Peterson Operator Number: 20266 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1-4 Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates fro depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 7/30124 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ronald Peterson Phone: 910-385-8792 Facility Owner/Manannaag.�er�(pr_int) Date: 7/29/2024 Facility Owner/Manager (signature) Rill 6T1 I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 1-4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 84000 ft2 e. line c/12 x line d x 7.48 gallons/ft' 52360 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 96926 ft3 h. current herd #F---29401 certified herd # 2940 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 7/25/2024 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 96926 ft' Oft3 49000 ft3 181921 gallons 1.60 375 lbs. PAN II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 1-4 line m = 374.8 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line m = lb PAN 4. Structure ID: line m = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 374.8lbPAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (lbs.) column r x s u. application window' 6212 6 Bermuda 2.14 275.00 588.5 MAR-SEP 6212 7 Bermuda 2.30 190.00 437.0 MAR-SEP v. i otai rAm ava lame for an nelas tsum or column r/ _ IV. FACILITY'S PDA OVERALL PAN BALANCE w. Total PAN to be land applied (line In from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) _ IUZt).b 10. VAN 374.8 lb. PAN 1025.5 lb. PAN -651 lb. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. Self reported to DWR on 7/24/24. PLAN OF ACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-691 County: Sampson Facility Name: Ronald Peterson & Sons 5-10 Certified operator Name: Ronald Peterson Operator Number: 20266 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 5-10 Spillway(Y or N): N Level(inches): 18 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. 'Attach a complete schedule with corresponding animal units and dates fro depopulation `if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 7/30124 Weather permitting. I hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ronald Peterson Phone: �Facility Owner/Manager (print) l Gy�i� d Ar Date: Facility Owner/Manager (signature) 910-385-8792 7/29/2024 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 1 5-10 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 18.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 1.0 inches top of dike surface area according to design d. (area at below structural freeboard elevation) 139392 ft2 e. line c/12 x line d x 7.48 gallons/ft' 86888 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 145389 ft3 h. current herd # F 44101 certified herd # 4410 actual waste produced = current herd # x line g = 145389 ft' certified herd # i. volume of wash water according to structural design Oft3 j. excess rainfall over evaporation according to design 81312 ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 282621 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated F 7/25/2024 1.7 m. ((lines e + k)/1000) x line I = 628 lbs. PAN REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) It. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YRJ24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 5-10 line m = 628.2 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: line In = lb PAN 4. Structure ID: line In = lb PAN 5. Structure ID: line m = lb PAN 6. Structure ID: line m = lb PAN IT. lines 1+2+3+4+5+6= 628.2 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) I. TOTAL PAN BALANCE FOR FIELD(lbs.) column r x a u. application window' 6333 1 Bermuda 1.38 224.50 309.8 MAR-SEP 6333 2 Bermuda 2.87 168.20 482.7 MAR-SEP 6333 3 Bermuda 2.87 196.00 562.5 MAR-SEP V. I oral VAN avanaole Tor ail nelOs (sum OT column r) _ IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line IT from section II) _ x. Crop's remaining PAN balance (line v from section III) _ y. Overall PAN balance (w - x) _ ldbb.l ID. PAN 628.2 lb. PAN 1355.1 lb. PAN 7777 lb. PAN ine y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and aul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN ased on new information. If new fields are to be included as an option for lowering lagoon level, add these gilds to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to nother permitted facility, provide information regarding the herd population and lagoon freeboard levels at the �ceiving facility. Self reported to DWR on 7/24/24.